| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC 9 305 NACHIPUDUR KALAPPANAICKENPATTI SENDAMANGALAM NAMAKKAL 637 404 | NAMAKKAL | TAMIL NADU | 637404 | ₹5.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.3 Cr+₹11.3 L (2.16%)Rejected-AOC | ₹5.3 Cr+₹11.3 L (2.16%) | L2 | Rejected-AOC L2 |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
14 May 2025, 3:00 pmClosed
Additional Collector (Development)
DRDA, Salem
Salem District - P.N.Palayam Block - MRL06- Soolankurichi to Pachadu Road Via Thalakkarai - PMGSY - III - 2024-2025 - Batch - I TN15-257.
2025_RDTN_140127_1
TN15257
Open Tender
Civil Works - Roads
Item Rate
270 days
DRDA
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹10.6 L
DRDA, Salem
4 Jul 2025
11 Apr 2025
14 May 2025
11 Apr 2025
14 May 2025
11 Apr 2025
24 Apr 2025
Amount
1) Strengthening of the road from MRL06-Soolankurichi to Pachadu Road Via Thalakkarai Km. 0/0 - 5/600
Clearing and grubbing road land including uprooting wild vegetation,grass ,bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 502.
Control Section . Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 509
New Technology - Cold Mix. Mix Seal Surfacing (Using Coldmix):-Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates using emulsion SS2 bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 3 X 3.75 X 0.25 = 2.81
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803
Providing and erecting Single sided Double Guard Metal Beam Crash Barrier System 1.70m high, comprising of 3mm thick wall “W” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 950mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification and as directed by the Engineer-in-charge
Providing and Fixing 'Logo' of PMGSY Project
Providing and fixing Name board
Providing and Fixing 'Citizen information Board' of PMGSY Project
Providing and Fixing 'Maintenance information Board' of PMGSY Project
Providing and fixing of Retro Reflectorised Cautionary , Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5mm thick Aluminium Sheet fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 45cm x 45cm x 60cm below Ground level etc complete including 7 Years warrenty for the Retro Reflective Sheeting as per Clause 6.9 of IRC 67 - 2010 Specification ( as per MORTH & Speccification no : 801 )
60 Cm Equilateral Trainagle (Cautinary) Sign Board
60CM Circular (Mandatory) Sign Board
Chevron Signs 90Cm Octagon (Curves)
Reflector
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(ii) Ordinary Kilometer Stone (Precast)
(iii) 200 m stone (precast)
iii) Guard Stone
Provision for CC Pavement Works
Provision for CC Pavement KM 1/250-1/300
Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm minimum cement content of 375 kg per cum, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.
Provision for CC Pavement KM 2/280-2/330
Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm minimum cement content of 375 kg per cum, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.
Provision for CC Pavement KM 2/590-2/640
Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm minimum cement content of 375 kg per cum, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.
Provision for CC Pavement KM 3/550-3/750
Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm minimum cement content of 375 kg per cum, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.
Provision for CD Works
Construction of 1.5 m RCC Slab culvert @ Ch. 1/108,1/598
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(PCC)
Dismantling of Culvert @ 1/108
Dismantling of Culvert @ 1/598
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (Brick/Tilework)
Dismantling of Culvert @ 1/108
Dismantling of Culvert @ 1/598
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (900mm dia Pipe)
Dismantling of Culvert @ 1/108
Dismantling of Culvert @ 1/598
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Cement concrete 1 : 2.5 : 5 mix using M15 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Below Sill Level)
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Cement concrete 1:1.5:3 using M25 Grade HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. (M25)
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Culvert @ 1/108
Construction of Culvert @ 1/598
Construction of 1.5 m RCC Slab culvert @ Ch. 2/188,2/450,2/590,2/950
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC)
Dismantling of Culvert @ 2/188
Dismantling of Culvert @ 2/450
Dismantling of Culvert @ 2/590
Dismantling of Culvert @ 2/950
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (Brick/Tilework)
Dismantling of Culvert @ 2/188
Dismantling of Culvert @ 2/450
Dismantling of Culvert @ 2/590
Dismantling of Culvert @ 2/950
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.(900mm dia Pipe)
Dismantling of Culvert @ 2/188
Dismantling of Culvert @ 2/450
Dismantling of Culvert @ 2/590
Dismantling of Culvert @ 2/950
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Cement concrete 1 : 2.5 : 5 mix using M15 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Below Sill Level)
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Cement concrete 1:1.5:3 using M25 Grade HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. (M25)
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Culvert @ 2/188
Construction of Culvert @ 2/450
Construction of Culvert @ 2/590
Construction of Culvert @ 2/950
Construction of 1.5 m RCC Slab culvert @ Ch. 3/280,3/910
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC)
Dismantling of Culvert @ 3/280
Dismantling of Culvert @ 3/910
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (Brick/Tile work)
Dismantling of Culvert @ 3/280
Dismantling of Culvert @ 3/910
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (900mm dia pipe)
Dismantling of Culvert @ 3/280
Dismantling of Culvert @ 3/910
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Cement concrete 1 : 2.5 : 5 mix using M15 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Below Sill Level)
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Cement concrete 1:1.5:3 using M25 Grade HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Culvert @ 3/280
Construction of Culvert @ 3/910
Construction of 1.5 m RCC Slab culvert @ Ch. 4/805
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC)
Dismantling of Culvert @ 4/805
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (Brick/Tile work)
Dismantling of Culvert @ 4/805
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (900mm dia Pipe)
Dismantling of Culvert @ 4/805
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Construction of Culvert @ 4/805
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Construction of Culvert @ 4/805
Cement concrete 1 : 2.5 : 5 mix using M15 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation
Construction of Culvert @ 4/805
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Below Sill Level)
Construction of Culvert @ 4/805
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 4/805
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 4/805
Cement concrete 1:1.5:3 using M25 Grade HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Construction of Culvert @ 4/805
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Construction of Culvert @ 4/805
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Construction of Culvert @ 4/805
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Construction of Culvert @ 4/805
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Construction of Culvert @ 4/805
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Culvert @ 4/805
Construction of 5.00 m RCC Slab culvert @ Ch. 2/265
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (PCC)
Dismantling of Culvert @ 2/265
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (Brick/Tiles work)
Dismantling of Culvert @ 2/265
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Dismantling of RCC Culvert @ 2/265
Dismantling of 900mm Dia Pipe Culvert @ 2/265
Dismantling of 900mm Dia Pipe Culvert @ 2/265
Dismantling of 900mm Dia Pipe Culvert @ 2/265
Dismantling of 900mm Dia Pipe Culvert @ 2/265
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Construction of Culvert @ 2/265
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Construction of Culvert @ 2/265
Cement concrete 1 : 2.5 : 5 mix using M15 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation
Construction of Culvert @ 2/265
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Below Sill Level)
Construction of Culvert @ 2/265
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 2/265
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)
Construction of Culvert @ 2/265
Cement concrete 1:1.5:3 using M25 Grade HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Construction of Culvert @ 2/265
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Construction of Culvert @ 2/265
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications
Construction of Culvert @ 2/265
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Construction of Culvert @ 2/265
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Construction of Culvert @ 2/265
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Culvert @ 2/265
Provision for Protective Works
Protective Works KM 0/098-0/131 LHS
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7
Protective Works KM 1/600-1/650 RHS
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7
Protective Works KM 1/920-1/980 RHS
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7
Protective Works KM 3/485-3/500 RHS
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7
Protective Works KM 5/170-5/205 RHS
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7
Protective Works KM 5/355-5/380 RHS
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7
Protective Works KM 5/545-5/565 RHS
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Below Ground level Footing
Cement concrete 1 : 2 : 4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. Above Ground level Body wall
Providing Weepholes in brick masonary, Plain/Reinforced Concrete abutment, wing wall, return wall with 100mm dia AC Pipe extending through the full width of the structures with slope of 1(V) : 20(H) towards drawing face coplete as per drawing and technical specification Clauses 614, 709, 1204 3.7
Construction of V Shape Drain- 5/500 to 5/600
Earth work Excavation for structures as per drawing and technical specifications clause 305.1 including setting out , construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of side
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Base Course)
Providing concrete for Plain/reinforced concrete in open foundations & Sub structure Nominal Mix 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers., compacting etc., complete complying with standard specifications as per drawings and technical specififcations clause 802, 803, 1202 & 1203 and as directed. Below Ground Level Footing:-
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
srmconstructions (BID ID -615933)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .