Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-AOC | 1 | Accepted-AOC LOWEST1 | |
| 2 | 2₹4.3 L+₹1.0 L (31.7%)Rejected-AOC | 2 | Rejected-AOC LOWEST2 |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
28 Feb 2020, 4:30 pmClosed
XEN REW KATHUA
XEN REW KATHUA
Constt of Link road from canal bridge to vivekanand college at Jagatpur Pyt Jagatpur.
2020_RDPR_93412_2
e-NIT No. 14/REWK of 2020 Dated 22 - 02 -2020
Open Tender
Civil Works
Item Rate
15 days
JAGTPUR
AS PER SBD
4 documents required · 4 mandatory
₹1,000
Yes
XEN REW KATHUA
₹10,000
Yes
16 Mar 2020
22 Feb 2020
29 Feb 2020
23 Feb 2020
28 Feb 2020
23 Feb 2020
Amount
Earth work in excavation by manual means in trenches, for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtrfrom cutting edge, diposed earth is to be levelled and neatly dressed in (All kind of soil)
Providing and laying cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:5:10(1 cement :5 coarse sand :10 graded stone aggregade
providing and laying cement concrete in retaining walls, return walls,walls (any thickness ) including attached pilasters,columns,piers, abutments, pillars, posts, sturts,butteresses, stingor laces,courses, parapets, coping,bed blocks,anchor blocks, plain window sills,sunken floors fillets etc. upto floor five level, excluding the cost of centring, shuttering and finishing: 1:3:6 (1 cement : 3 Coarse sand : 6 graded stone aggregate 20mm nominal size)
Dumping of stone including supply stone.
Centering and shuttering including strutting propping etc. and removal of form of works.
Foundations, footings, bases of columns
Retaining walls, return walss, walss (any thickness) including attached pilasters, buttresses, plinth and string courses fillets etc.
Providing and laying of 12mm thick cement plaster 1:4 mix ( 1 cement : 4 fine sand)
Preparation of sub grade by excavating earth an average of 22.5 cm depth, dressing to camber and consolidation with road roller including making good the undulation etc. and disposal of surplus earth upto 50 meters.
Laying water bound macadam with specified stone aggregate stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. Complete ( Payment for stone aggregate, screeings, kankar, moorum and red bajri etc. to be made separately)
Base course with 63 mm to 45 mm size including stone screenings 13.2 mm size.
Supply and stacing of graded stone aggregate at site of size range ( excluding carriages) 63mm to 45mm
Laying water bound macadam with specified stone aggregate stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. Complete ( Payment for stone aggregate, screeings, kankar, moorum and red bajri etc. to be made separately)
Base course with 53 mm to 22.4 mm size including stone screenings 11.2 mm size.
Supply and stacing of graded stone aggregate at site of size range ( excluding carriages) 53mm to 22.4mm
Supply and stacking of stone screeing/ Chipping at site excluding carriage
Carriage of cement average lead 2km by MT
Carriage of sand bajri average lead by 8 km by MT
Carriage of stone average lead by 5 km by MT
Add cost of 2 nos of hume pipe (rate to be quoted by contractor.)
KAMAL SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .