Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-AOC H NO 192 SECTOR 8 121006 | FARIDABAD | HARYANA | 121006 | ₹31.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹40.5 LRejected-AOC BUDHERA TEHSIL LOHURU 127201 | BHIWANI | HARYANA | 127201 | ₹40.5 L | L2 | Rejected-AOC L2 |
| 3 | L3₹43.4 LRejected-AOC E 7 HIG 497 ARERA COLONY BHOPAL 16 M P | BHOPAL | BHOPAL | MADHYA PRADESH | 462016 | ₹43.4 L | L3 | Rejected-AOC L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Ashi Construction Co L1 | M/S LAXMI CONSTRUCTION CO. L3 | Surender Singh L2 |
|---|---|---|---|---|---|---|
| 1.00 | NS Item -Electricity power consumption charges for running of
pumps for dewatering | 59,083.2 | Units | 9.99 ₹5.9 L | 12 ₹7.1 L | 10.66 ₹6.3 L |
| 2.00 | NS Item -lumsum for providing ventilation and safety equiment
for syphon cleaning | 116 | Per meter | 1,000 ₹1.2 L | 1,100 ₹1.3 L | 1,045.1 ₹1.2 L |
| 3.00 | NS Item -Hiring of technical expert cum supervisor | 1 | Per month | 28,483 ₹28,483 | 31,331 ₹31,331 | 29,767.58 ₹29,767.58 |
| 4.00 | NS Item -Supply of HDPE pipe 8`` (200 mm dia) 3.2 kgf/cm2 pressure as per 14151 with male and female coupler and all other accessories | 75 | Mtr. | 491 ₹36,825 | 550 ₹41,250 | 513.14 ₹38,485.50 |
| 5.00 | NS Item -Supply of HDPE pipe (160 mm dia) 3.0 kgf/cm2 pressure as per 14151 with male and female coupler and all other accessories | 100 | Mtr. | 327 ₹32,700 | 360 ₹36,000 | 341.75 ₹34,175 |
| 6.00 | NS Item -Extra Charges for installation of Electric Connection for Pump including all security and fixed charges | 1.5 | Each | 1,00,000 ₹1.5 L | 1,10,000 ₹1.6 L | 1,04,510 ₹1.6 L |
Tender Value
₹38.8 L
EMD Value
₹78,000
Closing Date
14 Mar 2026, 6:00 pmClosed
GAURAV KUMAR
W.S. Divn. Faridabad
Internal Clearance of Syphon of Buriya Nallah under Agra Canal and Gurgaon Canal RD 50000.
2026_HRY_506515_1
2026D0D0865D 5E94 41E0 8CEB C4C69540E59A161IRR
Open Tender
Civil Works
75 days
Faridabad (MC)
3 documents required · 3 mandatory
₹2,500
₹78,000
Yes
24 Mar 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
14 Mar 2026
5 Mar 2026
NS Item -Electricity power consumption charges for running of pumps for dewatering
NS Item -lumsum for providing ventilation and safety equiment for syphon cleaning
NS Item -Hiring of technical expert cum supervisor
NS Item -Supply of HDPE pipe 8`` (200 mm dia) 3.2 kgf/cm2 pressure as per 14151 with male and female coupler and all other accessories
NS Item -Supply of HDPE pipe (160 mm dia) 3.0 kgf/cm2 pressure as per 14151 with male and female coupler and all other accessories
NS Item -Extra Charges for installation of Electric Connection for Pump including all security and fixed charges
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
HSR items
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_585265.xls
BOQ • 0.28 MB
AD0153830.pdf
Additional Documents • 3.10 MB
Download all tender documents and submit your bid