Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-Finance | ₹9.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹9.9 L+₹995.27 (0.10%)Rejected-Finance 804 2 P BLOCK KAKADEV KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.9 L+₹995.27 (0.10%) | L2 | Rejected-Finance L2 |
Tender Value
₹10.0 L
EMD Value
₹99,659
Closing Date
12 May 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Beautification work of foothpath from tiwari sweets to anmol batary shop in ward 58 Under Zone02
2026_NNKAN_1132532_2
1477/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,659
7 Jul 2026
4 May 2026
12 May 2026
4 May 2026
12 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of old tiles includinf stacking of dismentled material etc complete work. | 120 | sqm | 11 | ₹1,320 |
| 2 | Dismenteling of CC floor including stacking of dismentled material etc all complete. | - | sqm | 67 | - |
| 3 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | 60 | Cum | 170 | ₹10,200 |
| 4 | Providing and Laying Cement Concrete(1:6:12,1 cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete,including cost of formwork in foundation and floors. | 1 | Cum | 4,380 | ₹4,375.62 |
| 5 | Providing and Laying Cement Concrete(1:6:12,1 cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete,including cost of formwork in foundation and floors. | - | cum | 8,000 | - |
| 6 | S/F of red sand stone jali 40 mm thick throughout in cement motar 1:3 cement motar including pointing in white cement motar 1:2 Cement stone dust with an adimixture of pigment matching the stone shade jali slab without any Chamfers etc all work. | - | sqm | 6,150 | - |
| 7 | Stone work plain in super structure stone work upto floor level in Cement motar 1:3 Cement motar including centering Shuttering and pointing with white cement motar with an admixture og pigment including all labour work. | 400 | rmt | 1,050 | ₹4,20,000 |
| 8 | S/F of red stone jalli pillar 4"x4"x3"x6' etc all work | 44 | nos | 2,200 | ₹96,800 |
| 9 | Making of Pedastal including all labour work. | 1 | nos | 3,840 | ₹3,840 |
| 10 | Add 18% G.S.T | 1 | tax | 1,52,022.61 | ₹1,52,022.61 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.89 MB
100stamp.pdf
Tender Documents • 0.30 MB
BOQ_2139558.xls
BOQ • 0.28 MB
12052026tn.pdf
Tender Documents • 13.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .