Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 0 JANKI NAGAR NEAR SURAJ HOTEL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 3 | Rejected-Technical GULALI VATIKA GEETA VATIKA SHAHPUR DISTRICT GORAKHPUR | Rejected-Technical ok |
Tender Value
₹30.8 L
EMD Value
₹3.1 L
Closing Date
30 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Irrigation Division, Firozabad
Re-construction of Syphon Aqueduct at km 11.723 of Dy. Pilkhatra on Babarpur drain
2022_UPIDC_730327_6
07/EE/2022-23
Open Tender
Civil Works
Item Wise
60 days
Re-construction of Syphon Aqueduct at km 11.723 of
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
Executive Engineer
₹3.1 L
22 Oct 2022
23 Sept 2022
1 Oct 2022
23 Sept 2022
30 Sept 2022
23 Sept 2022
Amount
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-chargetrenches with removal and disposal of surplus earth as directed by engineer in charge upto distance of 30m from the foundation trenches for other structure.
E/W in foundation in dry and wet soil including lift upto 1.5m and lead upto 30m with back filling, watering & ramming of excavated earth into the stuctures and the side of foundation trenches or in to the plinth with removal and disposal of surplus earth as directed by engineer in charge up to 30m lead including all cost of labour T&p etc complete
Providing concrete for plain concrete M 10 grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20-40 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete, including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Providing concrete for plain concrete M 15 grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Providing concrete for Reinforced cement concrete M20 grade in foundations including cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profit with supply of material T&P etc complete but excluding GST.
Centering shuttering in special type of RCC work such as curves,T-beams,Bridges and syphons etc including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc
Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc
Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST. Total Weight of Steel
Laying Stone Ballast(45-63mm in Layers for Retaining wall, wing wall etc with all cost of material,taxes,royalty,labours T&Ps etc complete excluding GST.
Laying sand in Layers for foundation etc material with all cost of material, taxes, royalty, labours T&Ps etc complete excluding GST.
Surface dewatering of foundation including all arrangement in kwh by diesel pump set.
Brick work in 1:4 cement mortar up to 3M lift & 60 M lead of materials. Including cost of labour,material,T&P etc complete.
Cement pointing /Plastering 1:3 on brick masonry including all cost of labour,material T&P etc complete.
ASHOK KUMAR THEKEDAR
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .