Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.7 Cr+₹6.8 L (4.11%)Rejected-AOC BEHIND ANAJ MANDI SHASTRI NAGAR GALI NO 4 BHIWANI 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | ₹1.7 Cr+₹6.8 L (4.11%) | L2 | Rejected-AOC Refunded |
| 3 | L3₹1.7 Cr+₹7.2 L (4.32%)Rejected-AOC 858 SECTOR 23 127021 2021R109 | BHIWANI | HARYANA | 127021 | ₹1.7 Cr+₹7.2 L (4.32%) | L3 | Rejected-AOC Refunded |
| 4 | L4₹1.7 Cr+₹8.4 L (5.05%)Rejected-AOC NOT SPECIFIED | ₹1.7 Cr+₹8.4 L (5.05%) | L4 | Rejected-AOC Refunded |
| 5 | L5₹1.8 Cr+₹9.4 L (5.63%)Rejected-AOC VPO PANCH JATTAN SONEPAT 131001 | SONEPAT | SONIPAT | HARYANA | 131001 | ₹1.8 Cr+₹9.4 L (5.63%) | L5 | Rejected-AOC Refunded |
Tender Value
₹1.9 Cr
EMD Value
₹3.7 L
Closing Date
25 Apr 2022, 5:00 pmClosed
Executive Engineer
Executive Engineer, PH.Engg. Division Mohindergarh
Beri Prov. FHTC to household and Construction of Independent Water Works at village Beri under PHED M.garh under JJM Coverage E.Cost Rs. 259.55 Lakh. Construction of Independent water works and FHTC under JJM Phase II in village Beri Distt. Mah
2022_HRY_215273_1
SE PHE.Circle NNL No.2361 dt. 01.04.2022
Open Tender
Civil Works
Works
456 days
Mohindergarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹3.7 L
Yes
8 Jun 2022
4 Apr 2022
26 Apr 2022
4 Apr 2022
25 Apr 2022
4 Apr 2022
Amount
Supplying, erection, testing and commissioning or Horizontal motor pumping set or Raw water having head 12.00 m as requirements of discharge in LPM and power capacity in BHP Make: KSEB, CRI, Kirlosker, Crompton Greeve, Lubi) 800 LPM x 5.00 BHP
Provision for domestic electric fitting including wire & accessories complete in all respect for 10 no. point inside pump cahmebr
Providing & fixing flow meter of approved make with electronic display on delivery pipe inside pump chamber comple in all respect. 150 mm
Operation & Maintenance Operation & maintenance for the complete scope of work mentioned in the DNIT (Disinfection material will be supplied by the PHED) as per schedule-IV for a period of 5 Years after 12 Months during Defect liability period of 3 months trial run (Will be charged to the A/mtc estimate)." i) Operation and maintenance during liability period (Operation only)
Operation and maintenance during 1st year after defect liability period
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Bidder Name
Amount
Devinder Kumar Contractor(GSTN-06CEEPK3098C1ZN)
Devender Singh Contractor(GSTN-NA)
M/S Jai Hanuman Builder(GSTN-NA)
SUNIL KUMAR CONTRACTOR(GSTN-NA)
M/S SHREE BALAJI BUILDERS(GSTN-NA)
M/S SHREE BALAJI BUILDERS
Devinder Kumar Contractor
M/S Jai Hanuman Builder
Devender Singh Contractor
Devender Singh Contractor
M/S Jai Hanuman Builder
M/S SHREE BALAJI BUILDERS
SUNIL KUMAR CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .