Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹23.2 LAccepted-Finance | ₹23.2 L | L-1 | Accepted-Finance Lowest Rates after Schedule of Credit Rs. 166020/- |
| 2 | L-2₹23.3 L+₹12,038.80 (0.52%)Rejected-Finance | ₹23.3 L+₹12,038.80 (0.52%) | L-2 | Rejected-Finance High Rates |
| 3 | L-3₹23.8 L+₹60,416.15 (2.60%)Rejected-Finance | ₹23.8 L+₹60,416.15 (2.60%) | L-3 | Rejected-Finance High Rates |
| 4 | L-4₹26.2 L+₹3.0 L (12.9%)Rejected-Finance 22 1755A KANNANKATTU TEMPLE ROAD EDAKOCHI KOCHI 682010 ERNAKULAM KERALA 682010 | ERNAKULAM | KERALA | 682010 | ₹26.2 L+₹3.0 L (12.9%) | L-4 | Rejected-Finance High Rates |
| 5 | L-5₹26.6 L+₹3.4 L (14.4%)Rejected-Finance | ₹26.6 L+₹3.4 L (14.4%) | L-5 | Rejected-Finance High Rates |
| Sl No | Description | Qty | Unit | AGARWAL BUILDERS L5 | Ms Kailash Chandra Babulal L3 | M/S Parikshit Sharma L1 | sanjay traders L4 | Vinayak Trading House L7 | MODI CORPORATION L6 | SAHYOG ELECTRIC L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Attending to no light any type complaints and carrying out electrical break down electric complaints such as faulty cable of defective items like service cables, MCB's, MCCB's, upto DB's, digging work etc. through skilled trademen at any location complete all as specified and directed.
Note :-
(i) Contractor or his representative will report daily to the AGE E/M-III MCTE MHOW to collect the complaints any time round the clock by teliphonically or any sources by official staffnin the various locations of AOR of AGE E/M-III MHOW.
(ii) Each complaint shall be attended/ check on same day and be resolve within 01 Hrs otherwise @ Rs 500/ per complaint to be recovered from quoted rate.
(iii) Multiple job cards or multiple complaints on one job card may be issued at any time based on the complaints available daily. Contractor will ensure sufficient manpower to resolve the issues with in time line given above.
(v) Rates quoted for this item is includes manpower/ labour reqired for collection for complaints from office, reporting labour/ engineer on site, reporting feedback to the authority and transportation reqired for the same. Cost of T&P reqired for execution of work shall also deemed to be included in quoted rates.
(iv) Contractor or his representative will submit daily report on the status of complaint resolved and pending with reason.
(vi) Cost of miner parts/ material i.e screw, nails, washers, saddle, fuse, minor requirement of 2/3 core wire, insulation tap, different type of Lugs etc required to making the article serviceable/ working at site shall deemed to be included in quoted rates. | 50 | Each Job | 600 ₹30,000 | 200 ₹10,000 | 150 ₹7,500 | 200 ₹10,000 | 500 ₹25,000 | 585 ₹29,250 | 100 ₹5,000 Lowest |
| 2.00Disconnecting & dismentling of damaged/unsv cable any type/ make and Supply & laying (in repair) cable XLPE Insulated screened PVC bedded, galvanized steel strip or wire armored, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor using lugs bothe end of cable& wrapping pvc tape over XLPE insulation cable and testing complete all as specified and directed for following size:- (Note:- Excavation & earth work, sand cushioning, bricks protection & GI pipe where required shall be measured & paid seperately) | ||||||||||
| 3.00 | (a) 25 Sqmm 3.5 core, complete all as specified and directed. | 250 | RM | 330 ₹82,500 | 230 ₹57,500 | 260 ₹65,000 | 220 ₹55,000 Lowest | 310 ₹77,500 | 260 ₹65,000 | 270 ₹67,500 |
| 4.00 | (b) 35 Sqmm 3.5 core, complete all as specified and directed. | 400 | RM | 398 ₹1,59,200 | 290 ₹1,16,000 | 320 ₹1,28,000 | 280 ₹1,12,000 Lowest | 390 ₹1,56,000 | 300 ₹1,20,000 | 310 ₹1,24,000 |
| 5.00 | (c) 50 Sqmm 3.5 core, complete all as specified and directed. | 310 | RM | 520 ₹1,61,200 | 390 ₹1,20,900 | 410 ₹1,27,100 | 370 ₹1,14,700 Lowest | 515 ₹1,59,650 | 388 ₹1,20,280 | 415 ₹1,28,650 |
| 6.00 | (d) 70 Sqmm 3.5 core, complete all as specified and directed. | 400 | RM | 720 ₹2,88,000 | 550 ₹2,20,000 | 490 ₹1,96,000 Lowest | 510 ₹2,04,000 | 690 ₹2,76,000 | 513 ₹2,05,200 | 570 ₹2,28,000 |
| 7.00 | (e) 95 Sqmm 3.5 core, complete all as specified and directed. | 500 | RM | 798 ₹3,99,000 | 670 ₹3,35,000 | 680 ₹3,40,000 | 580 ₹2,90,000 Lowest | 880 ₹4,40,000 | 600 ₹3,00,000 | 725 ₹3,62,500 |
| 8.00 | (f) 120 Sqmm 3.5 core, complete all as specified and directed. | 315 | RM | 930 ₹2,92,950 | 770 ₹2,42,550 | 850 ₹2,67,750 | 750 ₹2,36,250 | 1,000 ₹3,15,000 | 714 ₹2,24,910 Lowest | 990 ₹3,11,850 |
| 9.00 | Excavation in trenches in soft/ loose soil not exceeding 1.5 M wide and not exceeding 1.5 Mtr deep and getting out including filling bottom surface to required level or slope for laying of pipes/ cablescomplete all as specified and directed. | 528.53 | Cum | 110 ₹58,138.3 | 85 ₹44,925.05 | 120 ₹63,423.6 | 80 ₹42,282.4 Lowest | 125 ₹66,066.25 | 300 ₹1,58,559 | 90 ₹47,567.7 |
| 10.00 | Returning filling including spreading, leveling, watering and well ramming in layers not exceeding 25 cm in soft soil complete all as specified and directed. | 294.86 | Cum | 35 ₹10,320.1 | 30 ₹8,845.8 Lowest | 40 ₹11,794.4 | 80 ₹23,588.8 | 30 ₹8,845.8 Lowest | 250 ₹73,715 | 30 ₹8,845.8 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
6 Jul 2026, 6:00 pmClosed
Garrison Engineer (MCTE)
GE (MCTE) Mhow (MP) 453441
REPAIR MAINT OF PANEL, EARTHING, LA AND LT CABLES, PANELS PAINTING AT VARIOUS LOCATIONS UNDER GE (MCTE) MHOW
2026_MES_769984_1
GE(MCTE)/MHOW/32(T) OF 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE (MCTE) Mhow
As per Tender Document
10 documents required · 10 mandatory
₹500
GE (MCTE) Mhow
₹60,000
Yes
11 Sept 2026
5 Jun 2026
8 Jul 2026
5 Jun 2026
6 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Attending to no light any type complaints and carrying out electrical break down electric complaints such as faulty cable of defective items like service cables, MCB's, MCCB's, upto DB's, digging work etc. through skilled trademen at any location complete all as specified and directed.
Note :-
(i) Contractor or his representative will report daily to the AGE E/M-III MCTE MHOW to collect the complaints any time round the clock by teliphonically or any sources by official staffnin the various locations of AOR of AGE E/M-III MHOW.
(ii) Each complaint shall be attended/ check on same day and be resolve within 01 Hrs otherwise @ Rs 500/ per complaint to be recovered from quoted rate.
(iii) Multiple job cards or multiple complaints on one job card may be issued at any time based on the complaints available daily. Contractor will ensure sufficient manpower to resolve the issues with in time line given above.
(v) Rates quoted for this item is includes manpower/ labour reqired for collection for complaints from office, reporting labour/ engineer on site, reporting feedback to the authority and transportation reqired for the same. Cost of T&P reqired for execution of work shall also deemed to be included in quoted rates.
(iv) Contractor or his representative will submit daily report on the status of complaint resolved and pending with reason.
(vi) Cost of miner parts/ material i.e screw, nails, washers, saddle, fuse, minor requirement of 2/3 core wire, insulation tap, different type of Lugs etc required to making the article serviceable/ working at site shall deemed to be included in quoted rates. | 50 | Each Job | 100 | ₹5,000 |
| 2 | Disconnecting & dismentling of damaged/unsv cable any type/ make and Supply & laying (in repair) cable XLPE Insulated screened PVC bedded, galvanized steel strip or wire armored, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor using lugs bothe end of cable& wrapping pvc tape over XLPE insulation cable and testing complete all as specified and directed for following size:-
(Note:- Excavation & earth work, sand cushioning, bricks protection & GI pipe where required shall be measured & paid seperately) | - | - | - | - |
| 3 | (a) 25 Sqmm 3.5 core, complete all as specified and directed. | 250 | RM | 102 | ₹25,500 |
| 4 | (b) 35 Sqmm 3.5 core, complete all as specified and directed. | 400 | RM | 103 | ₹41,200 |
| 5 | (c) 50 Sqmm 3.5 core, complete all as specified and directed. | 310 | RM | 104 | ₹32,240 |
| 6 | (d) 70 Sqmm 3.5 core, complete all as specified and directed. | 400 | RM | 105 | ₹42,000 |
| 7 | (e) 95 Sqmm 3.5 core, complete all as specified and directed. | 500 | RM | 106 | ₹53,000 |
| 8 | (f) 120 Sqmm 3.5 core, complete all as specified and directed. | 315 | RM | 107 | ₹33,705 |
| 9 | Excavation in trenches in soft/ loose soil not exceeding 1.5 M wide and not exceeding 1.5 Mtr deep and getting out including filling bottom surface to required level or slope for laying of pipes/ cablescomplete all as specified and directed. | 528.53 | Cum | 108 | ₹57,081.24 |
| 10 | Returning filling including spreading, leveling, watering and well ramming in layers not exceeding 25 cm in soft soil complete all as specified and directed. | 294.86 | Cum | 109 | ₹32,139.74 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
PS-32T.pdf
Tender Documents • 0.31 MB
Make32T.pdf
Tender Documents • 0.23 MB
TD32T.pdf
Tender Documents • 0.77 MB
Undertaking32T.pdf
Additional Documents • 0.10 MB
BOQ_862321.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .