Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC COLABA MUMBAI | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹27.0 L+₹1.4 L (5.32%)Rejected-Finance | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹28.0 L+₹2.3 L (9.12%)Rejected-Finance COLABA MUMBAI | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹28.5 L+₹2.9 L (11.2%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹29.0 L+₹3.4 L (13.1%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹50,400
Closing Date
7 Oct 2022, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
REPAIR ROUTINE MAINT OF ELECTRIC OPERATED LIFTS MONARCH MAKE AT SAILORS BLOCK NO MESS AND DEFICIENT SAILORS BLOCK AT INHS ASVINI INCLUDING MANNING AND OPERATION UNDER AGE I ASVINI COLABA MUMBAI
2022_MES_550201_1
8012/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
330 days
AGE (I) Asvini
Class D
8 documents required · 8 mandatory
₹500
Yes
AGE (I) Asvini
₹50,400
Yes
20 Oct 2022
6 Sept 2022
10 Oct 2022
6 Sept 2022
7 Oct 2022
20 Sept 2022
6 Sept 2022 - 17 Sept 2022
Amount
Repair/maintenacne of lifts including carrying out daily check and periodical services of fully automatic electrical lift operated passenger lift (Monarch) Make 08 passenger (544 Kg capacity) for G+6 upper floor i.e 7 floors) with power operated door, simplex collective control system with replacement of unservicable damaged parts such as bearings, bushes, all type of guide shoes,headers, hangers, door ropes,door cards,car door sills, landing door sills,door locks,control cards, and its contacts , hall push buttons and its spares, connector/links, welding of crack/broken and MS parts, Landing operating panel of any size and capacity, repairs/maint of u/s damaged door safety edge and sensor mechanical safety lock, megnatic lock or contact, car position indicator,and all connected accessories, necessary wiring of hall push button assembly, repair/maintenance of broken COP/LOP buttons and display, including cover, Fire alarm, firemen button glass, intercom alarm/hooters, Shaft, light/switches, complete with illuminated push button and direction indicator with LED, display with LPTC/LPC card of stainless steel inclusive of harmness wiring for laminating of push button of each floors and cutting wall making good disturbed surface with masonry work to make with existing surface & cable as per requirement for safe operation of lifts, fixing of loose rail bracket with necessary masonry work , cabin, minor repair of cabin light of minor repair of cabin fan ensure safe and smooth functioning of lift and complete maint of car top, binding of loose wire at control panel and rust painting at car top and door and allied parts, two coats of painting of Gear motor, all MS channels and Controls panels completely during dewatering of lifts wells in case of any emergency arise, rewinding of motor for lifts at Deficient Sailor block (( Total - 02 Nos as directed by Engr-in-Charge. Note :- Cost of Spare parts/material, man power required for above mentioned maintenance is deemed to be included in quoted rate No additional cost of spares is admissible for the above maintenance.
All as per item No 01 above but 08 Passengers (544 Kg lift fort Sailor Block Lift 1 & 2 serving G+7 (i.e 08 floor) No of lift 02 Nos
All as per item No 01 above but 08 Passengers (544 Kg lift for NO Mess Lift serving G+8 (i.e 09 floor) No of lift 01 No
Note :- (i) The Contractor has to carry out the AMC of the lifts through OEM or authorized rep of OEM only (ii) The AMC should cover any/all parts of lifts if its function found defective the same should be repaired or replaced by the OEM as per the timeline covered under norms. (iii)Lift mechanic (skilled) duly trained in 3 No's for all the lift mentioned above in General shift. (vi) Lift mechanic should also have practical experience and shall posses thorough knowledge to rescue the passenger in case of emergency like anybody getting trapped in lifts with the help of lift operator. (v)Lift mechanic having dipolma qualification with at least 02 (Two) years practical experience shall possess thorough knowledge of all parts of lifts (vi) Passes will be processed after verification of diploma certificate. police verfication experience certificate only. pass shall not be granted without submission of documents (vii) Contractor shall submit ID proof, police verification, Residential proof, Bank A/C details to department and obtain approval of Engrr-in-Charge before employing a person as Lift mechanic. (viii) Payment to lift mechanic shall be done through aadhar linked bank account throughI MPS/RTGS/NEFT only and wages which shall not be less than minimum fare wages as perAct in vouge The contractor shall submit payment proof to Engineer-in- Charge before claiming any payment. After entire satisfaction of Engineer-in-Charge the payment action shallbe processed further.
(ix) Each lift should be inspected by Govt authorised lift inspector and obtain certificate in the effect be submitted to AGE(I) Asvini as per Maharasatra Govt lift Esclator Act. (x) Duty roaster for lift mechnaic including reliver for every month should be submitted and get approval from Engineer-in-Charge. (xi) Rewinding of motor if required will be done by the contractor and no extra cost will be given by the department. (xii) The detailed lift mechanics of the firm shall report to the JE concerned at the Lift complaint cell for receving the complaints of round the clock daily including sunday and holiday (xiii) The detailed lift mechanics shall sign (Their shift wise) in the attendance register kept with lift cell. (xiv) cost of minor spare parts/ routine material required for above mentioned maintenance is deemed to be included in the quoted rate except items mentioned her-in-after. NO addition cost of spares is admissible for the above maintenance. Decision of the Accepting officer shall be final & binding minor spares/ routine material (xv) Monthly schedule for proper maintence of lift and necessary documentation including the period shall be as directed by Engineer-in-Charge. (xvi) All minor spare parts and parts required for repair / replacement for maintenance & erection of lifts to be replaced during AMC at no extra payment. (xvii) Bidders are to submit licence from Govt. of Maharashtra for maintenance & erection of lifts issued by Chief electrical inspector.
Taking out unserviceable cabin fan from car cable and supply and fix new cabin fan non -oscillating type axial flow,single speed 300 mm sweep , 240 volts ISI mark with aluminium powder coated gril complete all as specified by Engineer in charge
Taking out unserviceable main steel wire rope after disconnecting from countter weight pulley and car cabin,supply & fix mainsteel wire rope size 13mm dia, 19 constructioncabin in including necessary connection with counter weight pulley and car cabin with clamps, nuts, bolts and washer etc complete suitable for 8 PS lifts at INHS Asvini all as specified directed byt Engineer in charge
Repalcement of unserviceable Governor rope after disconnecting from counter weight, pulley and supply and fix New Governor rope 08 mm dia necessary connection with counter weight, pulley with nut, bolls and washers complete all as specified and directed by Engr-in-charge in lift at INHS Asvini.
Dismanting of complete Governer assembly top and bottom & supply and fixing of Over speed Governor complete tripping arrangement mechanism 300mm dia pulley with ball bearing complete and suitable for 08mm governor rope suitable for passenger / goods lift having different speed as specified and directed by Engr-in- Charge
Dismantling and taking out U/S & supply & Fix new hall push button assembly complete with stainless face plate to match with the existing and connecting up with existing control/electric system including of wall and making good disturbed surface of masonry work to match with the existing surface complete all as specified by Engineer in charge
Dismantling & taking out U/S and Supply and fix new COP assembly complete with illuminated push button floor position, alarm, non stop, door close, door open, cabin fan. Cabin light, stop attendant out key, etc in and including direction indicator of 7 segment display with CPL card and stainless steel face plate duly connection with existing control and electric system complete all as specified and as directed by Engineer-in-Charge.
Disconnecting and taking out defective shaft wiring providing new shaft wiring hoist way up to lower limit switch with PVC insulated 18 core falt /round type standard copper conductor cable size 1.0 Sqmm 1100 volt grade with ISI marked and 0.75 sqmm single core for eathing drawing through in and including galvanized sheet metal (24 SWG) trunking upto ground floor in hoist way for control of all floor hall push button assembly, limit switch, fireman switch etc., complete all as specified and as directed by Engineer-in-Charge.
Manning and operation of electrically operated lifts of any make type and capacity to serve any floors daily i.e (One shift of 08 hours per day ) including Sunday and holiday including taking care of lift from any pilferange, theft or damage etc. in sailor block at INHS Asvini complete all as specified and as directed by Engineer-in-Charge.
Manning and operation of electrically operated lifts of any make type and capacity to any No's of floor daily i.e (One shift of 08 hours per day) including sundays and holidays including taking care of lift from any pilferage, theft or damage etc in Deficient Sailor block at INHS Asvini Building complete all as specified and as directed by Engineer-in-Charge.
Manning and operation of electrically operated lifts of any make type and capacity to any No's of floor daily i.e (One shift of 08 hours per day) including sundays and holidays including taking care of lift from any pilferage, theft or damage etc in NO Mess at INHS Asvini Building complete all as specified and as directed by Engineer-in-Charge.
Note :- (i) Passes will be processed only after verification of antecedence of deployed employees and submission of verified experience certificate, Pass shall not be granted without submission of qualification proof & experience certificate for lift operator. In case of OEM, the qualification mentioned in note is not applicable which shall be verified by Engineer-in-Charge before issue of passes (ii) Contractor shall submit ID proof, Residential proof, Bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as Operator (iii) Payment to employees shall be done by crossed cheque through Aadhaar linked bank account only and it shall not be less than minimum fair wages as per act in vogue. The contractor shall submit proof to Engineer-in-Charge before claiming any payment. (iv) Lift operator (semi skilled) shall be available with lift cell as per the shift timings specified in the tender and he will report to JE E/M in-Charge or Lift Cell in-Charge. In case of emergency he will function according to their direction. If he is found absent or move without intimating to in-Charge of Lift Cell or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs 1500/- per shift shall be affected.(v) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (v) In case of malfunctioning if any noticed, lift operator shall intimate to the lift cell. The individual employed as lift operator should has minimum qualification of ITI course equivalent from state or central board
(vi) Contractor shall submit the labour licenece VAT as applicable as per latest laws/acts & Copy of GST Regn registered number issued by concerned authority. (vii) Insurance coverage, compensation if any applicable or necessitated due to mis operation of lift shall be the responsibility of contractor. The quantum of compensation shall be assessed based on the BOO composing of Lift Inspector of Maharashtra State, representatives of both agencies carrying out M&O works and routine maintenance work of lift and members from department. (viii) Contractor has to submit proof of payment of EPF subscription made by him as applicable as per latest laws/acts alongwith RAR failing which RAR will not be progressed for payment. (ix) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (x) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority. If the quoted amount is less than the estimated cost of work mentioned in BOQ item No 09 to 11i.e Rs 11,06,325.00, the lowest bidder will have to deposit FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (Cover No 2). The deposited amount shall be the difference between estimated cost mentioned in BOQ item No 9.00 to 11 (i.e) Rs 11,06,325 and amount quoted by lowest bidder. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to withhold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withhold shall be final and binding. The withhold amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall sumbit 03 Nos of BGBs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be 04 months, 08 month & 12 months respectively for the purpose of encashment/ release as the case may be. (xi) The rates quoted shall be inclusive of suitable reliver wherever sundays & holidays are mentioned for working (xii) in case of any necessity for rescue operation or in emergency situations, lift operator shall be capable of rescue the passenger and reacting to the situation(in emergency situations) Rescue operator engaged for rescue operation shall immediate attend the complaint within 30 minutes failing which penalty at Rs 500/- per hour or part thereof shall be levied.
Shree Elevator Engineering Co.
Veer High Tech Solution
Escon Elevators Pvt Ltd
shakti engineering and electrical works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .