| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.5 LAccepted-AOC 201 BARI CO OPERATIVE COLONY SECTOR 12 TENTULYA BOKARO JHARKHAND 827012 | BOKARO | JHARKHAND | 827012 | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.2 Cr+₹3.9 L (3.40%)Rejected-Finance 612 DIWAN ESTATE AMBEDKAR GALI HARSH VIHAR EAST DELHI DELHI 110093 | NORTH EAST DELHI | DELHI | 110093 | L2 | Rejected-Finance Adding BoQ1 and BoQ2 | |
| 3 | L3₹1.5 Cr+₹31.8 L (27.7%)Rejected-Finance PLOT NO 462 KULDEEP SONI PLOT NO 462 PACE CITY II SECTOR 37 GURUGRAM 122001 PACE CITY II SECTOR 37 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L3 | Rejected-Finance Adding BoQ1 and BoQ2 | |
| 4 | Rejected-Technical 610 PP TOWERS C 1 2 3 NETAJI SUBHASH PLACE PITAMPURA NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | - | Rejected-Technical Technocommercially Disqualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Technocommercially Disqualified |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
21 Jul 2022, 3:00 pmClosed
MANAGER CNM
HURL ADMIN BUILDING URVARAK NAGAR BEGUSARAI BARAUNI BIHAR PIN 851115
ANNUAL RATE CONTRACT (ARC) FOR OPERATION AND MAINTENANCE OF HVAC, PRESSURIZATION SYSTEM AND PACKAGE AIR CONDITIONERS AT HURL BARAUNI
2022_HURL_694364_2
HURL/BR/CC/22-23/109
Open Tender
Electrical Works
Works
365 days
HURL BARAUNI
As per NIT
6 documents required · 6 mandatory
₹0
₹1.2 L
Yes
22 Mar 2023
8 Jul 2022
22 Jul 2022
8 Jul 2022
21 Jul 2022
8 Jul 2022
8 Jul 2022 - 14 Jul 2022
Amount
Part A: Daily Operation(Upkeeping, monitoring ,changeover etc.) & Maintenance (Routine,preventive,Breakdown etc.) of HVAC,Package AC and Air Pressurisation systems
Package AC system in EDG Room 17 Ton
Package AC system in Switchyard Control Room 22 Ton
Complete HVAC system in Central control room 130 Ton
Complete HVAC system in CPP control Room 101 Ton
Complete HVAC system in Urea S/S 22 Ton
Complete HVAC system in Lab Building 170 Ton
Complete HVAC system in Cooling Tower SS 26 Ton
Complete HVAC system in Ammonia SS 110 Ton
Complete HVAC system in Ammonia Storage SS 26 Ton
Complete HVAC system in Ammonia Storage Control Room 26 Ton
Complete HVAC system in Analyser shelters 34 Ton
Complete HVAC system in Bagging plant Control Room 34 Ton
Complete Air Pressurisation System in CPP S/S 24000 CFM
Complete Air Pressurisation System in Urea S/S 23000 CFM
Complete Air Pressurisation System in Cooling Tower S/S 52000 CFM
Complete Air Pressurisation System in Ammonia S/S 59000 CFM
Complete Air Pressurisation System in Ammonia Storage S/S 32000 CFM
Complete Air Pressurisation System in Utility S/S 61900 CFM
Complete Air Pressurisation System in Bagging Plant S/S 73700 CFM
Complete Air Pressurisation System in UPH MCC room 33300 CFM
Part B: Supply of Refrigerant Gas for top-up and re commissioning
R - 134a in returnable cylinder
R - 407c in returnable cylinder
R- 410a in returnable cylinder
KUMAR AIR CONDITIONING ENGINEERS
Anemo Projects Pvt Ltd
KUMAR AIR CONDITIONING ENGINEERS
Anemo Projects Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .