| # | Company | Status |
|---|---|---|
| 1 | G S NAIDU CONSTRUCTIONS Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹38.1 L
EMD Value
₹39,000
Closing Date
3 Jun 2020, 3:00 pmClosed
The Project Director
The Project Director DRDA,Vellore
Renovation of 5 no of Ponds Ooranies,Kulam Kuttai in Jolarpet Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package no-52
2020_RDTN_158521_1
A9/3844/2020
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹39,000
6 Jun 2020
20 Feb 2020
3 Jun 2020
20 Feb 2020
3 Jun 2020
20 Feb 2020
Amount
JOLARPET BLOCK P-52 5Nos. Works
1.Improvements to Mamanikuttai in Survey No.8 in Chinnakammiyampattu panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Earth work deploying earth moving machinery for desilting channel and forming bunds either side and depositing earth on banks including jungle clearance etc complete
Construction of Silt trap
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Provision for Name Board
2.Improvements to Pullan Eri kuttai in Survey No.333 in Kethandhapatti panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Earth work deploying earth moving machinery for desilting channel and forming bunds either side and depositing earth on banks including jungle clearance etc complete
Construction of bathing Ghat
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Brick Work in Cement Morter 1:5 including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plastering with cement morter 1:5 mix in 12mm tk including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Construction of Baby pond
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Provision for Name Board
3.Improvements to Nayyankan kuttai in Survey No.16 in Koothandhakuppam panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Earth work deploying earth moving machinery for desilting channel and forming bunds either side and depositing earth on banks including jungle clearance etc complete.
Construction of bathing Ghat
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Brick Work in Cement Morter 1:5 including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plastering with cement morter 1:5 mix in 12mm tk including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Construction of Baby pond
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Construction of Silt trap
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Provision for Name Board
4.Improvements to Paraman vattam kuttai in Survey No.79/10 in Mandalawadi panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Earth work deploying earth moving machinery for desilting channel and forming bunds either side and depositing earth on banks including jungle clearance etc complete
Construction of Baby pond
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Provision for Name Board
5.Improvements to Kottaniyan kuttai in Survey No.121 in Ponneri panchayat
Clearing the juliflora jungle without uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidential charges etc. Complete
Earth work in all soils except hard rock requiring blasting and conveying for formattion of bunds with leads 0 to 100m deploying earth moving machinery and tippers including benching ,formation of bunds,breaking clods,sectioning etc complete.
Earth work deploying earth moving machinery for desilting channel and forming bunds either side and depositing earth on banks including jungle clearance etc complete.
Construction of bathing Ghat
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Brick Work in Cement Morter 1:5 including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Plastering with cement morter 1:5 mix in 12mm tk including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Construction of Baby pond
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Construction of Silt trap
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over silver oak (c-word) joint of size 10 cm x 6.50 cm dia spaced about cnter to center and supported by casuarinas propels of 10 cm to 13 cm dia spaced at 75 cm center to center etc., complete complying with std. specification and as directed for the following items
Plain Cement Concret 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
Provision for Name Board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
G S NAIDU CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .