Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-Finance ALAGHU BHAVANAM 83 YATHAVAR STREET TUTICORIN 02 | L1 | Accepted-Finance BOQ Accepted | |
| 2 | L2₹10.5 L+₹1.2 L (12.4%)Accepted-Finance | L2 | Accepted-Finance BOQ Accepted |
Tender Value
₹11.2 L
EMD Value
₹11,100
Closing Date
16 Mar 2023, 2:00 pmClosed
Superintending Engineer/Mechanical-I
O/o SE./MI/TTPS
ECHP-II- Attending Electrical maintenance of equipments in Conveyor 65 to 71 and Link Conveyor
2023_EB_291794_1
SE/MI/TTPS/61/2023-2204
Open Tender
Maintenance Works
Works
11100 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,100
22 Mar 2023
1 Mar 2023
17 Mar 2023
1 Mar 2023
16 Mar 2023
1 Mar 2023
PREV ELEC MTNCE IN CONVRS 65 TO 71 ETC and link conveyor
HT Breakers :Charges for removing of terminal cover, rack out the HT Breaker from the panel releasing from its position removal of carbon in all electrical components moving/ fixed contact protection CTs with molykote tightness checking of all bolts and nuts internal wiring with components checking the SF6 gas level and gas filling up and checking of spring charge motor condition. After completion of work Breaker racked inside the panel and put into service position and checking the healthiness of the Breaker.
LT Modules above 10KW: Charges for racking out the LT modules from the panel releasing from its position removal of dust by blower- removing the contacts cover-removal of carbon in all electrical components moving/fixed contacts metering CTs with molykote, tightness checking of bolts and nuts internal wiring with components reassembling the LT modules to the panel and put into service position and checking the trial run of the modules along with the conveyors.
LT modules below 10 KW:Charges for removal of terminal cover and rackout the LT modules from the panel. Releasing from its position removal of dust by blower removing the contactor cover remove the carbon dust overall electrical components moving/ fixed contacts metering CTs with molykote tightness checking of all bolts & nuts internal tightness checking of wiring with components reassembling LT modules after completion of work racking inside the LT modules along with conveyors including consumables.
LT Breakers: Charges for rackout the LT Breakers from the panel releasing from its position removal of dust from its by using blower removal of carbon in all electrical components moving/ fixed contacts, protection CTs with molykote, tightness checking of all bolts and nuts internal wiring with components reassembling the LT Breakers to the panel and put into service position and checking the healthiness of the Breaker.
Power Transformers:Charges for removal of dust from the outer surface of the transformer by using blower cleaning the earth resistance box and bucholz relay oil level gauge glasses checking of oil level and winding temperature indicator in transformers 1600KVA- 2 Nos., 500 KVA-1 No.
" " LT modules size 0 modules switch fuse type.
Charges for removing of terminal cleaning of LT motor terminal box by blower, tightness checking of all three phase end termination, checking of bearings and greasing, after completion of work meggering the motor winding check the motor trail operation with load
PARVATHI ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .