Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.8 LAccepted-AOC RAKH RAJ PURA PARMANDAL MORB BIRPUR BARI BRAHMNA SAMBA JAMMU AND KASHMIR 181133 | BARI BRAHMNA | SAMBA | JAMMU AND KASHMIR | 181133 | ₹87.8 L | L1 | Accepted-AOC LOWEST QUOTED BIDDER |
| 2 | L2₹87.9 LRejected-Finance | ₹87.9 L | L2 | Rejected-Finance BEING LOWEST QUOTED BIDDER |
| 3 | L3₹88.2 LRejected-Finance | ₹88.2 L | L3 | Rejected-Finance LOWER QUOTED BIDDER |
| 4 | L4₹88.3 LRejected-Finance 128 CANTT ROAD GARHA JALANDHAR PUNJAB 144001 | JALANDHAR | JALANDHAR | PUNJAB | 144001 | ₹88.3 L | L4 | Rejected-Finance HIGHER QUOTED BIDDER |
| Sl No | Description | Qty | Unit | D S constructions L4 | shree balaji construction company L2 | Spire Constructions L1 | MAK CONSULTANTS AND ENGINEERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | 1. The work consists of Supply and construction of Underground Communication Center of size 15.90 mtr x 5.90 mtr x 3.00mtr (External Dim) with RCC framed construction using M-25 concrete, infill walls / partition walls of 300mm wide constructed using PCC blocks conforming to IS code 2185-(Pt- 2):1983 (Reaffirmed 2020). Necessary excavation will be carried out all as directed by Accepting Officer.Joinery, uPVC doors, windows & ventilators, Staircase, Toilet facilities, Drainage, etc as per Line drg attached for ref.
Note: - All materials make list attached in RFP for ref. Vendor Should provide raw material assurance certificate of all items.
L1 vendor to submit 3D modeling in hard copy and soft copy to Accepting officer for approval. | 1 | Nos | 88,27,000 ₹88.3 L | 87,88,000 ₹87.9 L | 87,80,000 ₹87.8 L | 88,15,000 ₹88.2 L |
Tender Value
Refer Docs
EMD Value
₹4.4 L
Closing Date
9 Apr 2026, 6:00 pmClosed
Commanding Officer
18 Engineer Regiment
UG COMN CENTRE
2026_ARMY_756881_1
NYA/2026-27
Open Tender
Civil Works
120 days
Khumbathang
As per tender documents
3 documents required · 3 mandatory
₹1,000
Commanding Officer 18 Engr Regt
₹4.4 L
21 May 2026
19 Mar 2026
11 Apr 2026
19 Mar 2026
9 Apr 2026
2 Apr 2026
19 Mar 2026 - 26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11. The work consists of Supply and construction of Underground Communication Center of size 15.90 mtr x 5.90 mtr x 3.00mtr (External Dim) with RCC framed construction using M-25 concrete, infill walls / partition walls of 300mm wide constructed using PCC blocks conforming to IS code 2185-(Pt- 2):1983 (Reaffirmed 2020). Necessary excavation will be carried out all as directed by Accepting Officer.Joinery, uPVC doors, windows & ventilators, Staircase, Toilet facilities, Drainage, etc as per Line drg attached for ref. Note: - All materials make list attached in RFP for ref. Vendor Should provide raw material assurance certificate of all items. L1 vendor to submit 3D modeling in hard copy and soft copy to Accepting officer for approval. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_847815.xls
BOQ • 0.26 MB
RFP.pdf
Tender Documents • 1.95 MB
Download all tender documents and submit your bid