Loading…
Loading…
Tender Value
₹69,300
EMD Value
₹3,465
Closing Date
30 Jun 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
EXECUTIVE ENGINEER REW BUDGAM
Construction of Footbridge from main road to house of gh Hassan wani and others at Repora Chadoora
2026_RDPR_313144_10
NIT_13 REW BUDGAM OF 2026-27
Open Tender
Civil Works
Percentage
30 days
CHADOORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹3,465
23 Jun 2026
23 Jun 2026
1 Jul 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 M² on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | - | CUM | 479.3 | - |
| 0_) | Providing and laying of dry stone solling/ plum completely H/P including carriage by M/T avg lead of 10kms including headload 50 mts | - | Cum | 1,265 | - |
| 0_) | P/L in position of Reinforcement cement concrete (1:1.5:3 ) stone aggregate 20mm nominal size aggregate excluding the cost of centring and shuttering all work upto plinth level | 0.13 | cum | 7,788.4 | ₹1,012.49 |
| 0_) | Centering and shuttering including strutting , propping etc. and removal of form work for FOUNDATION | 1.73 | sqm | 286.36 | ₹495.4 |
| 0_) | P/L in position of Reinforcement cement concrete (1:2:4 ) stone aggregate 20mm nominal size aggregate excluding the cost of centring and shuttering all work upto plinth level | 1.53 | cum | 8,422.45 | ₹12,886.35 |
| 0_) | P/L in position of Reinforcement cement concrete (1:1.5:3 ) stone aggregate 20mm nominal size aggregate excluding the cost of centring and shuttering (slab wheel guard) | 1.69 | cum | 9,821.85 | ₹16,598.93 |
| 0_) | Reinforcement for RCC works incld. straightening bending cutting placing in position and binding all complete (TMT Bars) | 166 | Kg | 115.35 | ₹19,148.1 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 1.73 | sqm | 286.35 | ₹495.39 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form work for: abuts | 13.66 | sqm | 628.95 | ₹8,591.46 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form work for: slab | 6.53 | sqm | 718.2 | ₹4,689.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_1013378.xls
BOQ • 0.26 MB
NIT13EXTENTION.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .