Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr | L1 | Accepted-AOC AGREEMENT DONE AS PER ATTACHED CONCERNED DIVISION LETTER ATTACHED |
| 2 | L2₹2.8 Cr+₹35.6 L (14.5%)Rejected-Finance GRAM PURSOTTAMPUR POST JANAKPUR DISTT PANNA M P | PANNA | PANNA | MADHYA PRADESH | ₹2.8 Cr+₹35.6 L (14.5%) | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹2.9 Cr+₹41.0 L (16.7%)Rejected-Finance | ₹2.9 Cr+₹41.0 L (16.7%) | L3 | Rejected-Finance BEING L3 |
| 4 | L4₹3.0 Cr+₹54.5 L (22.1%)Rejected-Finance | ₹3.0 Cr+₹54.5 L (22.1%) | L4 | Rejected-Finance BEING L4 |
| 5 | L5₹3.0 Cr+₹55.3 L (22.5%)Rejected-Finance 01 DHANAK MOHALLA PANSEIMAL DIST BADWANI | PANSEIMAL | BADWANI | MADHYA PRADESH | ₹3.0 Cr+₹55.3 L (22.5%) | L5 | Rejected-Finance BEING L5 |
Tender Value
₹3.7 Cr
EMD Value
₹3.7 L
Closing Date
26 Aug 2022, 5:30 pmClosed
EE WR Division, Chhatarpur
EE WR Division, Chhatarpur (M.P)
On-Turnkey Basis Construction of Earthen dam , Waste weir, approach, sluice and spill channel, Head sluice and Head sluice channel of Birampura Tank Project (Without Canal), as per detailed scope of work but not limited to that
2022_WRD_212693_1
913/2022-23/et/enc/Birampura Dt. 27-07-22
Open Tender
Civil Works - Others
Turn-key
548 days
Chhatarpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,000
₹3.7 L
6 Jan 2023
9 Aug 2022
29 Aug 2022
10 Aug 2022
26 Aug 2022
10 Aug 2022
Amount
On-Turnkey Basis:-Construction of Earthen dam , Waste weir, approach, sluice and spill channel, Head sluice and Head sluice channel of Birampura Tank Project (Without Canal), Block- Buxwaha, Distt.-Chhatarpur (M.P.) with defect liability period of 24 months and operation & maintenance period 24 months as per detailed scope of work but not limited to that.
On-Turnkey Basis:-Construction of Earthen dam , Waste weir, approach, sluice and spill channel, Head sluice and Head sluice channel of Birampura Tank Project (Without Canal), Block- Buxwaha, Distt.-Chhatarpur (M.P.) with defect liability period of 24 months and operation & maintenance period 24 months as per detailed scope of work but not limited to that.
RAM BABU SINGH
ANANTA CONSTRUCTION COMPANY
GLOBAL CONSTRUCTIONS
YADAV CONSTRUCTION
PANKAJ CONSTRUCTION COMPANY
DAYA RAM CONSTRUCTION
MS GAURI CONSTRUCTION
SHRI BANKEY BIHARI CONSTRUCTION
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .