| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC GRAM LOHATI SARIYA RUDAUTI AYODHYA | ₹12.5 L Quoted ₹10.6 L | L1 | Accepted-AOC AoC |
| 2 | L2₹10.7 L+₹11,624.57 (1.10%)Rejected-Finance | ₹10.7 L+₹11,624.57 (1.10%) | L2 | Rejected-Finance Rejected |
Tender Value
₹10.6 L
EMD Value
₹21,140
Closing Date
8 May 2026, 12:00 pmClosed
EE RED Ayodhya, Vikas Bhawan, Ayodhya
EE RED Ayodhya, Vikas Bhawan, Ayodhya
Under District Ayodhya, Construction of CC Road on the unpaved road from near Jitendra Yadav house in Patranga-Usri to near Darshan Rawat house, Lot No 8
2026_REDUP_1143494_8
5669/EE RED Ayodhya/26-27 Dt 28/03/2026
Open Tender
Civil Works
Percentage
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹21,140
4 Aug 2026
29 Apr 2026
8 May 2026
29 Apr 2026
8 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Earth work in cutting or in embankment in ordinary soil,excation to be in the form of regular pits not exceeding 0.5m in depth etc. Asper S.I.No.-253. CARTAGE 3 KM | 218.98 | CuM | 276.45 | ₹60,537.02 |
| - | Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. | 26.98 | CuM | 363.99 | ₹9,820.45 |
| - | Concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 12;6;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work.As per SI No-273 | 9.22 | CuM | 3,752.5 | ₹34,598.05 |
| - | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering as per drawing and technical specification clauses 600, in 1:4 cement : coarse sand mortar. | 29.67 | CuM | 6,335.08 | ₹1,87,961.82 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density complete. as per Technical Specification Clause 401 | 68.26 | CuM | 3,488.25 | ₹2,38,107.95 |
| - | Providing & laying of Zig Zag Interlocking concrete block pavements having thickness 80mm as per drawings and techincal specification clause 1504. | 546.1 | CuM | 891.67 | ₹4,86,940.99 |
| - | Providing concrete for plain/reinforced concrete in open foundation complete as per drawings and techincal specifications clasuses 802,803,1202 & 1203 (Hand Mixing) Nominal mix 1:2:4 | 2.47 | CuM | 5,867.44 | ₹14,492.58 |
| - | Supply of RCC hume Pipe NP 3 including Collars/spigot jointed with stiff mixture of cement in proportion of 1:2 cement,sand including testing of joints. Page no.21 item no.18 | 10 | RM | 2,033 | ₹20,330 |
| - | Supply and fixing of granite stone information board i/c letter writing etc at site | 1 | JOB | 3,990 | ₹3,990 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.41 MB
Tendernotice_2.pdf
PDF • 5.96 MB
BOQ_2136074.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .