Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 3 176 ARULJOTHI NAGAR KARANAMPETTAI SULUR VIA COIMBATORE 641401 | COIMBATORE | TAMIL NADU | 641401 | Accepted-Technical acept |
| 2 | Accepted-Technical 1 129 KOOLANAICKENPATTI GOMANGALAM POLLACHI TAMILNADU 642107 | COIMBATORE | TAMIL NADU | 642107 | Accepted-Technical acept |
Tender Value
₹39.8 L
EMD Value
₹40,000
Closing Date
19 Feb 2026, 3:00 pmClosed
The Special Officer, Chinniampalayam
Village Panchayat Office, Chinniampalayam,Coimbatore
2 Nos of BT works in Chinniampalayam in Sulur block, Coimbatore District unger PerUrban 2025-26
2026_RDTN_659651_1
403/2025 / A2 Dt 04.02.2026
Open Tender
Civil Works
Item Rate
180 days
Sulur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,000
19 Feb 2026
17 Feb 2026
19 Feb 2026
17 Feb 2026
19 Feb 2026
17 Feb 2026
Clearing the scrub jungle including all labour charges for burrying and burning etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Supply and filling the collected gravel for Sub base and side Berms etc, complete.including all cost of materials and labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road Marking with Hot Applied Thermoplastic compound with refctorising glass beads on Bituminous surface.
Clearing the scrub jungle including all labour charges for burrying and burning etc., complete.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Supply and filling the collected gravel for Sub base and side Berms etc, complete.including all cost of materials and labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road Marking with Hot Applied Thermoplastic compound with refctorising glass beads on Bituminous surface.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_791463.xls
BOQ • 0.30 MB
technicalbid.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .