| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-Finance | ₹3.1 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.7 Cr+₹53.5 L (17.1%)Rejected-Finance NA | ₹3.7 Cr+₹53.5 L (17.1%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
29 Jun 2026, 6:00 pmClosed
SE PWD North Jammu, Lok Nirman Bawan
Office of the SUPERINTENDING ENGINEER PWD(R and B) NORTH CIRCLE JAMMU, Lok Nirman Bawan Jammu
Construction of 30mtr span Steel Trussed through Type Bridge (Double Lane) including footpath in Janipur to Ambgrota road at Km 7th near Petrol pump at Thathar, Jammu.
2026_PWDJK_312265_1
3rd Call e-NIT No. SENJ/07 of 2026-27 dated 12-06-2026
Open Tender
Civil Works
Percentage
240 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Superintending Engineer PWD Circle North Jammu
₹7.0 L
Office of the SE PWD North Jammu, Lok Nirman Bawan
4 Jul 2026
12 Jun 2026
30 Jun 2026
12 Jun 2026
29 Jun 2026
12 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design Drawing and Construction of 30.00 mtr span (C/C of bearings) Steel Trussed through Type Bridge (Double Lane) (Carriage way width 7.50 Mtrs) incl. Construction of 5.00 mtr long approaches on both sides with Designing/Commissioning and construction of foundation with necessary Dewatering if required RCC sub- structure covering abutments, dirt wall , return wall on Turn Key basis and RCC Superstructure including Deck Slab including Soil Investigation and Vetting of Design from Design Directorate/GCET or any IIT, with necessary protection works, walling, footpath of width 1.20 Mtr on Both side, Crash Barriers Both sides, Railing etc. as per IRC70 loading specifications incl. painting and finishing, supplying/ fixing of bearings, suitable expansion joints and laying of RCC wearing coat all inclusive; arranging and maintaining diversions, dewatering during execution including all leads, lifts and carriage (complete job) including Earthwork and Dismentaling of existing structure and as per directions of Engineer-in-charge. | 30 | Rmt | 7,00,000 | ₹2,10,00,000 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 731 | Cum | 256.85 | ₹1,87,757.35 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 32 | Cum | 5,202.9 | ₹1,66,492.8 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 331 | Cum | 5,733.6 | ₹18,97,821.6 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. | 1,014 | Cum | 7,564.8 | ₹76,70,707.2 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 72 | Cum | 7,788.4 | ₹5,60,764.8 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 7,920 | Kg | 123.3 | ₹9,76,536 |
| 8Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 9 | Foundations, footings, bases for columns | 780 | Sqm | 286.35 | ₹2,23,353 |
| 10 | Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 1,560 | Sqm | 628.95 | ₹9,81,162 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_1010804.xls
BOQ • 0.29 MB
nit07extention.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .