| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC AMETHIA NAGAR NAMKUM RANCHI | RANCHI | JHARKHAND | 829205 | ₹29.9 L | L1 | Accepted-AOC Wo awarded to L1 bidder |
| 2 | L2₹30.3 LRejected-Finance BOOTY SADAR RANCHI 835219 | RANCHI | RANCHI | JHARKHAND | 835219 | ₹30.3 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹30.3 LRejected-Finance MAHADEWA KOTHI CANARY HAZARIBAG | HAZARIBAG | HAZARIBAG | JHARKHAND | 825301 | ₹30.3 L | L3 | Rejected-Finance L3 bidder |
Tender Value
Refer Docs
EMD Value
₹60,500
Closing Date
25 May 2026, 3:00 pmClosed
General Manager,TZ-I, Ranchi
GENERAL MANAGER, TRANSMISSION ZONE-I, JHARKHAND URJA SANCHARAN NIGAM LIMITED KUSAI COLONY, P.O.-DORANDA, RANCHI, PIN -834002 Telephone no. 0651-2490513 (O)/ 9431707300 (Mobile)
Work for Carrying out routine patrolling, preventing/breakdown/shutdown maintenance work of Transmission Lines under Transmission Sub-Division, Hatia-II for F/Y-2026-27 w.e.f. 01.06.2026 to 31.03.2027
2026_JSEB_114008_1
168/PR/JUSNL/2026-27
Open Tender
Electrical Works
Works
TSD Hatia-II
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Yes
₹60,500
Yes
20 Jul 2026
14 May 2026
26 May 2026
14 May 2026
25 May 2026
14 May 2026
Routine Monthly Patrolling of 220KV & 132 KV Transmission Lines (111 Km) including tree prunning, repositioning of earth wire, checking, tightning & positioning of fasteners etc and back filling of earth errosion of tower legs along the corridor and vehicle with fuel & driver required for the work.
(i) 220KV Hatia-II-Katia D/C Trans. Line (43 km)
(ii) 220KV Hatia-II-PGCIL ckt-II (Ranchi) & 132 KV Hatia-I-Tamar Trans. Line upto loc no. 92 (35 Km)
(iii) 220KV Hatia-II-PGCIL(Namkum-Ranchi) D/C Trans. Line (33 Km)
Trip top Patrolling of 220 or 132 KV Transmission Lines including tree prunning along the corridor with complete checking and sort out the minor causes of tripping and vehicle with fuel & driver required for the work.
Break-Down and Scheduled Maintenance of Overhead High Voltage Transmission lines.
Mobilization of Labour Gang during supply of gang (One gang consist of 20 Person)
Demobilization of Labour Gang during supply of gang (One gang consist of 20 Person)
Supply of Emergency Gang with T&P for the work not mentioned above like snapping of conductor/earth wire/OPGW/Tower Collapse etc. (One Gang consist of 40 persons)
Transportation of materials by Small / Medium size truck from transmission central stores Namkum or other GSS to different sites/locations of line within 50 KM or for line visit. Truck Capacity-6MT
Rectification of optical fiber cable (OPGW) including OTDR and Splicing.
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 111 KM)
Sub-Total ₹
Contractors Profit @% on SI.No.- 01 & 02 ₹
Overhead Expenditure for T&P etc. @ 03 % on SI.No.- 01 & 02 ₹
Total ₹
GST @ 18 % on Total ₹
Labour Cess @1% on (Total + GST) ₹
G.Total ₹
Say Total ₹
(Rupees……………………………………..……………………………………………...…………….)only including all taxes.
Note:- Only Blue colour Column fill by agency.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQHatia-II.pdf
Tender Documents • 0.63 MB
Hatia2.xls
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].