Loading…
Loading…
Tender Value
₹57.1 L
EMD Value
₹1.1 L
Closing Date
14 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ELECT G
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of "V/N" or "V" whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. Similar Nature of Work are as follows for this work:- 1) Electrification of service buildings, 2) Electrification of staff quarters, 3) Electrification of offices, 4) Electrification of Road and colony lighting, 5) Electrification of Circulating area lighting, 6) Erection & commissioning of LT & HT upto 33kV overhead mains, 7) Sub-station installations & commissioning, 8) Electrification of washing-pits, sheds, workshops etc., 9) Any above work or combination of (1) to (8) above.
15 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he is qualifying the Qualifying criteria mentioned in the tender document. It will not be obligatory on the part of tender committee to scrutinize beyond the submitted document of tenderer as far as his qualification for the tender is concerned. The railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway there under.
No post tender correspondence shall be entertained after closing of tender even Suo moto post tender letters of the tenderers shall be treated as null/void.
The tenderers are required to observe the website to find out if any correction slips issued subsequent to uploading of the Tender . Railway reserves the right to make any additions/alterations to the tender uploaded and issue corrigendum to the same effect. In case the tenderer fails to take note of the above corrigendum, the additions and alterations entered/effected in the corrigendum shall be binding upon the tenderer and no claim what so ever will be entertained by Railway.
The tenderer should upload the documents carefully. The documents uploaded by tenderer should be clearly visible and in legible format.
Indian Railways Standard General Conditions of contract 2022 along with correction slips corrected up to date of closing of tender and the attached documents are part of the tender document.
The offers which are incomplete, without supporting documents, unsigned, conditional, will be summarily rejected.
As per letter No. 2022/CE-I/CT/GCC/Correspondence/ New Delhi, dated 14.05.2024 "On IREPS Module , a facility has already been created for online submission of Annexure-V. Therefore, the provision of downloading of Annexure-V of GCC & uploading of physically signed Annexure-V by tenderer had been discontinued on IREPS"
Strengthening of earthing in NKJ & STA depot in JBP division
JBP-L-T-No-41-2025~WCR
JBP-L-T-No-41-2025
Open
Works - General
6 Months
Jabalpur, Madhya Pradesh
₹0
₹1.1 L
14 Jan 2026
22 Dec 2025
31 Dec 2025
11 items across 6 schedules · ₹57,05,629.23 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Numbers | 65.00 1937.57 | — | 1,25,942.05 | |
| 2 | Numbers | 65.00 590.46 | — | 38,379.9 | |
| Item- 2 | maintenancefree earthing. (Dismantling of material like pipe, cover, strip No-RDSO/SPN/197/2008 consisting of singleearth multistrand single core PVC electrode to MEEB in the equipment and as per RDSO specifications - a) copper bonding thickness of minimum250 enhancement compound of RDSOapproved of 150 x 25 x 6 mm toterminate earth Installation ofMaintenance free earth includesdigging/auguring/boring of 2.8M, insertion of 3 mtr electrode sledge hammer where the neutral soil compound (EEC) in slury form and back single earth electrode to a copper tape connection on the copper tape of 150 x cable redundancy. The exothermal from RDSO approved firms which 300 x 300 mm (inside) dimension) mm thick with pulling hooks shall be in black and date of testing and | damage existing transported to pit which insulatedcopper cable roomin Copperbonded microns brand supplied rod- 1 no. & with contractors single earth pit and penetrating is assumed, filling, carrying of 150 x 25 25 x 6 mm on welding include concrete earth provided to average earth | earthing as per nearest depot etc) includes supply as per IS-694 for duplicate as per steel electrode of and UL listed and bag of minimum d) Copper strip of own material of 100 mm to 125 it at least filling of earth pit out exothermic 6 mm. Carrying out earth electrode material for bonding graphite moulds, clamps, pit with a concrete cover the pit. Back resistance value | — | site as per of 35 manufacturers 3.0 mtr marked- 10 kg- 3 300 x 25 x required mm dia to 0.2mtr by with for the earth weld side of shall |
| Schedule total | ₹1,64,321.95 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AC08to10.pdf
ATTACHMENT
41-2025tender.pdf
ATTACHMENT
GCCcorrectionslips.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .