Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Fee/PreQual/Technical/Finance 1 NEAR PRAJAKTA KANYA SALA GANDHI NAGAR NEW KHETAN NAGAR KAULKHED AKOLA AKOLA MAHARASHTRA 444005 | AKOLA | MAHARASHTRA | 444005 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹7.4 L+₹46,104.28 (6.67%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹7.8 L+₹92,300.78 (13.3%)Admitted-Fee/PreQual/Technical/Finance 561 8 | KANPUR | KANPUR NAGAR | UTTAR PRADESH | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.2 L
EMD Value
₹92,209
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, Kanpur Municipal Corporation
Chief Engineer Office, Kanpur Muncipal Corporation, Motijheel, Kanpur
Construction of the Chhath ghat near the submersible in Shanti Nagar under Zone 05, Ward 72 Dabauli.
2026_NNKAN_1206778_1
992/AA-5/26-27
Open Tender
Civil Works
Fixed-rate
Ward 72
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹92,209
10 Nov 2026
7 Nov 2026
10 Nov 2026
7 Nov 2026
10 Nov 2026
7 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.8-FS4003-Earth Work-E/W in Excavation in trenches for foundation pipe cable etc in ordinary soil (loan clay or sand) including 1.5left and 50m and dressing Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of SO m.Including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil.-Rate-215 per 1 Cum. | 57.6 | cum | 215 | ₹12,384 |
| 2 | PWD (SCH.) -273-FS5007-Concrete/R.C.C. Work-Providing and laying In position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:6:12 (1 cement : 6 coarse sand (zone-Ill): 12 graded Brick aggregate 40 mm (nominal size)-Rate-4380 per 1 Cum. | 7.68 | cum | 4,380 | ₹33,638.4 |
| 3 | 5.1.2-FS5023-Concrete/R.C.C. Work-p/l in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering,finishing and renforcement 1:1.5:3 p/l in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering,finishing and renforcement 1:1.5:3 (1 cement :1.5coarse sand :3 graded stone aggregate 20mm size-Rate-7590.00 per 1 Cum. | 14.4 | cum | 7,590 | ₹1,09,296 |
| 4 | Non-Sor-F10021-MILD STEEL & IRON WORK-M.S. or iron in plain work such as hevey size as fabrication of M.S. M.S. or iron in plain work such as hevey size as fabrication of M.S.-Rate-7200.00 per 1 Qtl | 6.78 | Qtl | 7,200 | ₹48,816 |
| 5 | Non-Sor-F31056-Non SOR-Supply and fixing of Sign board with pedastal including all labour work Supply and fixing of Sign board with pedastal including all labour work-Rate-3840.00 per 1 nos. | 1 | nos | 3,840 | ₹3,840 |
| 6 | 6.1.1-FS6001-BRICK WORK-Class-150 brick work in 1:4 cement, c. sand in foundation and pilnth etc all complete. Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plllinth in. Cement mortar 1:4 (1 cement: 4 coarse sand)-Rate-6600.00 per 1 Cum. | 46.8 | cum | 6,600 | ₹3,08,880 |
| 7 | 11.20.1-FS14006-FLOORING WORK-11.20.1 Supply & Fixing of Chequerred precast cement concrete tiles 22 mm thick In footpath & courtyard, jointed Lieht shade PIRment using white cement Supply & Fixing of Chequerred precast cement concrete tiles 22 mm thick In footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, Including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).-Rate-815.00 per 1 Sqm. | 114 | Sqm | 815 | ₹92,910 |
| 8 | 10.28-FS10012-MILD STEEL & IRON WORK-10.28 Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making_curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-In-charge, (for payment purpose only weight of stainless steel members shall be consideredexcluding fixing accessories such as nuts, bolts, fasteners etc.).-Rate-620.00 per 1 kg | 268.2 | Kg | 620 | ₹1,66,284 |
| 9 | 231(a)-FS3001-Cartage-Cartage of ballast, kankar, coal, grit of sand etc, including loading and unloading but exccluding stacking on pucca roads(3 km). Cartage of ballast, kankar, coal, grit of sand etc, including loading and unloading but exccluding stacking on pucca roads.-Rate-116.96 per 1 Cum. | 46 | cum | 116.96 | ₹5,380.16 |
| 10 | Add GST | 1 | Sqm | 1,40,657.14 | ₹1,40,657.14 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_2288121.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .