Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.3 L+₹20,169.50 (2.00%)Rejected-AOC | ₹10.3 L+₹20,169.50 (2.00%) | L2 | Rejected-AOC Rejected |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
22 May 2026, 1:00 pmClosed
Executive Officer Brajrajnagar Municipality
Brajrajnagar Municipality At-Lamtibahal PO-Brajrajnagar Dist-Jharsuguda
Paver Road
2026_ORULB_129179_26
BRJNRM -02/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Brajrajnagar Municipality
Please refer Tender documents
2 documents required · 2 mandatory
₹6,000
₹12,000
Yes
19 Sept 2026
14 May 2026
25 May 2026
14 May 2026
22 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and transportation of excavated earth by mechanical meanse as per the direction of the engineer-in-charge. | - | One Cum | 432.08 | - |
| 2 | Filling in foundation & plinth with sand watered & rammed including cost, conveyance royalty etc., Complete. | 1 | One Cum | 651.46 | ₹650.81 |
| 3 | C:C: (1:4:8) using 4 cm. size H.G. C.B metal including the cost of all materials, labour carriage, royalty etc complete. | 1 | One Cum | 5,179.36 | ₹5,174.18 |
| 4 | Brick work Fly Ash Brick in C.M (1:6) in Foundation including cost, conveyance and royalty and watering for curing etc complete. | - | One Cum | 5,936.9 | - |
| 5 | CC work of M20 Grade with 20 mm sizeand down graded black hard granite chips including cost, conveyance and royalty of all materials, cost of all labour,T&P etc. complete | 0.8 | One Sqm | 5,867.79 | ₹4,693.65 |
| 6 | Rigid smooth centering and shuttering for CC works including false works and dismantling them after casting including cost of materials complete in G.F. (A)Foundation & Plinth | 0.8 | One Sqm | 250.46 | ₹200.34 |
| 6.1 | (B) Slab | 1 | One Sqm | 769.02 | ₹768.94 |
| 7 | Supplying ,fitting,and placing uncoated HYSD reinforcement complete. | 1 | One Qntl. | 8,876.09 | ₹8,876 |
| 8 | 12mm thick cement plaster (1 : 4) over brick work with cement punning for skirting per 1 Sqm. | - | One Sqm | 187.8 | - |
| 9 | Fixing Ceramic tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1(1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of precast tiles. | - | One Sqm | 1,247.41 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 23.51 MB
BOQ_591310.xls
BOQ • 0.28 MB
corrigendum.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .