Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
6 Jul 2026, 5:00 pm3d left
Chief Engineer, HMDA
7th floor, East Wing, Swarnajayanthi Commerical Complex, Ameerpet-500038
1) Expansion of Secunderabad Contonement Board (SCB) main office building and 2) Construction of Circle office as a part of reconstruction of the affected structures falling in the Elevated corridor Projects i.e., SH-01 and NH-44 within the Jurisdiction of the Secunderabad Contonement Board.
710787
HMDA/DEV/CE/07/06/2026-27, Dt: 04.06.2026
OPEN
Civil Works
HYDERABAD
1 document required · 1 mandatory
₹8,241
₹2.3 L
22 Jun 2026
22 Jun 2026
22 Jun 2026
Earth work excavation in Ordinary Soil using Mechanical Means and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means - Upto 3M Depth and as directed by the Engineer-in-Charge. for SCB Circle building
Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308) and as directed by the Engineer-in-Charge. for SCB Circle building
Excavation for roadway in hard rock (Blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections including Overheads and Contractors Profit as per Technical Specification Clause 302.3.5 MORD/ 301 MORTH and as directed by the Engineer-in-Charge. for SCB Circle building
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) and as directed by the Engineer-in-Charge. for SCB Circle building.
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) and as directed by the Engineer-in-Charge. for SCB Circle building.
Carting and disposal of unserviceable material with a lead of 16KM within GHMC limits including all incidental, labour charges, overheads and contractors profit, etc., complete for finished item of work and as directed by the Engineer-in-Charge. for SCB Circle building
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING and as directed by the Engineer-in-Charge. for SCB Circle building
Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and complete for finished item of work in foundation and basement. (APSS No. 601 & 615) including Overheads and Contractors profit and as directed by the Engineer-in-charge. for SCB Circle building.
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601) including Overheads and Contractors profit and as directed by the Engineer-in-charge. for SCB Circle building.
Raised Pointing to RR/ CRS Masonry in CM (1:3) (with 50% river sand & 50% manufactured sand) including cost and conveyance of all materials in site, curing, labour charges etc, overheads & contractors profit, complete for finished item of work and as directed by the Engineer-in-charge.for SCB Circle building
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTING.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge.for SCB Circle building
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR PEDESTALS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Circle building.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR PLINTH BEAMS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Circle building.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Circle building.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Circle building.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF BEAMS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Circle building.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF SLAB 150MM THICK.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Circle building.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for sunshades.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Circle building.
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category-A Steel Major Steel Manufacturers including PSUs with minimum installed Production Capacity above 10 Lakh MT Per annum ( SAIL, VSP STEEL, TATA, JINDAL PANTHER) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) and as directed by the Engineer-in-charge. for SCB Circle building.
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) and as directed by the Engineer-in-charge. for SCB Circle building.
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) and as directed by the Engineer-in-charge. for SCB Circle building.
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) as directed by Engineer-in-charge. for SCB Circle building.
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding , lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) as directed by Engineer - in - charge. for SCB Circle building.
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Colouring - Providing / Texture to External walls and as directed by the Engineer-in-charge. for SCB Circle building.
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. and as directed by the Engineer-in-charge. for SCB Circle building.
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty and as directed by the Engineer-in-charge. for SCB Circle building.
Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. and as directed by the Engineer-in-charge. for SCB Circle building.
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections as per the need and 102 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gaskets for sash & Glazing bead shall be co-extruded with Grey colour soft PVC System shall be provided with 4 no’s of 3D Hinges for each shutter and multipoint locking with keys with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. and as directed by the Engineer-in-charge.for SCB Circle building.
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter – (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work and as directed by the Engineer-in-charge..
Supplying and fixing ornamental MS Grills including fabrication and erection in position using alround frame of 25mm X 6mm MS flat welded with 10mm X 10mm square bar rods placed at 4" and 2" c/c (alternate spacing) fixed in both horizontal and vertical directions including cost and conveyance of all materials to work site, all operational, incidental labour charges, power charges, overheads & contractors profit etc., complete for finished item of work. for SCB Circle building.
Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors. for SCB Circle building.
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. for SCB Circle building.
Flooring with Double charged / multi charged Premium colour stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) for SCB Circle building.
Skirting with Double charged / multi charged premium colour stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. for SCB Circle building.
Providing specialized high performance acrylic polymer modified elastomeric cementitious waterproof coating to the terrace / walls / internal portion of the bathroom & toilets / internal portion of the water tanks duly cleaning of the surface from dirt, dust and other contaminations, providing and application of Two coats of High performance Acrylic polymer modified Elastomeric cementitious waterproof coating ( 1.8 Sq. Mtr. / Kg /Each Coat ) for SCB Circle building.
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). for SCB Circle building.
Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328) for SCB Circle building.
Earth work excavation in Ordinary Soil using Mechanical Means and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means - Upto 3M Depth and as directed by the Engineer-in-Charge. for SCB Office building
Earth work excavation (Mechanical Means) in ordinary rock (not requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges as per SS 20 B(APSS 308) and as directed by the Engineer-in-Charge. for SCB Office building-ground floor
Excavation for roadway in hard rock (Blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections including Overheads and Contractors Profit as per Technical Specification Clause 302.3.5 MORD/ 301 MORTH and as directed by the Engineer-in-Charge. for SCB Office building-ground floor
Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) and as directed by the Engineer-in-Charge. for SCB Office building-ground floor.
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) and as directed by the Engineer-in-Charge.for SCB Office building-ground floor.
Carting and disposal of unserviceable material with a lead of 16KM within GHMC limits including all incidental, labour charges, overheads and contractors profit, etc., complete for finished item of work and as directed by the Engineer-in-Charge. for SCB Office building-ground floor.
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING and as directed by the Engineer-in-Charge.for SCB Office building-ground floor
Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and complete for finished item of work in foundation and basement. (APSS No. 601 & 615) including Overheads and Contractors profit and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
CR stone masonry in 2nd sort in CM (1:6) prop: (cement : sand) using hard granite stones from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., and overheads & contractors profit, complete for finished item of work in foundation & basement. (APSS No. 615 & 601) including Overheads and Contractors profit and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Raised Pointing to RR/ CRS Masonry in CM (1:3) (with 50% river sand & 50% manufactured sand) including cost and conveyance of all materials in site, curing, labour charges etc, overheads & contractors profit, complete for finished item of work and as directed by the Engineer-in-charge.for SCB Office building-ground floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTING.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge.for SCB Office building-ground floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR PEDESTALS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR PLINTH BEAMS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF BEAMS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF SLAB 125MM THICK.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge.for SCB Office building-ground floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for sunshades.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category-B Steel Other Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT Per annum to 10 Lakh MT per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR / MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) and as directed by the Engineer-in-charge. for SCB Office building- Ground Floor.
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding , lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) as directed by Engineer-in-charge. for SCB Office building-ground floor.
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) as directed by Engineer - in - charge. for SCB Office building-ground floor.
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding or:-External Colouring - Providing / Texture to External walls and as directed by the Engineer-in-charge. for SCB Office building-ground floor.
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. and as directed by the Engineer-in-charge. for SCB Office building.
Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty and as directed by the Engineer-in-charge. for SCB Office building.
Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer. and as directed by the Engineer-in-charge. for SCB Office building.
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections as per the need and 102 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gaskets for sash & Glazing bead shall be co-extruded with Grey colour soft PVC System shall be provided with 4 no’s of 3D Hinges for each shutter and multipoint locking with keys with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. and as directed by the Engineer-in-charge.for SCB Office building.
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter – (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building.
Supplying and fixing ornamental MS Grills including fabrication and erection in position using alround frame of 25mm X 6mm MS flat welded with 10mm X 10mm square bar rods placed at 4" and 2" c/c (alternate spacing) fixed in both horizontal and vertical directions including cost and conveyance of all materials to work site, all operational, incidental labour charges, power charges, overheads & contractors profit etc., complete for finished item of work. for SCB Office building.
Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades using ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors. for SCB Office building.
Flooring with Double charged / multi charged Premium colour stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) for SCB Office building-ground floor.
Skirting with Double charged / multi charged premium colour stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. for SCB Office building- ground floor.
Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328) for SCB Office building.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-First Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building- First Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF BEAMS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-First Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF SLAB 125MM THICK.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge.for SCB Office building-First Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for sunshades.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building -First Floor.
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category-B Steel Other Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT Per annum to 10 Lakh MT per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR / MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) and as directed by the Engineer-in-charge. for SCB Office building-First Floor.
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) and as directed by the Engineer-in-charge. for SCB Office building-First Floor.
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) and as directed by the Engineer-in-charge. for SCB Office building -First Floor.
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) as directed by Engineer-in-charge. for SCB Office building -First Floor.
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) as directed by Engineer - in - charge. for SCB Office building -First Floor.
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Colouring - Providing / Texture to External walls and as directed by the Engineer-in-charge. for SCB Office building-First Floor.
Flooring with Double charged / multi charged Premium colour stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) for SCB Office building-First Floor.
Skirting with Double charged / multi charged premium colour stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. for SCB Office building-First Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-Second Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building- Second Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF BEAMS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-Second Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF SLAB 125MM THICK.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge.for SCB Office building-Second Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for sunshades.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building -Second Floor.
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category-B Steel Other Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT Per annum to 10 Lakh MT per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR / MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) and as directed by the Engineer-in-charge. for SCB Office building-Second Floor.
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) and as directed by the Engineer-in-charge. for SCB Office building-Second Floor.
Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) and as directed by the Engineer-in-charge. for SCB Office building -Second Floor.
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding , lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) as directed by Engineer-in-charge. for SCB Office building -Second Floor.
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) as directed by Engineer - in - charge. for SCB Office building -Second Floor.
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Colouring - Providing / Texture to External walls and as directed by the Engineer-in-charge. for SCB Office building-Second Floor.
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.
Flooring with Double charged / multi charged Premium colour stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707) for SCB Office building-Second Floor.
Skirting with Double charged / multi charged premium colour stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering. for SCB Office building-Second Floor.
Providing specialized high performance acrylic polymer modified elastomeric cementitious waterproof coating to the terrace / walls / internal portion of the bathroom & toilets / internal portion of the water tanks duly cleaning of the surface from dirt, dust and other contaminations, providing and application of Two coats of High performance Acrylic polymer modified Elastomeric cementitious waterproof coating ( 1.8 Sq. Mtr. / Kg /Each Coat ) for SCB Office building-Second Floor.
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). for SCB Office building-Second Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-Third Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-Third Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF BEAMS.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building-Third Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR ROOF SLAB 125MM THICK.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge.for SCB Office building-Third Floor.
Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, Wallers, Foot plates, brackets, steel Centering Plates, etc, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for sunshades.but excluding seignorage charges, complete for finished item of work and as directed by the Engineer-in-charge. for SCB Office building -Third Floor.
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Category-B Steel Other Steel Manufacturers with minimum installed Production Capacity of 2 Lakh MT Per annum to 10 Lakh MT per annum (GOEL, SHYAM, JAI BALAJI, AFSTAR / MSLIFE TMT, RADHA TMT, SUGNA TMT, SHREE TMT) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) and as directed by the Engineer-in-charge. for SCB Office building-Third Floor.
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) and as directed by the Engineer-in-charge. for SCB Office building-Third Floor.
Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding , lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) as directed by Engineer-in-charge. for SCB Office building -Third Floor.
Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding , lift charges, curing, cutting grooves etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) as directed by Engineer - in - charge. for SCB Office building-Third Floor.
Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding for:-External Colouring - Providing / Texture to External walls and as directed by the Engineer-in-charge. for SCB Office building-Third Floor.
Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). for SCB Office building-Third Floor.
Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work. (152.4 mm (6") dia - 3' Depth) for Water Supply & Sanitary Works for SCB Office building.
Constructing 904.0 mm (3’0”) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½” thick both inside and outside fitted with 20” dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 3'-0" Depth for Water Supply & Sanitary Works for SCB Office building.
Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work. for Water Supply & Sanitary Works for SCB Office building.
Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed with 'S' trap with CI short Connector & 4" dia CP thimble pipe: 150 mm long, best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and 15 mm nominal size PVC connection with brass union nut C.P coated all of approved make, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.for Water Supply & Sanitary Works for SCB Office building.
Supplying & Fixing Indian make WHITE Flat Back Wash Hand Basin of size 550 x 400 mm with Single C.P. Pillar cock 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15 mm nominal size PVC connection with brass union nut C.P coated, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality and standard CI brackets including wooden block, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects. for Water Supply & Sanitary Works for SCB Office building.
Supply and fixing CP finish brass soap dish of approved make with screws, including cost and conveyance of all materials to site, all operational, incidental, labour charges and overhead & contractor's profit etc. complete for finished item of work as directed by Engineer-in-charge for Water Supply & Sanitary Works for SCB Office building.
Supplying and fixing Rectangular Mirror Frameless of size 609.6 mm x 914.4 mm including cost and conveyance of all materials to site, all operational,incidental , labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge for Water Supply & Sanitary Works for SCB Office building.
S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work for Water Supply & Sanitary Works for SCB Office building.
S&F of Chromium plated finish stainless steel body towel rail 24'' with 10 years warranty including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work for Water Supply & Sanitary Works for SCB Office building.
Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make : 590 x 375 x 390 mm, fitted with 15 mm brass body CP finish self closing tap push type conforming to IS 1711 and 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects for Water Supply & Sanitary Works for SCB Office building.
Supplying and fixing of 16mm to 20 mm thick polished marble slab partitioins of size 3' 0" x 2' 0" for urinals including full rounding the edges , fixing in position, polishing, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work for all floors for Water Supply & Sanitary Works for SCB Office building.
Supplying & fixing 4 " x 24 " (101.6x609.6mm) white glazed porcelain channel fixed in brick masonry white cement pointing, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge for Water Supply & Sanitary Works for SCB Office building.
S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 13.5- 15.90mm OD pipe for Water Supply & Sanitary Works for SCB Office building.
S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 13.5-22.20mm OD pipe for Water Supply & Sanitary Works for SCB Office building.
S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge - SDR 13.5-28.60mm OD pipe for Water Supply & Sanitary Works for SCB Office building.
S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineerin-charge including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge. (25mm Nominal bore) for Water Supply & Sanitary Works for SCB Office building.
Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) -75mm dia for Water Supply & Sanitary Works for SCB Office building.
Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) - 110mm dia for Water Supply & Sanitary Works for SCB Office building.
Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work for Water Supply & Sanitary Works for SCB Office building.
Supply and laying of 25mm dia PVC pipe of heavy grade with IS:9537 part 3 rigid pipe concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes:Sudhakar/Modi/Finolex for Internal Electrification Works for SCB Office building.
Supply and laying of 25mm dia P.V.C. pipe pipe of medium grade with IS:9537 part 3 rigid pipe concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well metal deep box including all labour charges etc., complete. Makes:Sudhakar/Polycab/Finolex. for Internal Electrification Works for SCB Office building.
Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLS/HFFR P.V.C. insulated flexible copper cable (ISI MARK) of makes Finolex/RR Kabel/Havells/Polycab in existing pipe with 10A switch, Ceiling rose and modular frame covering to switch control box including all labour charges etc., complete for light points in Buildings. Makes: Legrand Arteor/Honeywell Blenge Plus/L & T Englaze for Internal Electrification Works for SCB Office building.
Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable IS:694/1990, IS 17048 with one run of 36/0.3mm (2.5 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab for Internal Electrification Works for SCB Office building.
Supply and run of 2 of 56/0.3mm (4 Sq.mm) FRLSH/HFFR P.V.C. insulated flexible copper cable IS:694/1990, IS 17048 with one run of 56/0.3mm (4 Sqmm) for earth continuity in existing pipe for mains inlcuding all labour charges etc., complete. Makes: Finolex/RR Kabel/Havells/Polycab for Internal Electrification Works for SCB Office building.
Supply and fixing of 10A 3/2pin 2 module socket with 10A switch control on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Legrand Arteor / Schneider Zen celo Blenge / Crabtree Murano. for Internal Electrification Works for SCB Office building.
Supply and fixing of 20A 3 pin 2 module socket with 20A switch control (with indicator) on a seperate switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Legrand Arteor / Schneider Zen celo Blenge / Crabtree Murano. for Internal Electrification Works for SCB Office building.
Supply and fixing SPN Distribution board 8 Way with IP-43 protection suitable for single phase 40 A Double Pole (DP) Isolator as incomer and 6 Nos 6-32 A,10kA SP MCBs as out going including internal connections and labour charges for flush mounting etc., complete. Makes: Legrand DX3/Schneider Acti9/Siemens.for Internal Electrification Works for SCB Office building.
Supply and fixing of 9" (225mm), Light duty exhaust fan with double ball bearing and wire guard etc and labour charges for fixing of Exhaust fan in wall with necessary connections etc., completeof makes Crompton / Havells Ventil Air-DB / Orient hill air. for Internal Electrification Works for SCB Office building.
Supply and fixing of 10W LED mirror light of 600mm length with all standard accessories diffuser etc and including labour charges for fixing etc., complete. Makes: Philips/Crompton/GE for Internal Electrification Works for SCB Office building.
Supply, transportation and fixing of 22W, 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF≥0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI≥80 etc., complete with 50,000 burning hours with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. for Internal Electrification Works for SCB Office building.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender document SCB.docx
TENDER_DOCUMENT • 0.19 MB
BOQ SCB.xlsx
TENDER_DOCUMENT • 0.04 MB
Download all tender documents and submit your bid