Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹75.6 LAdmitted-Technical | L1 | Admitted-Technical Responsive | ||
| 2 | L2₹76.4 L+₹73,031.20 (0.97%)Admitted-Technical ANANTNAG ANANTNAG JAMMU AND KASHMIR | ANANTNAG | JAMMU AND KASHMIR | 192101 | L2 | Admitted-Technical Responsive | ||
| 3 | L3₹76.6 L+₹97,928.20 (1.29%)Admitted-Technical | L3 | Admitted-Technical Responsive | ||
| 4 | L4₹76.9 L+₹1.3 L (1.72%)Admitted-Technical | L4 | Admitted-Technical Responsive | ||
| 5 | L5₹83.0 L+₹7.4 L (9.73%)Admitted-Technical | L5 | Admitted-Technical Responsive |
Tender Value
₹97.9 L
EMD Value
₹2.0 L
Closing Date
15 Sept 2026, 3:00 pmClosed
Executive Engineer PWD RNB DH PORA
Executive Engineer PWD RNB DH PORA
Construction of Road from Goriwan to sheikh Mohalla Asnoor
2026_PWDJK_323082_2
47 Of RnB/D.H. Pora/2026-27/3438-45 Dtd 01/09/2026
Open Tender
Civil Works
Percentage
1080 days
Executive Engineer PWD RNB DH PORA
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,600
Acc no 0470010200000099
₹2.0 L
16 Sept 2026
1 Sept 2026
16 Sept 2026
2 Sept 2026
15 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Felling of trees | |||||
| 2Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||
| 2.01 | Beyond 30 cm girth upto and including 60 cm girth. | - | No | 0.4 | - |
| 2.02 | Beyond 60 cm girth upto and including 120 cm girth. | - | No | 1 | - |
| 3Earth work in cutting & filling | |||||
| 4 | Engagment of Hydraulic Excavator for Site Clearance, Removal of Loose Material/Dumped Material and Enchorachment, Dismentaling and Demolishing of Cement Concrete, Walling, Side Cutting, Widening,Curve Development, Removal of Tree Truncks, Prepration of Road Surface including the disposal of material as per the directions of Engineer in charge. | - | hour | 0.2 | - |
| 5 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | - | sqm | 0.4 | - |
| 6 | Earth work in bulk excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | - | Cum | 0.2 | - |
| 7 | Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade. | - | sqm | 1 | - |
| 8 | Carriage of excavated material by Mechanical Transport from source to dumping/yard point by an average lead of 1km. Including loading and unloading complete job. | - | Cum | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
finance_1086302.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1086302.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .