Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 CrAccepted-AOC B 104 KESAR GARDEN APARTMENT SECTOR 48 NOIDA GAUTAM BUDDH NAGAR | NOIDA | GAUTAM BUDDH NAGAR | UTTAR PRADESH | ₹5.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹5.4 CrRejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹5.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹5.6 CrRejected-Finance 6 204 TIKONIYAN BELANGANJ AGRA | AGRA | AGRA | UTTAR PRADESH | ₹5.6 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹6.0 CrRejected-Finance NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹6.0 Cr | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | UMESH CHANDRA MISHRA L1 | M/s B.B.Goyal L3 | GSB DEVELOPERS PRIVATE LIMITED L4 | Santosh Kumar Sharma L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in fondation in dry ordinary soil (loam clay or sand) including lift upto 105 meter and lead upto 30 meter and including back filling, watering and ramming of excavated earth into the space 1 between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 meter from the foundation trenches. | 8,625 | Cum | 55 ₹4.7 L | 50 ₹4.3 L | 60 ₹5.2 L | 50 ₹4.3 L |
| 2.00 | Cement Concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 Stone Ballast ) in foundation with stone ballast 10-20 mm size including all labour and T&P required for completion of work as directed by Engineer-in -charge. | 1,552 | Cum | 3,800 ₹59.0 L | 4,000 ₹62.1 L | 5,100 ₹79.2 L | 3,500 ₹54.3 L |
| 3.00 | Random Rubble Stone Masonary in 1:4 cement mortar including cost of all material & labour, T&P etc required for completion of work as directed by Engineer-in -charge. | 11,902 | Cum | 3,800 ₹4.5 Cr | 4,000 ₹4.8 Cr | 4,220 ₹5.0 Cr | 3,900 ₹4.6 Cr |
| 4.00 | Cement Concrete 1:2:4 (1 Cement : 2 Coarse Sand : 4 Stone Ballast ) in coping on stone masonary including all labour and T&P required for completion of work as directed by Engineer-in -charge. | 258 | Cum | 4,700 ₹12.1 L | 5,000 ₹12.9 L | 4,600 ₹11.9 L | 5,000 ₹12.9 L |
| 5.00 | Centering and shuttering for C.C. Work including rent of shuttering material, labour and T&P required for proper completion of work as directed by Engineer-in -charge. | 1,150 | Sqm | 100 ₹1.1 L | 300 ₹3.5 L | 395 ₹4.5 L | 300 ₹3.5 L |
Tender Value
₹8.1 Cr
EMD Value
₹16.3 L
Closing Date
20 Feb 2026, 1:00 pmClosed
Superintending Engineer
3rd Circle Irrigation Works, 139 Mall Road Pratappura, Agra
Construction of boundary wall for the protection of government land of U.P. Irrigation Department from Km 30.200 to Km 36.000 on the left and right side of Agra Canal in Haryana State.
2026_UPIDC_1114768_1
14/SE/2025-26
Open Tender
Civil Works
365 days
Haryana State
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹16.3 L
Office of The SE 3rd Circle Irrigation Works, Agra
7 Mar 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
16 Feb 2026
Earth work in excavation in fondation in dry ordinary soil (loam clay or sand) including lift upto 105 meter and lead upto 30 meter and including back filling, watering and ramming of excavated earth into the space 1 between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 meter from the foundation trenches.
Cement Concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 Stone Ballast ) in foundation with stone ballast 10-20 mm size including all labour and T&P required for completion of work as directed by Engineer-in -charge.
Random Rubble Stone Masonary in 1:4 cement mortar including cost of all material & labour, T&P etc required for completion of work as directed by Engineer-in -charge.
Cement Concrete 1:2:4 (1 Cement : 2 Coarse Sand : 4 Stone Ballast ) in coping on stone masonary including all labour and T&P required for completion of work as directed by Engineer-in -charge.
Centering and shuttering for C.C. Work including rent of shuttering material, labour and T&P required for proper completion of work as directed by Engineer-in -charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_2067640.xls
BOQ • 0.32 MB
TenderDocument30_200.pdf
Tender Documents • 1.73 MB
Download all tender documents and submit your bid