Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Finance | -39.90% | ₹13.1 L | L1 | Admitted-Finance |
| 2 | L2₹18.1 L+₹5.0 L (38.5%)Admitted-Finance | -16.77% | ₹18.1 L+₹5.0 L (38.5%) | L2 | Admitted-Finance |
Tender Value
₹21.7 L
EMD Value
₹43,460
Closing Date
10 Aug 2026, 4:00 pmClosed
ADGP Hqrs PHQ
Srinagar
Renovation
2026_DGPJK_318862_2
e-NIT/EE-PCD/PHQ/58/2026-27
Open Tender
Civil Works
Percentage
90 days
SKPA Udhamour
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
Exen PCD PHQ
₹43,460
13 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge 1:3:6 or richer mix (i/c equivalent design mix) | 11.28 | Sqm | 1,725.2 | ₹19,460.26 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge All kinds of soil | 59.13 | Cum | 479.3 | ₹28,341.01 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 5.33 | Cum | 5,202.9 | ₹27,731.46 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 9.37 | Cum | 5,733.6 | ₹53,723.83 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 17.12 | Cum | 9,821.85 | ₹1,68,150.07 |
| - | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 37.44 | Cum | 7,571.55 | ₹2,83,478.83 |
| - | Extra for brick work with common burnt clay bricks/ cement concrete bricks in superstructure above plinth level upto floor five level | 37.44 | Cum | 1,455.65 | ₹54,499.54 |
| - | Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead With cement mortar 1:4 (1 cement : 4 fine sand) | 14.5 | Sqm | 441.4 | ₹6,400.3 |
| - | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc.complete. | 14.5 | Sqm | 14.5 | ₹210.25 |
| - | Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete 2 mm thick | 193.77 | Sqm | 181.05 | ₹35,082.06 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.30 MB
BOQ_1053165.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .