Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
7 Oct 2026, 6:00 pmClosed
Executive Engineer
HPPWD JUbbal
Sh Construction of B/wall at RD 0/755 to 0/765, 4/740 to 4/748.20, 4/826 to 4/856, 5/765 to 5/785)
2026_PWD_144388_7
7368-71, Dated 23.09.2026
Open Tender
Civil Works
Percentage
Jubbal
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹19,000
15 Oct 2026
30 Sept 2026
8 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in Hilly Area in all kind of sand by mechanical/manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto any lead and lift as per Technical Specification Clause 1603.1 and as per HPPWD, specification of 1990 Volume-I, or as directed by the Engineer-In-Charge. | 127.35 | Per Cum | 203 | ₹25,852.05 |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost as per HPPWD, specification of 1990 volume-I | 87.4 | Per Cum | 524.1 | ₹45,806.34 |
| 3 | Providing and Laying concrete 1:6:12 for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 and as per HPPWD, specification of 1990 volume-I | 23.29 | Per Cum | 4,683.55 | ₹1,09,079.88 |
| 4 | Stone Random Rubble Masonry work In cement mortar 1:6 (1 cement : 6 sand ) in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. | 92.61 | Per Cum | 4,585.65 | ₹4,24,677.05 |
| 5 | Construction of dry rubble masonary for retaining walls, breast walls,revetment walls and parapets etc. for sub-structure and super structure complete as per drawing and technical specification clauses 704.6 & 1302.5 including all leads and lifts, as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge | 94.27 | Per Cum | 3,270.45 | ₹3,08,305.32 |
| 6 | Backfilling behind abutment, wing wall and return wall with Granular materialcomplete as per drawings & technical specification Clause 1204.3.8 , as per HPPWD, specification of 1990 volume-I | 77 | each | 450 | ₹34,650 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_214731.xls
BOQ • 0.23 MB
7.pdf
Tender Documents • 2.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .