Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹9.2 L (5.55%)Admitted-Finance | ₹1.8 Cr+₹9.2 L (5.55%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s B.K. Mozika L1 | Socristo Enterprise L2 |
|---|---|---|---|---|---|
| 1.01 | Hiring of 01 No Excavator cum Loader with Back Hoe capacity 0.24 cum and loader capacity 1.00 cum for construction of ETALIN - MALINEY road under AOR of 1446 BCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract | 1,000 | Hrs | - | - |
| 1.02 | Hiring of 01 No Stone Crusher 20 TPH with Diesel Gen. set of matching capacity for construction of ETALIN - MALINEY road under AOR of 1446 BCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract | 900 | Hrs | - | - |
| 1.03 | Hiring of 01 No HMP 20 TPH with Diesel Gen. set of matching capacity for construction of ETALIN - MALINEY road under AOR of 1446 BCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract | 567 | Hrs | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 Cr
Closing Date
22 Jun 2020, 11:00 amClosed
The Chief Engineer (P) Udayak
HQ CE (P) Udayak C/O 99 APO, PIN-931715
HIRING OF 01 NO EXCAVATOR CUM LOADER, 1 NO STONE CRUSHER AND 01 NO HMP FOR CONSTRUCTION OF MAJOR PMT BRIDGES, PMT WORKS, SURFACING WORKS, RESURFACING WORKS AND MAINT WORKS ON ETALIN - MALINEY ROAD UNDER 1446 BCC/752 BRTF PROJECT UDAYAK IN AP STATE
2020_BRO_562180_1
TENDER No CE (P) UDAYAK-11 of 2020-21
Open Tender
Civil Works
Item Rate
270 days
Road Etalin Maliney
As per Tender Documents
5 documents required · 5 mandatory
₹0
₹1.1 Cr
Yes
HQ CE (P) Udayak C/O 99 APO
6 Jul 2020
1 Jun 2020
23 Jun 2020
1 Jun 2020
22 Jun 2020
10 Jun 2020
2 Jun 2020 - 8 Jun 2020
9 Jun 2020
Amount
Hiring of 01 No Excavator cum Loader with Back Hoe capacity 0.24 cum and loader capacity 1.00 cum for construction of ETALIN - MALINEY road under AOR of 1446 BCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract
Hiring of 01 No Stone Crusher 20 TPH with Diesel Gen. set of matching capacity for construction of ETALIN - MALINEY road under AOR of 1446 BCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract
Hiring of 01 No HMP 20 TPH with Diesel Gen. set of matching capacity for construction of ETALIN - MALINEY road under AOR of 1446 BCC/752 BRTF Project Udayak all as specified and directed by Engineer-In-Charge/OC Contract
Socristo Enterprise
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.07 MB
ip80035.PDF
Additional Documents • 0.48 MB
BOQ_589957.xls
BOQ • 0.23 MB
TD80035.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .