Loading…
Loading…
Tender Value
₹15.1 L
EMD Value
₹15,126
Closing Date
20 Oct 2026, 5:00 pm
Divisional Officer
RURAL WORKS ELECT DIVISION, BHUBANESWAR
Provision of On-Grid Roof top Solar Photovoltaic System at RW Electrical, Mechanical, PH Division, Bhubaneswar Under R.W.E.S Bhubaneswar.
2026_CERWI_142746_1
EERWELBBSR 29/ 2026-27
Open Tender
Electrical Works
Percentage
180 days
Bhubaneswar
2 documents required · 2 mandatory
₹6,000
₹15,126
7 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
20 Oct 2026
7 Oct 2026
7 Oct 2026 - 8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | S/F of computer board of 12 modular metal box with modular base & cover in recess including providing and fixing of consisting of 3 nos of 5amp modular switch and modular socket & 1 no of Mini MCB, connection, painting etc as required. (Make of Switch & Socket: Anchor / Cona/ Greatwhite/ Havells/ HPL/ Preeti) | 2 | each | 1,393.88 | ₹2,787.76 |
| 2 | Wiring for circuit / sub-main wiring along with earth wire with following sizes of PVC insulated single core multistrand copper conductor with ISI marked conforming to IS-694/1990 in 20mm dia non metalic heavy duty flexible conduit 1.6mm in recessed PVC conduit as required (Make of wire: Finolex/ L&T / Anchor / Havels /HPL / V Guard/ KEI/ Greatwhite/ Polycab)-2x2.5+1x1.5 (1.8.2) | 33.8 | mtr | 175.35 | ₹5,927.01 |
| 3 | Supply, installation, testing & commissioning of 5KVA UPS SYSTEM WITH IGBT based inverter system, true online double conversion system, inbuilt isolation transformer of 1ph in put to 1 ph output,230V, with built in BMS with battery back up up to 30 minutes with MS Rack for battery Housing, DC cable 7 Mtr with SFU and links for installation (Battery required: 12V, 26AH, 20 No.s) protection for fault by OL,UV, EF,GF,OC,Ph. (Make: Numeric/APC/Vertiv/), as per direction of Engg.-in-Charge. Warranty period of all accessories & component & system must be 2 years & complete test certificate must be submitted along with ups including component list & SLD. for services building | 1 | set | 2,20,000 | ₹2,20,000 |
| 4 | S/F of 1.5T 3Star split type AC Machine with 16A Plugtop & 2.5sqmm 3core Cu cable as per the site requirement(Make-Carrier/Hitachi/Bluestar/LG/Mistubishi/O-General/Daikin) | 1 | each | 57,334.82 | ₹57,334.82 |
| 5 | Supply, installation, testing & commissioning of 24W Slim Edge-Lit LED Downlight (Round/Square) with die-cast aluminum body, white finish, glare-free diffuser, complete with LED driver and mounting accessories, suitable for 220-240V AC, 50Hz operation, high efficiency and long life. (Havells/crompton/philips/panasonic) | 20 | each | 2,295.45 | ₹45,909 |
| 6 | S/F of 4KVA Automatic Voltage Stabilizer(110-300V), (Make-Microtech/V-Guard) | 1 | each | 10,279 | ₹10,279 |
| 7 | Design, Supply, installation , testing , Integration & commissioning of ongrid Solar roof mounted Photo voltaic Power Plant conforming to MNRE specifications as amended, consisting of MONO BI-FICIAL TOPCON solar panel , net metering facility, necessary protections, earthing, mounted on Aluminium/GIstructure of suitable strength with following components complete as required:-a) Solar Photo voltaic Module of capacity (600-620)WP,144 cell or above, manufactured in India, conforming to IS14286/ IEC61215, IS/IEC61730-Part-1, IS/IEC61730-Part-2. Solar Photo voltaic Module conversion efficiency shall not be less than 16.5%. PVmodules used in solar power plants/ systems must be warranted for their out put peak watt capacity, which should not be less than 90% at the end of 10years and 80% at the end of 25 years. b)Power Conditioning Unit (PCU)of 350-800V DC Input voltage range and 400V AC, three phase, 4wire, 50Hz+/-2.5Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3%and suitable for ambient temperature from 0 to 50 degree C. with 25 year warranty on solar module As per the direction of the Engineer-In-Charge. Design, Supply, installation , testing , Integration & commissioning of 10 KW ongrid Solar roof mounted Photo voltaic Power Plant along with generation meter as per the direction of Engineer-in-Charge - 17 Nos PV Solar Panel ( Make: Tata Power Solar/Waaree Energies/V-Guard/Luminous Solar/Microtek Solar/Equivalent) MNRE-approved 10KW grid-tied solar inverter with dual MPPT, minimum efficiency of 97.5%, and inbuilt protections. The inverter shall be IP65 or higher rated, suitable for outdoor installation, and capable of operating reliably in ambient temperatures from 25°C to +60°C. It shall feature a user-friendly LCD/LED display to show real-time operating status and performance metrics. The inverter must support net metering, comply with IEC/BIS standards, and include all necessary mounting accessories. A minimum warranty of 10 years shall be provided.-1 Set ( Make: V-Guard/Luminous /Microtek /Equivalent ) | 10 | each | 63,500 | ₹6,35,000 |
| 8 | Design, Supply, installation , testing , Integration & commissioning of ongrid Solar roof mounted Photo voltaic Power Plant conforming to MNRE specifications as amended, consisting of MONO BI-FICIAL TOPCON solar panel , net metering facility, necessary protections, earthing, mounted on Aluminium/GIstructure of suitable strength with following components complete as required:-a) Solar Photo voltaic Module of capacity (600-620)WP,144 cell or above, manufactured in India, conforming to IS14286/ IEC61215, IS/IEC61730-Part-1, IS/IEC61730-Part-2. Solar Photo voltaic Module conversion efficiency shall not be less than 16.5%. PVmodules used in solar power plants/ systems must be warranted for their out put peak watt capacity, which should not be less than 90% at the end of 10years and 80% at the end of 25 years. b)Power Conditioning Unit (PCU)of 350-800V DC Input voltage range and 400V AC, three phase, 4wire, 50Hz+/-2.5Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3%and suitable for ambient temperature from 0 to 50 degree C. with 25 year warranty on solar module As per the direction of the Engineer-In-Charge. Design, Supply, installation , testing , Integration & commissioning of 8KW ongrid Solar roof mounted Photo voltaic Power Plant along with generation meter as per the direction of Engineer-in-Charge - 14 Nos PV Solar Panel ( Make: | 8 | each | 63,500 | ₹5,08,000 |
| 9 | 2-Year Comprehensive AMC Annual Maintenance Contract (AMC) after 1-year Defect Liability Period (DLP) to be carried out once every six months (two visits per year)@Rs. 632/- per KW/Year for next two years. including cleaning of PV modules, inspection of inverter/PCU, battery health check (electrolyte level/top-up if applicable), cable tightening, performance verification, preventive maintenance, and submission of service report (hardcopy and softcopy) (Per Year) . | 2 | each | 11,376 | ₹22,752 |
| 10 | S/F of 3corex6mm2 cord wire for AC machine. | 13 | mtr | 121 | ₹1,573 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.29 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_612538.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .