Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.3 LAdmitted-Finance | -25.11% | ₹22.3 L | L1 | Admitted-Finance |
| 2 | L2₹22.4 LAdmitted-Finance | -24.70% | ₹22.4 L | L2 | Admitted-Finance |
| 3 | L3₹24.7 LAdmitted-Finance | -17.00% | ₹24.7 L | L3 | Admitted-Finance |
| 4 | L4₹31.3 LAdmitted-Finance | +5.00% | ₹31.3 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical reject |
Tender Value
₹29.8 L
EMD Value
₹59,560
Closing Date
6 Apr 2026, 6:00 pmClosed
EXEUCTIVE OFFICER
NAGAR PALIKA ABUROAD
Construction of Boundary Wall and Devlopment of Park Near Community Center at ward No. 35
2026_DLB_548074_1
NIRMAN/5547-05
Open Tender
Civil Works
ABUROAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO, MDRISL
₹59,560
Yes
17 Apr 2026
25 Mar 2026
7 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 14.4 Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | |||||
| 2Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. 4.10.1 In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. 4.10.1.1 Depth upto 1.5 m | |||||
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :21.1.7 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | |||||
| 4Random rubble masonry with hard stone in foundation and plinth : 25.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) | |||||
| 5Random rubble masonry with hard stone in superstructure above plinth level and upto two stories. In Cement mortar 1:6 (1 cement : 6 coarse sand | |||||
| 6Extra for random rubble masonry with hard stone in : 25.4.1 Square or rectangular pilla | |||||
| 7Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 21.1.2 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | |||||
| 8Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : 32.3.3 1:6 (1 cement : 6 fine/ coarse sand) | |||||
| 9Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 29.26.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | |||||
| 10Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : 32.50.1 Two or more coats on new work | |||||
stage.html
html • 0.05 MB
technical_977240.pdf
techsummary_977240.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_977240.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid