Assistant Soil Conservation Officer Pulwama/Shopia
ASCO PULWAMA
Construction of DRSM and Providing and Layiing of Create wire mesh structures at Drumpathri Nallah Maripal Nallah Katti Nallah Wasturwan Awantipora and Badabath Karmulla Tral
2026_SWCD_322949_2
e-NIT-01 of Pulwama-2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Mentioned in NIT
As per NIT
2 documents required · 2 mandatory
₹800
Account No 0110010200001106 mentioned in NIT
₹32,400
21 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. (Drumpathri Nallah Wasturwan Awantipora :Crates=20Nos, DRSM=90Cum) Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edge
1x16’-0”x5’-0”x 6”+ 1’-0”/2 = 60cft or 1.70cum x20 = 34.00 Cum | 34 | Cum | 467.15 | ₹15,883.1 |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones
16’-0”x4’-0”x4’-0’=256cft or 7.25cum
Deduct 15% voids = 1.08 cum
T= 6.17 cumx20 =123.40 Cum | 123.4 | Cum | 361.65 | ₹44,627.61 |
| 3 | Carriage of stones average lead of 600 m by head load
Qtty. vide (2) = 123.40 cum | 123.4 | Cum | 781.2 | ₹96,400.08 |
| 4 | Supply of Black Annealed Wire Crate made out of 4.00 mm Wire (Wire as per IS: 280) machine woven both ends bent of 100x100 mm mesh size including strengthing with 2mm wire as per required quantity and as per directions of officer-in-charge. including all carriages up to site of work.
1 x 16’-0”x 16’-0”= 256 sft
Lids 2x 4’-0”x4’-0”=32 sft
Total= 288sft @ 220gram / sft = 63.36kg x20=1267.20Kgs | 1,267.2 | Kgs | 94.06 | ₹1,19,192.83 |
| 5 | Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site) in trench with an average minimum depth of 6” throughout the length of foundation,all construction ,collection & carriage of stones necessary lead and lifts (600 mtrs. Avg lead H/L) upto the site of work, Numbering with Synthetic Paint ,excluding cost of stones & bond stones Complete all operations. complete job.
Total= 90cum | 90 | Cum | 1,099 | ₹98,910 |
| 6 | 2. (Maripal Nallah Nallah Wasturwan Awantipora :Crates=20Nos, DRSM=90Cum) Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edge
1x16’-0”x5’-0”x 6”+ 1’-0”/2 = 60cft or 1.70cum x20= 34.00 Cum | 34 | Cum | 467.15 | ₹15,883.1 |
| 7 | Hand-packing stones in wire-crates; excluding cost of crates and stones
16’-0”x4’-0”x4’-0’=256cft or 7.25cum
Deduct 15% voids = 1.08 cum
T= 6.17 cumx20=123.40 Cum | 123.4 | Cum | 361.65 | ₹44,627.61 |
| 8 | Carriage of stones average lead of 600 m by head load
Qtty vide (2) = 123.40 cum | 123.4 | Cum | 781.2 | ₹96,400.08 |
| 9 | Supply of Black Annealed Wire Crate made out of 4.00 mm Wire (Wire as per IS: 280) machine woven both ends bent of 100x100 mm mesh size including strengthing with 2mm wire as per required qunatity and as per directions of officer-in-charge. including all carriages up to site of work.
1x 16’-0”x 16’-0”= 256 sft
Lids 2x 4’-0”x4’-0”=32 sft
Total= 288sft @ 220gram / sft = 63.36kg x20=1267.20Kgs | 1,267.2 | Kgs | 94.06 | ₹1,19,192.83 |
| 10 | Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site) in trench with an average minimum depth of 6” throughout the length of foundation,all construction ,collection & carriage of stones necessary lead and lifts (600 mtrs. Avg lead H/L) upto the site of work, Numbering with Synthetic Paint ,excluding cost of stones & bond stones Complete all operations. Total= 90cum | 90 | Cum | 1,099 | ₹98,910 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_1099208.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .