| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.4 L+₹96.36 (0.01%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SREE SENTHIL AANDAVAR CONSTRUCTION L1 | S ROHIND KUMAR L2 |
|---|---|---|---|---|---|
| 1.00Construction of Cremation Shed, Compound wall for Burial Ground at AD Colony H/O Achankuttapatty | |||||
| 2.00 | Earth work excavation and deposting on bank with initial lead and lift in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil As per SS20 B | 40.68 | Cu.m | 122.26 ₹4,973.54 Lowest | 124.26 ₹5,054.9 |
| 3.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 5.8 | Cu.m | 5,113.82 ₹29,660.16 Lowest | 5,113.82 ₹29,660.16 Lowest |
| 4.00 | Cement Concrete in 1 : 2 : 4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 3.65 | Cu.m | 6,487.04 ₹23,677.7 Lowest | 6,487.04 ₹23,677.7 Lowest |
| 5.00 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations | 28.61 | Sq.m | 1,033 ₹29,554.13 Lowest | 1,033 ₹29,554.13 Lowest |
| 6.00 | Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations | 85.7 | Sq.m | 516.5 ₹44,264.05 Lowest | 516.5 ₹44,264.05 Lowest |
| 7.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod) | 0.8 | M.T | 89,883.5 ₹71,906.8 Lowest | 89,883.5 ₹71,906.8 Lowest |
| 8.00 | R.C.C. 1:1.5 : 3 -using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete | 21.6 | Cu.m | 8,896.47 ₹1,92,163.75 Lowest | 8,896.47 ₹1,92,163.75 Lowest |
| 9.00 | Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete. | 45.2 | Sq.m | 309.06 ₹13,969.51 Lowest | 309.06 ₹13,969.51 Lowest |
| 10.00 | Brick work in cement Mortor 1:5 (One cement and five sand) using country Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 13.81 | Cu.m | 5,913.71 ₹81,668.34 Lowest | 5,913.71 ₹81,668.34 Lowest |
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
20 Sept 2024, 3:00 pmClosed
BDO VP Ayothiyapattnam
BDO VP Ayothiyapattnam
Salem District - Ayothiyapattnam Construction of Cremation Shed, Compound wall for Burial Ground at AD Colony H/O Achankuttapatty in Iyothee thass pandithar Work No.01.
2024_RDTN_483266_1
1773/2024/T1
Open Tender
Civil Works
Item Rate
180 days
BDO VP Ayothiyapattnam
As on below
2 documents required · 2 mandatory
₹0
₹7,500
BDO VP Ayothiyapattnam
15 Aug 2025
12 Sept 2024
20 Sept 2024
12 Sept 2024
20 Sept 2024
12 Sept 2024
12 Sept 2024
Amount
Construction of Cremation Shed, Compound wall for Burial Ground at AD Colony H/O Achankuttapatty
Earth work excavation and deposting on bank with initial lead and lift in hard stiff cllay, stiff black cotton soil, hard fred earth, shale murums, gravel stoney earth, and earth mixed with 50% fair sized boulders, and hard gravelly soil As per SS20 B
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Cement Concrete in 1 : 2 : 4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod)
R.C.C. 1:1.5 : 3 -using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Brick work in cement Mortor 1:5 (One cement and five sand) using country Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete.
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Painting two coats with approved Exterior Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Fire Resistance Clay Brick Work in White clay using Fire Resistance Clay Bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S ROHIND KUMAR (BID ID -1141180)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .