Loading…
Loading…
Tender Value
₹4.2 Cr
EMD Value
₹3.6 L
Closing Date
30 Jan 2026, 12:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
(PH-31)
CETM
24 conditions · 7 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less, where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure -VI B, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Format of Annexure VI B is attached with document tab for reference.
Explanation for above Special Financial Criteria may be followed as mentioned in GCC - 2022 (Page No. 15 to 16).
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Documentation: Certificate from client firm authorising payment received along with percentage penalties imposed, contract wise for completed/ongoing similar works contracts with satisfactory performance.
Definition Of Similar Work: - " Supply, Assembling & Commissioning of tamping unit for CSM/DUO/UNIMAT/3X machine. O R "Overhauling of Tamping unit for CSM/DUO/UNIMAT/3X machine." OR "Manufacturing and 1.1.1 supply of tamping unit spares for CSM/DUO/UNIMAT/3X machine." OR "Supply and assembly of tamping unit of any type of track machines or overhauling of tamping units."
BID CAPACITY: The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI of GCC-2022 (Page No. 35-36). 1.No Technical and Financial credentials are required for tenders having advertised value up to Rs 50 lakh. 2. Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India or entity authorized by RBI to do so for the relevant date or immediately previous date for which rates have been published. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date or immediately previous date for which rates have been published.
Explanation for above Special Technical Criteria and Bid Capacity may be followed as mentioned in GCC - 2022 (Page No. 15 to 16).
Any poor performance report available in the office of TMO, S. E. Rly will be taken into consideration for finalisation of the tender. If any such poor performance report finds against any contractor, the offer of such contractor will be summarily rejected.
21 conditions · 2 needing a document upload
The following documents should be specified for submission alongwith tender: (A) List of Personnel, Organisation available on hand and proposed to be engaged for the subject work. (B) List of plant & Machinery available on hand own and proposed to be inducted own hired to be given separately for the subject work. (C) List of Works completed in the last three financial years giving description of work, organisation for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion or work. Date of actual start, actual completion and final value of contract should also be given. (D) List of works on hand indicating description of work, contract value and approximate value of balance work yet to be done and date of award.
The tenderers whether sole proprietor, a limited company or a partnership firm he/she/they should submit authentic proof in terms and partnership deed, proprietorship documents etc. along with the tender. If he/she/they want to act through agent or individual partners should submit a power of attorney duly stamped and authenticated by Notary Public or by Magistrate in favour of specific person whether he/she/they are partners of the firm or any other person specifically authorising him/her name to submit the tender, sign the agreement, receive money, compromise, settle, relinquish any claims preferred by firm and also sign No Claim Certificate and refer all or any disputes arbitration.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The information should only be submitted in those standard formats.
Rates are inclusive of all license fee, royalty charges etc. legally leviable by State, Central Govt. and / or any other local authority.
In addition to the General condition of contract 2022 revised upto date, special conditions and additional special conditions attached shall also apply.
Sales tax/Business tax, Royalty etc. will be recovered as per extant instruction on the subject.
Note for Commercial compliance:-
In case of items C and D of Commercial Compliance, supportive documents/certificates from the organizations with whom they worked/are working should be enclosed.
Certificate from Private individuals for whom such works are executed/being executed is not acceptable.
Eligibility criteria for works tender in respect of partnership firms:-
In case the tenderer is a partnership firm, the experience, solvency and turn over shall be in the name and style of the firm only.
If the tenderer is a partnership firm, all the partners shall be jointly and severally liable for successful completion of the work and no request for change on the certification of the firm shall be entertained.
JOINT VENTURE will not be permitted for this tender.
Any variation submitted by the contractor on any item of this tender, shall be considered through negotiation, but tendering authority shall have full rights to accept or discard the variation. If rejected, tenderers has to accept the original condition as laid down in original tender.
For standard Financial criteria and Standard Technical criteria Tenderers are requested to submit authenticated certificate along with the tender from officers of government or semi- government/public section undertakings under whom the work has been executed indicating there in the name of work executed, value of works/payment details and period during which completed. Such certificates should have signature and seal of the concerned officer. In the absence of such certificate the tender may not be considered.
BOOKS OF REFERENCE: These tender documents are to be read with S. E. Railway, Engineering Department Standard General Conditions of Contract-2022(Authority: Rly. Bd's letter No. 2022/CE-1/CT/GCC-2022/ Policy, dt: 27.04.2022) as amended by updated correction slips termed GCC 2022. This books are here- in-after called the "Books of Reference" and shall govern this tender as well as the contract resulting from the acceptance from this tender, to the extent that these contents do not conflict with the contains of the various chapters of these documents.
A copy of Documents against eligibility criteria must be submitted along with the E-tender. Not any documents against the same will be entertained in the office of Chief Engineer/TM/GRC or anywhere else at any time. Tender will be decided purely on the basis of documents available/attached with the E-tender irrespective of whether tenderer is working contractor or new. However Railway may ask clarification with respect to document available/attached with the E-tender, if required.
Price variation Clause PVC shall be applicable as per GCC-2022 with up-to-date correction slips, if any.
SUPPLY, INSTALLATION, COMMISSIONING, AND MAINTENANCE DURING THE WARRANTY PERIOD OF NEW TAMPING UNIT OF MFI /MPT, PCTM & DYNAMIC TAMPING EXPRESS MACHINE.
TM-25-W-TU-MFI-PCTM-DTE-2~SER
TM-25-W-TU-MFI-PCTM-DTE-2
Open
Works - General
180 Days
Unknown (Unspecified Location)
₹0
₹3.6 L
30 Jan 2026
8 Jan 2026
16 Jan 2026
8 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | Above/ Below/P ar | ||
| Supply, Installation/fixing, commissioning and maintaining during warranty period of New set of Tamping Unit of Plasser make MFI/MPT Machine. One set consisting of LHS outer TampingUnit as per Plasser Part no.CA15.500LI - 01no., LHS Inner Tamping Unit asper Plasser Part no. CA21.6600RE- 01 no., RHS inner Tamping Unit as per Plasser Part no.CA21.6600LI - 01no. and RHS outer Tamping Unit as per Plasser Part no.CA15.500RE - 01no. withfull assembly including new spares as per Annexure-AI . Along with Auto greasing system for Tamping Unit of MFI machines with set of Adopter and Greasing Pipe, SSV Divider valve, without Atomizer and Labour charges for complete assembling of spares into tamping unit ,installation and commissioning of new set of tamping units of MFI on machine and along with transportation of new Tamping Bank set from Firm's place to ZTMD/KGP (01 set = 04 Units). WARRANTY :- 1500 Turnouts or 18 months from the date of commissioning of tamping unit or 2 years from the date of supply of tamping unit, whichever is earlier. | Breakup for | Item | details. | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .