Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.5 L+₹990 (0.22%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-CDR Pledged to XEN PWD Poonch. |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
15 Jul 2026, 6:55 pmClosed
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
Please refer to BOQ
2026_PWDJK_315004_1
e-NIT No 22 of 2026-27 Dated 07-07-2026
Open Tender
Civil Works
Percentage
60 days
MENDHAR
Please refer to Technical Bid as per conditions of e-NIT.
2 documents required · 2 mandatory
₹200
Sub Treasurey Mendhar
₹9,000
14 Aug 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 1 All kinds of soil : | 9.57 | Cum | 256.85 | ₹2,458.05 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.77 | Cum | 4,826.5 | ₹18,195.91 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 19.89 | Cum | 5,733.6 | ₹1,14,041.3 |
| 4 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 20.75 | cum | 6,591.25 | ₹1,36,768.44 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 15.6 | sqm | 286.35 | ₹4,467.06 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs andsteps etc. | 110 | sqm | 628.95 | ₹69,184.5 |
| 7 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 6.23 | cum | 2,793.8 | ₹17,405.37 |
| 8 | Dumping stone including cost of stones. in Horizontal on level | 66.09 | CUM | 937.9 | ₹61,987.69 |
| 9 | Carriage of material by mechanical transport including loading/unloading and stacking complete.sand lead upto 50 kms avg | 20.45 | cum | 741.14 | ₹15,156.31 |
| 10 | Carriage of material by mechanical transport including loading/unloading and stacking complete.Stone agg lead upto 11 kms avg | 35.38 | cum | 292.13 | ₹10,335.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1020415.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .