Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.5 CrAccepted-AOC | L1 | Accepted-AOC Being lowest and reasonable | |
| 2 | L2₹29.2 Cr+₹71.2 L (2.50%)Rejected-AOC | L2 | Rejected-AOC Not lowest | |
| 3 | L3₹29.6 Cr+₹1.1 Cr (3.84%)Rejected-AOC 135 CHAKRANA TIWARI CHAKA NAINI PRAYAGRAJ 211008 UTTAR PRADESH | PRAYAGRAJ | UTTAR PRADESH | 211008 | L3 | Rejected-AOC Not lowest | |
| 4 | L4₹30.6 Cr+₹2.1 Cr (7.44%)Rejected-AOC ATHWAJAN SRINAGAR 191101 JAMMU AND KASHMIR | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 191101 | L4 | Rejected-AOC Not lowest | |
| 5 | L5₹30.9 Cr+₹2.4 Cr (8.41%)Rejected-AOC CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L5 | Rejected-AOC Not lowest |
| Sl No | Description | Qty | Unit | M/S SHAH CONSTRUCTION L7 | vijay builders L3 | M/S ABDUL SALAM MIR CONSTR CO PVT. LTD L1 | M M SHAWL Engineers and contractors pvt ltd L5 | mirco builders L4 | SHAH AND SONS L6 | Jk Engineering Construction Co. L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Note: (i) Please refer Schedule 'A' Notes given in tender documents. (ii) The Schedule 'A' Part-XIV is not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col. 5 signifies this fact only. | ||||||||||
| 2.00LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | ||||||||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 30,00,00,000 ₹30,00,00,000 | 24,34,35,052.41 ₹24,34,35,052.41 | 22,20,77,600 ₹22,20,77,600 Lowest | 25,60,00,000 ₹25,60,00,000 | 24,84,51,869 ₹24,84,51,869 | 25,88,88,000 ₹25,88,88,000 | 24,87,00,000 ₹24,87,00,000 |
| 2.02 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 22,00,000 ₹22,00,000 | 16,95,822.93 ₹16,95,822.93 | 14,41,448 ₹14,41,448 Lowest | 15,10,000 ₹15,10,000 | 23,74,152.1 ₹23,74,152.1 | 19,75,000 ₹19,75,000 | 15,00,000 ₹15,00,000 |
| 2.03 | Lump sum price worked out by the contractor for ROAD, PATH AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 1,95,00,000 ₹1,95,00,000 | 1,76,58,733.52 ₹1,76,58,733.52 | 1,30,52,107 ₹1,30,52,107 | 1,65,00,000 ₹1,65,00,000 | 1,67,37,408.29 ₹1,67,37,408.29 | 1,69,55,000 ₹1,69,55,000 | 1,20,00,000 ₹1,20,00,000 Lowest |
| 2.04 | Lump sum price worked out by the contractor for PCC ROAD WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 75,50,000 ₹75,50,000 | 62,36,222.43 ₹62,36,222.43 | 68,92,666 ₹68,92,666 | 55,00,000 ₹55,00,000 Lowest | 70,89,600.23 ₹70,89,600.23 | 69,75,000 ₹69,75,000 | 58,60,000 ₹58,60,000 |
| 2.05 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 25,50,000 ₹25,50,000 | 20,81,699.15 ₹20,81,699.15 | 17,69,444 ₹17,69,444 Lowest | 20,50,000 ₹20,50,000 | 22,48,235.08 ₹22,48,235.08 | 25,15,000 ₹25,15,000 | 19,41,000 ₹19,41,000 |
| 2.06 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 10,00,000 ₹10,00,000 | 8,97,139.63 ₹8,97,139.63 | 6,93,243 ₹6,93,243 Lowest | 9,20,000 ₹9,20,000 | 8,97,139.63 ₹8,97,139.63 | 10,15,000 ₹10,15,000 | 7,63,600 ₹7,63,600 |
| 2.07 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-VII. | 1 | Each | 30,00,000 ₹30,00,000 | 28,74,733.45 ₹28,74,733.45 | 21,56,049 ₹21,56,049 Lowest | 22,92,000 ₹22,92,000 | 30,04,096.46 ₹30,04,096.46 | 28,25,000 ₹28,25,000 | 21,87,000 ₹21,87,000 |
| 2.08 | Lump sum price worked out by the contractor for LIGHTENING PROTECTION WORKS carried forward from Pre-Priced Schedule 'A' Part-VIII. | 1 | Each | 12,00,000 ₹12,00,000 | 15,18,917.62 ₹15,18,917.62 | 8,60,719 ₹8,60,719 Lowest | 10,50,000 ₹10,50,000 | 15,18,917.62 ₹15,18,917.62 | 13,45,000 ₹13,45,000 | 9,74,000 ₹9,74,000 |
Tender Value
₹33.7 Cr
EMD Value
₹15 L
Closing Date
4 Nov 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HQ CE 31 Zone
HQ CE 31 Zone C/o 56 APO
CONSTRUCTION OF CERTAIN ADDITIONAL TECH ACCN AND OTHER ALLIED INFRASTRUCTUREAT KHUNDRU UNDER GE 861 EWS
2025_MES_733156_1
800203
Open Tender
Civil Works
Lump-sum
725 days
khundru
Please refer Tender documents.
15 documents required · 15 mandatory
₹3,000
GE 861 EWS
₹15 L
19 Jan 2026
29 Sept 2025
7 Nov 2025
29 Sept 2025
4 Nov 2025
28 Oct 2025
29 Sept 2025 - 20 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | |||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 25,19,98,470.42 | ₹25,19,98,470.42 |
| 2.02 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 9,74,676.69 | ₹9,74,676.69 |
| 2.03 | Lump sum price worked out by the contractor for ROAD, PATH AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 1,34,65,292.05 | ₹1,34,65,292.05 |
| 2.04 | Lump sum price worked out by the contractor for PCC ROAD WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 65,64,444.66 | ₹65,64,444.66 |
| 2.05 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 20,81,699.15 | ₹20,81,699.15 |
| 2.06 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 8,28,701.48 | ₹8,28,701.48 |
| 2.07 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS carried forward from Pre-Priced Schedule 'A' Part-VII. | 1 | Each | 17,36,792 | ₹17,36,792 |
| 2.08 | Lump sum price worked out by the contractor for LIGHTENING PROTECTION WORKS carried forward from Pre-Priced Schedule 'A' Part-VIII. | 1 | Each | 10,12,611.75 | ₹10,12,611.75 |
| 2.09 | Lump sum price worked out by the contractor for PROTECTIVE WORKS carried forward from Pre-Priced Schedule 'A' Part-IX. | 1 | Each | 57,47,851.72 | ₹57,47,851.72 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_820938.xls
BOQ • 2.96 MB
Tenderfullmerged.pdf
Tender Documents • 2.56 MB
CESZ.pdf
Tender Documents • 2.76 MB
DrgsDeficient09Oct.pdf
PDF • 10.58 MB
iglookhundru2drgscompressed.pdf
PDF • 7.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .