| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC SCRPI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹20.2 L+₹39,234.74 (1.98%)Rejected-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC Recommendation | |
| 3 | L3₹21.2 L+₹1.4 L (7.00%)Rejected-Finance S O PO PADAVESWAR PADAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713346 | PADAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC Recommendation |
Tender Value
₹19.8 L
EMD Value
₹24,800
Closing Date
28 Feb 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Transportation installation and commissioning of 2 nos of 1000 GPM 300 mtr head pump with 3.3 Kv HT electricals in RVIIA seam of Shyamsundarpur Colliery under Bankola Area
2025_ECL_329518_1
ECL/GM/BA/E TENDER/24-25/ENM/448 Dt 18.02.202
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹24,800
31 Mar 2025
18 Feb 2025
1 Mar 2025
18 Feb 2025
28 Feb 2025
18 Feb 2025
18 Feb 2025 - 22 Feb 2025
Amount
Item Description/ Heading
MLA-6, 200x225, 3.3kV, 370kW Centrifugal pump set with electrical Collection of trolleys from CM section and lifting the same to surface for loading of pump sets from surface workshop
Loading of pump, HT electric motor, bed plate, HT FLP starter on trolleys and transporting the same to Pit top for lowering
Lowering of 1 set centrifugal pump, base plate, electric motor (3.3kV, 500HP), star delta starter pit top to pit bottom of pit no.3 by dismantling and re-assemblíng of cages.
Lifting of 8" dia, 10ft.long- 24 nos Flange fitted M.S.pipe from surface workshop to pit top and lowering the same to pit bottom by dismantling the cage roof top.
Lifting of 6" dia, 20 ft.long- 64nos M.S.pipe from surface workshop to pit top and lowering the same to pit bottom by dismantling the cage roof top.
Transportation of centrifugal pump, base plate, electric motor (3.3kv, 500HP), 3.3kV star delta starter from pit bottom to installation site through track line upto 18L/2WD and manually upto 18L/1ED in RVIIA seam.
Transportation of 8"-24nos and 6" pipe - 64 nos. from pit bottom to RVIIA seam to installation site through track line upto 18L/2WD and manually upto 18L/1ED for suction and delivery line
Installation of bed plate at 18L/1ED, placing the MLA-6 pump and 3.3kV, 500HP motor manually on bed plate, aligning the same.
Installation of suction 8" suction pipe and foot valve for suction range of appx. 35mtr.
Laying and joining of 6" Delivery bend in pump and complete 6' delivery range from pump site, i.e. 18L/1ED to bore hole at 15L/3ED (appx length 180mtr.)
Trransportation of 95sq.mm. power cable from 20L/9ED substation and laying from 14L/4WD substation 17L/1ED in RVIIA seam
Transportation of 3.3kv, 400A FLP breaker from 14L/4WD substation to 17L/1ED pump site in RVIIA seam
Making of base plate for the pump consisting of joint and fabricating the same as per pump and motor dimensions at workshop.
Testing and commissioning for leakage and rectification of delivery and suction range.
Complete lowering of pump set with electricals and reassembling of suction and delivery line as per reduction in water level. 4times lowering- 2 shift/lowering
Pluro-llA-8, 200x225, 3.3kV, 300kW Centrifugal pump set with electrical Collection of trolleys from CM section and lifting the same to surface for loading of pump sets from surface workshop
Loading of pump, HT electric motor, bed plate, HT FLP starter on trolleys and transporting the same to Pit top for lowering
Lowering of 1 set centrifugal pump, base plate, electric motor (3.3kv, 410HP), star delta starter pit top to pit bottom of pit no.3 by dismantling and re-assembling of cages.
Transportation of centrifugal pump, base plate, electric motor (3.3kv, 410HP), 3.3kV star delta starter from pit bottom to installation site through track line upto 18L/4WD and manually upto 18L/1WD in RVIIA seam.
Installation of bed plate at 18L/1WD, placing the Pluro-IIA pump and 3.3kV, 410HP motor manually on bed plate, aligning the same.
Installation of suction 8" suction pipe and foot valve for suction range of appx. 35mtr.
Laying and joining of 6" Delivery bend in pump and complete 6" delivery range from pump site, i.e. 18L/1WD to bore hole at 15L/3ED (appx length 245mtr.)
Transportation of 95sq.mm. power cable from 20L/9ED substation and laying from 14L/4WD substation 17L/1ED in RVllA seam
Transportation of 3.3kV, 400A FLP breaker from 14L/4WD substation to 17L/2WD pump site in RVIIA seam
Making of base plate for the pump consisting of joist and fabricating the same as per pump and motor dimensions at workshop.
Testing and commissioning for leakage and rectification of delivery and suction range.
Complete lowering of pump set with electricals and reassembling of suction and delivery line as per reduction in water level. 4times lowering- 2shift/lowering
Cost for MS nut nolt 5/8 x 3 inch
cost for MS nut bolt 5/8 x 2.5 inch
Cost for 6 inch seamless 12mm thick
Total impact of GST for the purpose of CTC
SWAPAN KUMAR AKHULI (BID ID -1130982)
PRASHANTA KABIRAJ (BID ID -1131899)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .