Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.0 LRejected-AOC | ₹5.0 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M.Gunasekaran L2 | R. Valarmathi L1 |
|---|---|---|---|---|---|
| 1.01 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 488.4 | sqm | 8 ₹3,907.20 | 6.3 ₹3,076.92 |
| 1.02 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 36.63 | Cum | 108 ₹3,956.04 | 106.2 ₹3,890.11 |
| 1.03 | Picking the existing metal surface 7.5 cm thich removing the picked up stuff to the sides, Collecting all useful metal levelling and sectioning to camper power roll consolidation by power roller etc as per the standard specification | 407 | sqm | 28 ₹11,396 | 26.3 ₹10,704.10 |
| 1.04 | Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST. | 1,221 | sqm | 32 ₹39,072 | 30.9 ₹37,728.90 |
| 1.05 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete | 1,221 | sqm | 288 ₹3.5 L | 287.4 ₹3.5 L |
| 1.06Collection and supply of Red gravel including cost and convenyance and stecking at road side to deptl guage for taking precentand filling to the standard specification | |||||
| 1.07 | 0/0-0/500 | 24.42 | Cum | 428 ₹10,451.76 | 426.2 ₹10,407.80 |
| 1.08 | Provision for Name Board | 1 | No | 1,002 ₹1,002 | 1,000 ₹1,000 |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST | 75,857.94 ₹75,857.94 | 75,190.18 ₹75,190.18 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
23 Jan 2026, 3:00 pmClosed
Block Development Office BP
Panchayat Union Office, Andipatti
Strengthening of Road From T.Sedapatti Burial ground in T.Rajagobalanpatti Panchayat under MLACDs 2025-2026
2026_RDTN_644679_2
MLACDS 2025-26 23.01.2026
Open Tender
Civil Works - Others
Andipatti
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
31 Jan 2026
19 Jan 2026
23 Jan 2026
19 Jan 2026
23 Jan 2026
19 Jan 2026
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the existing metal surface 7.5 cm thich removing the picked up stuff to the sides, Collecting all useful metal levelling and sectioning to camper power roll consolidation by power roller etc as per the standard specification
Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Collection and supply of Red gravel including cost and convenyance and stecking at road side to deptl guage for taking precentand filling to the standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_772553.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid