Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-Finance 1 21 B8 KHADAR MEERAN NAGAR THERMAL NAGAR TUTICORIN | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹7.7 L+₹43,425 (5.99%)Accepted-Finance 4 91 C BYPASS ROAD PUDUKOTTAI THOOTHUKUDI 628 103 | THOOTHUKUDI | THOOTHUKUDI | TAMIL NADU | 628103 | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
Refer Docs
EMD Value
₹6,200
Closing Date
2 Jun 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE C TTPS TTN
O/o SE Civil TTPS TTN 4
Forming protection bund by raising the East side bund of secondary pond for a length of 200m from Ch.210m to 410m from main spillway towards cross bund in ash dyke at TTPS
2022_EB_233005_1
CE/SE/Civil/TTPS/61/2022-2023
Open Tender
Civil Works - Others
Works
120 days
TTPS
As per tender Specification
2 documents required · 2 mandatory
₹0
₹6,200
Yes
4 Jun 2022
19 May 2022
3 Jun 2022
19 May 2022
2 Jun 2022
19 May 2022
120 days
Amount
Forming and raising the existing bund with approved well gravel in layer of 200mm thick compacting each layer with power roller and consolidation to achieve 95% proctor density forming the bund with an allowance of 300mm on both sides in each layer such that section is to be formed only from the roller compacted portion including trimming, sectioning, sizing to the required line to have firm and compact level embankment including cost of all material, labour, lead, lift etc., complete and as directed by the Engineer at site.
Forming and raising the existing bund with approved red gravel in layer of 200mm thick compacting each layer with power roller and consolidation to achieve 95% proctor density forming the bund with an allowance of 300mm on both sides in each layer such that section is to be formed only from the roller compacted portion including trimming, sectioning, sizing to the required line to have firm and compact level embankment including cost of all material, labour, lead, lift etc., complete and as directed by the Engineer at site.
IMMANUEL AND CO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .