Loading…
Loading…
Tender Value
₹16.7 L
EMD Value
₹41,843
Closing Date
18 Apr 2026, 10:30 pmClosed
Karnataka Forest Department
ACF SF CHIKKODI SUB DIVISION
Raising of plantation,Maintenance of One year and Fourth year plantation of Hukkeri and Gokak ranges Chikkodi sub division under RRP Head
KFD/2026-27/OW/WORK_INDENT35723
KFD/2026-27/OW/WORK_INDENT35723
Open
Other Works
Two Tender Document System(Two Cover)
KFD ACF Social Forestry Sub Division Office Chikkodi
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
Upload all documents as specified in 3. Qualification of the Tenderer(3.1 to 3.9 )given in Tender Document page No 05
₹500
₹41,843
3 Apr 2026
3 Apr 2026
20 Apr 2026
10 Apr 2026
MODEL -14 - LINEAR PLANTATION
DATASHEET - 70 - Raising of Plantation for the year 2026-27
300 Pits size - 1 M3 14"x20" - 330 pbs
Sl. No. CSSR Item No. Particulars of the Work Qnty. Rate Per Amount
1 32 (c) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% of the pit with the excavated soil, duly breaking the clods & formation of saucer shaped mound on the lower side of the pit 225 Cmtr 32.01 Cmtr 7202.25
2 23 Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 330 Pbs 13202.46 1000 4356.81
(f) Seedlings raised in 14" x 20" size bags
3 24 (f) Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.
(iii) Seedlings raised in 14"x20" size bags: Distance from 21 to 30 Kms. 330 Pbs 12131.45 1000 4003.38
4 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (14"x20") - Flexi 330 pbs 1,284.50 1000 423.89
5 32(f)(i) Conveyance of tall seedlings raised in polythen / HDPE bags of size 14" x 20" from the dumping point to the planting site near each pit on head-load, fixing the more than 2.5 mtr. long supporting stake firmly in the pit, planting the tall seedling in the pit tying the seedling to the supporting stake at 3 points (excluding cost of supporting stake) 330 Plant 71.26 each 23515.80
6 RQ Purchase of NPK / DAP (100+100=200 gms per plant) 2 times (Flexi) 60 KG 35 KG 2100.00
7 38 (e) Application of chemical fertilizer around the plants about 15 cm. away in a furrow duly covering with soil (excluding the cost of fertilizer) in two equal split doses.* (Flexi) 300 Plants 570.69 1000 342.41
8 29 (j) Saucer Bharav: Scraping out of grass and weeds to a radius of 50 cms around the plant, earthening up of soil in the form of a semi-circular slanting saucer shape slope, loosening of boulders if any with soil by using pickaxe and arranging the loosened boulders and soil in semi-circular fashion at the lower side of the plant (Dimension 80 cms diameter and 25 cms depth at deepest point) 300 Plants 15554.2 1000 4666.26
9 32 (j) First Weeding around the plants (pit) to radius of 60 cm 300 Plants 1783.92 1000 535.18
10 32 (o) Scraping of grass and other growth around the plant to a radius of 1 m. 300 plants 12296.01 1000 3688.80
11 32 (m) Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm. so as to loosen the soil around the plants (pits only) 300 plants 7136.29 1000 2140.89
12 41(j)(ii) Watering to the seedlings along roadside and in the city limits at 50 liters/plants 6 times (One watering if planted in May, 5 watering in Jan, Feb & March) (Nos are Flexi). 300 plants 54.7 Each 98460.00
13 wage Protection of plantation as per the standard norms (for 3 km as a unit during the year and pro-rata for different extent for the actual period) 274 days 603.9 3 km 55156.20
14 RQ Procurement & transportation of 10' feet length & 10-15 cm girth Marihala Bamboo / wooden Stakes / Debarked Eucalyptus stakes. Each of the sticks is to be dipped in hot liquid coal tar to a minimum length of 5 feet. 300 plants 50.45 each 15135.00
15 32(g) Cutting & collection of Prosopis juliflora (PJ) branches loading the same into the lorry & unloading at the planting site (10 branches per tall plant) 300 Plant 42.88 each 12864.00
16 32(h) Conveyance of P.J. branches to individual pit, tying P.J.branches around the supporting stake properly covering the tall plant with P.J.thorny branches to a height of more than 2m and tying the P.J.branches with G.I.wire at 3 places (10 P.J.branches to be used for tying the fall seedling). Alternately phoenix leaves could be used depending on availability. 300 Plant 50.12 each 15036.00
17 Sub estimate Maintenance of 14"x20 seedlings. 330 Pbs 13.5 Each 4455.00
18 Raising of 14"x20" pb seedlings. (casuality replacement upto 10%) 30 Pbs 105.1 Each 3153.00
19 Miscellaneous, Unforeseen & rounding off 65.13
Total 257300.00
Grand Total: 266305.50
Deputy Conservator of Forests,
Social Forestry Division,Belagavi.
MODEL -14 - LINEAR PLANTATION
DATASHEET - 71 Maintenance of one Year old plantations for the year 2025-26
For 300 plants (unit/ha.) 14"x20"
Sl. No. CSSR Item No. Particulars of Works Qty. Rate Per Amount
1 41(a) Re-opening of pits of size 0.75mx0.75mx0.75m for replacement of casualities - 30 pits 12.656 Cum 85.75 Cum 1,085.25
2 41(b) Refilling of pits, cutting of edge of the pit on the lower side and refilling 75% of the pit with the excavated soil duly breaking the clods and formation of saucer shaped mound on the lower side of the pit size 1m x 1m x 1m. 30 Pits 14.49 Pits 434.70
3 23(f) Loading of polythene / HDPE bagged seedlings into vehicle at the nursery site and unloading at the site nearest to the planting site - 30 pbs 13,202.46 1000 396.07
Seedlings raised in 14" x 20" size bags
4 24(f) Transportation of polythene / HDPE bagged seedlings in vehicle from nursery site to planting site.
(iii) Distance from 21 to 30 Km 30 pbs 12,131.45 1000 363.94
5 26(d) Watering polythene / HDPE bagged seedlings at planting site by dipping in water (including carrying of water) only in dry conditions of weather. (14"x20") - Flexi 30 pbs 1,284.50 1000 38.53
6 41 (c) Conveyance of tall seedlings raised in HDPE bags of size 14"x20" from the dumping point to the planting site near each pit on head load, fixing the supporting stake firmly in the pit, planting the tall seedling in the pit tying the seedling to the supporting stake at 3 points (excluding cost of supporting stake) (14"x20" planting ) 30 Plant 71.26 each 2,137.80
7 RQ Procurement & transportation of 10' feet length & 10-15 cm girth Marihala Bamboo / wooden Stakes / Debarked Eucalyptus stakes. Each of the sticks is to be dipped in hot liquid coal tar to a minimum length of 5 feet. 30 plants 50.45 each 1,513.50
8 41 (d) Cutting & collection of Prosopis juliflora (PJ) branches loading the same into the lorry & unloading at the planting site (8-10 branches per tall plant) 30 Plant 42.88 each 1,286.40
9 41 (e) Conveyance of P.J. branches to individual pit, tying P.J.branches around the supporting stake properly covering the tall plant with P.J.thorny branches to a height of more than 2m and tying the P.J.branches with G.I.wire at 3 places (10 P.J.branches to be used for tying the fall seedling). Alternately phoenix leaves could be used depending on availability. 30 Plant 50.12 each 1,503.60
10 32 (j) First Weeding around the plants (pit) to radius of 60 cm 300 Plants 1,783.92 1000 535.18
11 41(h) Scraping of grass and other growth around the tall plant to a radius of 60 cm (Pits) 300 plants 4,424.78 1000 1,327.43
12 41(i) Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm. so as to loosen the soil around the plants (pits only). 300 plants 7,136.29 1000 2,140.89
13 41(j)(ii) Watering to the seedlings along roadside and in the city limits at 50 liters/plants - 3 times (@ only 15 days April & May) (Nos are Flexi) 300 plants 54.70 Each 49,230.00
14 Wage Protection of plantation as per the standard norms ( for 3 km as a unit during the year and pro-rata for different extent for the actual period) 365 days 603.90 days 73,474.50
15 Sub -estimate Maintenance of 14"x20" pb seedlings. 30 Pbs 13.50 each 405.00
16 Miscellaneous, Unforeseen & rounding off 27.20
Grand Total: 140,656.50
Deputy Conservator of Forests,
Social Forestry Division,Belagavi.
MODEL -14 - LINEAR PLANTATION
DATA SHEET -72 - MAINTENANCE OF 2 to 4 th YEAR OLD PLANTATIONS for the year 2026-27
For 300 plants (unit/ha.)
Sl. No. CSSR Item No. Particulars of Works Qty. Rate Per Amount
1 41(f) First Weeding around the plants (pit) to radius of 60 cm (Aug) 300 Plants 1,783.92 1000 535.18
2 41(h) Scraping of grass and other growth around the tall plant to a radius of 60 cm (Pits) 300 plants 4,424.78 1000 1,327.43
3 41(i) Hoeing & soil working with pickaxe around the plant to a depth of 15cm. & to a radius of 60 cm. so as to loosen the soil around the plants (pits only). 300 pits 7136.29 1000 2,140.89
4 wage Protection of plantation as per the standard norms (for 3 km as a unit during the year and pro-rata for different extent for the actual period) 365 days 3 Kms 603.90 day 73,474.50
5 Misc & documentation 22.000
Total: 77,500.00
Grand Total: 80,212.50
Deputy Conservator of Forests,
Social Forestry Division,Belagavi.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
DATA SHEETS 2026-27.xlsx
Instructions to Tenderers • 0.04 MB
Chikkodi TENDER RRP FUND TENDER.doc
Tender Document • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .