Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC SUGANTHAM BUILDING 24 8 5 PALLIYADI KANYAKUMARI DIST PIN 629 169 | PALLIYADI | KANYAKUMARI | TAMIL NADU | 629169 | ₹2.7 L | L1 | Accepted-AOC lowest value |
| Sl No | Description | Qty | Unit | M/s. Bafflin Groups L1 |
|---|---|---|---|---|
| 1.00 | Excavation of pole pit (1.25m * 0.6m * 1.83 m) 9/9.14 mtr length by using JCB/Manual in Normal ground | 7 | Per pit | 5,250 ₹6,195 Lowest |
| 2.00 | Erection of pole 9 / 9.14 mtr. Length by using crane / Manual in Normal ground | 7 | Per pole | 5,600 ₹6,608 Lowest |
| 3.00 | Excavation of pole pit (1.25m * 0.6 m * 2.19m ) steel joist 36' and above length in Normal ground | 3 | Per pit | 2,550 ₹3,009 Lowest |
| 4.00 | Erection of pole steel joist 36' and above length in Normal ground | 3 | Per pole | 3,000 ₹3,540 Lowest |
| 5.00 | Transporting of 9 mtr pole from road side to pole pit upto 2 KM | 7 | Each pole | 5,600 ₹6,608 Lowest |
| 6.00 | Transporting of upto RSJ 36' pole from road side to pole pit upto 2 KM | 3 | Each pole | 2,400 ₹2,832 Lowest |
| 7.00 | Loading and unloading 9 mtr. PSC pole / Square pole | 7 | Each | 4,200 ₹4,956 Lowest |
| 8.00 | Loading and unloading Upto 36' RSJ pole | 3 | Each | 1,800 ₹2,124 Lowest |
| 9.00 | Loading and unloading of Distribution Transformer below 250 KVA | 2 | Each | 1,200 ₹1,416 Lowest |
| 10.00 | Loading and unloading of Line materials | 9 | MT | 3,600 ₹4,248 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,741
Closing Date
29 Jun 2026, 2:00 pmClosed
o/o the EE/D/Ngl
o/o the EE/D/Ngl
Improvement estimate for replacement of deteriorated 1
2026_EB_681197_1
EE/D/NGL/ET .24/dt.16.06.2026
Open Tender
Electrical Works
Works
90 days
EE/NGL
As per specified
3 documents required · 3 mandatory
₹0
₹2,741
Yes
9 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
16 Jun 2026 - 29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of pole pit (1.25m * 0.6m * 1.83 m) 9/9.14 mtr length by using JCB/Manual in Normal ground | 7 | Per pit | - | - |
| 2 | Erection of pole 9 / 9.14 mtr. Length by using crane / Manual in Normal ground | 7 | Per pole | - | - |
| 3 | Excavation of pole pit (1.25m * 0.6 m * 2.19m ) steel joist 36' and above length in Normal ground | 3 | Per pit | - | - |
| 4 | Erection of pole steel joist 36' and above length in Normal ground | 3 | Per pole | - | - |
| 5 | Transporting of 9 mtr pole from road side to pole pit upto 2 KM | 7 | Each pole | - | - |
| 6 | Transporting of upto RSJ 36' pole from road side to pole pit upto 2 KM | 3 | Each pole | - | - |
| 7 | Loading and unloading 9 mtr. PSC pole / Square pole | 7 | Each | 1 | ₹7 |
| 8 | Loading and unloading Upto 36' RSJ pole | 3 | Each | 2 | ₹6 |
| 9 | Loading and unloading of Distribution Transformer below 250 KVA | 2 | Each | 3 | ₹6 |
| 10 | Loading and unloading of Line materials | 9 | MT | 4 | ₹36 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_818618.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].