| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.3 LAccepted-Finance | L1 | Accepted-Finance LOW RATE | |
| 2 | L2₹37.4 L+₹1.1 L (2.91%)Rejected-Finance MOHALLA SUBHASHNAGAR DEOKALI ROAD DISTT LAKHIMPUR KHERI | LAKHIMPUR KHERI | LAKHIMPUR KHERI | UTTAR PRADESH | L2 | Rejected-Finance HIGH RATE | |
| 3 | L3₹39.5 L+₹3.2 L (8.78%)Rejected-Finance | L3 | Rejected-Finance HIGH RATE | |
| 4 | L4₹40.4 L+₹4.1 L (11.3%)Rejected-Finance | L4 | Rejected-Finance HIGH RATE | |
| 5 | Rejected-Technical C 33 58 C 2A 1 SIGRA CHITTUPUR VARANASI VARANASI UTTAR PRADESH 221010 | VARANASI | UTTAR PRADESH | 221010 | - | Rejected-Technical NOT OK |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
15 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER EDC MIRZAPUR
SUPERINTENDING ENGINEER EDC MIRZAPUR
supply of De-centralized materials and works for increasing capacity and installation of TF under Business Plan 2025-26, EDD-KACHHAWA
2025_PVVNV_1067163_1
20/EDC(M)/2025-26
Open Tender
Electrical Works
Lump-sum
90 days
SUPERINTENDING ENGINEER EDC MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Executive Engineer(A)
₹46,000
19 Sept 2025
21 Aug 2025
16 Sept 2025
21 Aug 2025
15 Sept 2025
21 Aug 2025
Amount
Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms.
Stone pad 300x300x75 mm
X-arms holding clamps with bolts & nuts
F-bracket with bolts & nuts
Top, Dropper channel clamp with bolts & nuts for ST Pole
Top, Dropper, T-off channel clamp with bolts & nuts for PCC Pole
P.G clamps for weasel conductor
Danger board with clamp & bolts
Dead end clamp for pole/bracket with nuts & bolts
Eye- Hook
Suspension clamp with nuts & bolts
J Hook
All. Binding wire 6 mm
1x35 sq mm AC cable (XLPE)
Three phase Distribution Box
Three phase Distribution Box Clamp (LS)
E-bracket with nuts & bolts
Copper L-Piece 50x225x10 mm
Copper L-Piece 62x225x12 mm
All lugs 240 mm2
All lugs 120 mm2
All lugs 70 mm2
Stay clamp with nut & bolts for ST Pole
Stay clamp with nut & bolts for PCC Pole
Stay Insulator
Cartage of following materials from ESC, Mirzapur Provided by Department to work site including loading & unloading charge.
ST Poles 11 mtr long
PCC Poles 8.5 mtr long
All Line materials with ACSR Weasel Conductor
Arial Bunch Cable 3x50+1x35+1x16 mm2
Arial Bunch Cable 3x95+1x70+1x16 mm2
Transformer 250 KVA
Transformer 100 KVA
Transformer 63 KVA
Transformer 25 KVA
Erection
Erection of single support ST/PCC Pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms.
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Earthing of Poles as per RESSPO norms
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering as per RESSPO norms
Laying, Streaching of Arial Bunch Cable size 3x50+1x35+1x16 mm2/ 3x95+1x70+1x16 mm2 as per RESSPO norms
Erection of Sectional Double Pole Structure of ST Pole for distribution T/F, including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Erection of Sectional Double PCC Pole Structure for distribution T/F with the help of one pole already erected including digging of pit, fitting of all accessories, earthing of Pole, back filling of earth, grouting of each pole & stay sets & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Construction of Transformer plinth for 250 KVA Transformer of 2x2x1.5 mtr. Including the work of excavation for foundation of plinth plastering of walls and finishing including cost of all materials.
Well type earthing of 250 KVA Transformer by using B class G.I. pipe of 1.5 " dia and making hand pipe type earth boring IInd strata of water or 60 ft. whichever is deeper about 6" of G.I. pipe shall remain above ground level 2 No. G.I. earth clamp shall also be welded to the portion of pipe which is above the ground level. Through this G.I. Clamp and G.I. Strip 30x5mm duly galvanized shall be connected with nut & bolts. Every DT shall have 2 such earthing, One earthing for T/F neutral and second earthing for T/F body. All requred materials shall by provided by the contractor.
Fencing of T/F with M.S. Square mesh welded/fixed on M.S. Angle of size 65x65x6 mm with gate hinges & shutter assembly, of over all size 3x3x2.5 mtr as per drawing including cost of all materials.
Mounting of 25 KVA Transformer as per RESSPO norms
Mounting of 63 KVA Transformer as per RESSPO norms
Mounting of 100 KVA Transformer as per RESSPO norms
Mounting of 250 KVA Transformer as per RESSPO norms
Cartage of received back 10 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 16 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 25 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 63 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
Cartage of received back 100 KVA Transformer from work site to ESC, Mirzapur including loading & unloading charge
OM SAI ENTERPRISES (BID ID -5518294)
Lal Engineering co (BID ID -5518897)
SAKAT MOCHAN ELECTRICAL (BID ID -5530234)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .