Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 Cr+₹18.1 L (5.44%)Admitted-Finance B 4 PLOT NO 114 GURU KIRPA BUILDING SHIV SHAKTI NAGAR TN MISHRA MARG NIRMAN NAGAR JAIPUR JAIPUR RAJASTHAN JAIPUR RAJASTHAN 302019 | JAIPUR | RAJASTHAN | 302019 | ₹3.5 Cr+₹18.1 L (5.44%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 Cr+₹33.6 L (10.1%)Admitted-Finance | ₹3.7 Cr+₹33.6 L (10.1%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Fulfil PQC |
| Sl No | Description | Qty | Unit | M/s Shri Krishan Construction Co. L3 | SWANIP INFRACON PRIVATE LIMITED L2 | SAI INFRASTRUCTURE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer - in- charge. | 25 | cum | 1,45,250 ₹1,71,395 | 65,000 ₹76,700 Lowest | 1,37,500 ₹1,62,250 |
| 2.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer - in - charge.1:3:6 or richer mix | 30 | cum | 1,46,490 ₹1,72,858.2 | 73,500 ₹86,730 Lowest | 1,26,000 ₹1,48,680 |
| 3.00 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 140 | cum | 2,32,680 ₹2,74,562.4 | 3,37,400 ₹3,98,132 | 2,10,000 ₹2,47,800 Lowest |
| 4.00 | DISMANTLING ROOFING INCLUDING RIDGES, HIP VALLEYS AND GUTTERS ETC. AND DEPOSITING THE SERVICABLE MATERIALS IN CENTRAL/SITE STORES AND INCLUDING DISPOSAL OF UNSERVICABLE MATERIALS WITHIN 50 M LEAD AS PER DIRECTION OF ENGINEER IN CHARGE. ASB | 20 | sqm | 33,600 ₹39,648 | 13,500 ₹15,930 Lowest | 36,900 ₹43,542 |
| 5.00 | Dismantling of steel structure such as platforms, support railing, hoppers, chutes, ducts, cells dismantling of mech. Equipments and elect. Equipments/ assemblies including rubber lined pipe line all heights | 0.5 | MT | 7,350 ₹8,673 | 22,625 ₹26,697.5 | 7,000 ₹8,260 Lowest |
| 6.00 | DISMANTLING WHITE VETROUS CHINA WASH BASIN/SINK/URINAL INCLUDING FITTINGS AND REMOVAL OF UNSERVICABLE MATERILAS TO SITE/CENTRAL STORES AS PER DIRECTION OF ENGINEER IN-CHARGE. | 2 | NOS | 10,080 ₹11,894.4 | 2,500 ₹2,950 Lowest | 7,000 ₹8,260 |
| 7.00 | DISMANTLING INDIAN TYPE W.C.PAN/EUROPIAN TYPE W.C.PAN, INCLUDING FOOR REST AND FITTINGS, BUT EXCLUDING CISTERN AND REMOVAL OF UNSERVICABLE MATERILAS AND DEPOSITING THE SERVICABLE MATERILAS TO SITE/CENTRAL STORES AS PER THE DIRECTION OF ENGINEER IN-CHARGE | 2 | NOS | 9,170 ₹10,820.6 | 2,820 ₹3,327.6 Lowest | 8,000 ₹9,440 |
| 8.00 | Deployment of JCB for removing SILT or handling of EARTH | 50 | HRS | 79,450 ₹93,751 | 62,500 ₹73,750 Lowest | 80,000 ₹94,400 |
| 9.00 | Hiring Charges for Tractor & Trolley with Driver and Helper per Hour for Minimum deployment of 05 Hrs/Day. | 50 | HRS | 44,250 ₹52,215 | 57,500 ₹67,850 | 37,150 ₹43,837 Lowest |
| 10.00 | SUPPLY AND STACKING THE QUERRY RUBBISH WITH ALL LEADS AND LIFTS AT SITE,SPREADING,WATERING AND ROLLING COMPLETE FOR FILLING OF THE LARGE POT HOLES OF THE ROAD | 150 | cum | 2,87,700 ₹3,39,486 | 7,80,000 ₹9,20,400 | 2,55,000 ₹3,00,900 Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹6.9 L
Closing Date
9 May 2026, 2:30 pmClosed
ABHISHEK PAREEK
HCL/KCC
RFQ 11955 FOR CONSTRUCTION OF FOUNDATION OF BANWAS FAN, ELECTRICAL CONTROL ROOM, MECHANICAL ROOM AND TRANSFORMER FOUNDATION
2026_HCL_275140_1
RFQ 11955 for CONSTRUCTION OF FOUNDATION OF BANWAS FAN, ELECTRICAL CONTROL ROOM, MECHANICAL ROOM
Open Tender
Civil Works - Buildings
Fixed-rate
120 days
HCL/KCC
Enclosed in Annexure
7 documents required · 7 mandatory
₹0
₹6.9 L
Yes
19 Jun 2026
18 Apr 2026
11 May 2026
18 Apr 2026
9 May 2026
18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer - in- charge. | 25 | cum | - | - |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer - in - charge.1:3:6 or richer mix | 30 | cum | - | - |
| 3 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 140 | cum | - | - |
| 4 | DISMANTLING ROOFING INCLUDING RIDGES, HIP VALLEYS AND GUTTERS ETC. AND DEPOSITING THE SERVICABLE MATERIALS IN CENTRAL/SITE STORES AND INCLUDING DISPOSAL OF UNSERVICABLE MATERIALS WITHIN 50 M LEAD AS PER DIRECTION OF ENGINEER IN CHARGE. ASB | 20 | sqm | - | - |
| 5 | Dismantling of steel structure such as platforms, support railing, hoppers, chutes, ducts, cells dismantling of mech. Equipments and elect. Equipments/ assemblies including rubber lined pipe line all heights | 0.5 | MT | - | - |
| 6 | DISMANTLING WHITE VETROUS CHINA WASH BASIN/SINK/URINAL INCLUDING FITTINGS AND REMOVAL OF UNSERVICABLE MATERILAS TO SITE/CENTRAL STORES AS PER DIRECTION OF ENGINEER IN-CHARGE. | 2 | NOS | - | - |
| 7 | DISMANTLING INDIAN TYPE W.C.PAN/EUROPIAN TYPE W.C.PAN, INCLUDING FOOR REST AND FITTINGS, BUT EXCLUDING CISTERN AND REMOVAL OF UNSERVICABLE MATERILAS AND DEPOSITING THE SERVICABLE MATERILAS TO SITE/CENTRAL STORES AS PER THE DIRECTION OF ENGINEER IN-CHARGE | 2 | NOS | - | - |
| 8 | Deployment of JCB for removing SILT or handling of EARTH | 50 | HRS | - | - |
| 9 | Hiring Charges for Tractor & Trolley with Driver and Helper per Hour for Minimum deployment of 05 Hrs/Day. | 50 | HRS | - | - |
| 10 | SUPPLY AND STACKING THE QUERRY RUBBISH WITH ALL LEADS AND LIFTS AT SITE,SPREADING,WATERING AND ROLLING COMPLETE FOR FILLING OF THE LARGE POT HOLES OF THE ROAD | 150 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_321366.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .