| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC S A | L1 | Accepted-AOC Quoted less than Tender Value | |
| 2 | L2₹9.9 L+₹21,717.36 (2.25%)Rejected-AOC | L2 | Rejected-AOC Quoted more than Tender Value |
| Sl No | Description | Qty | Unit | S A Srinivasan L1 | M.Ravi shankar L2 |
|---|---|---|---|---|---|
| 1.00VELLORE DISTRICT RAISING OF CEMENT CONCRETE DRIANAGE MAARIYAMMAN KOIL TO ANGANWADI & PROVDING CC PAVEMENT NEAR SATHIYAMNAGALAM KALVAI CULVERT AT AD COLONY IN VIRINCHIPURAM PANCHAYAT ANAICUT BLOCK GENERAL FUND 2025-26 PACKAGE NO 02 | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 1.96 | cum | 263.65 ₹516.75 Lowest | 269.58 ₹528.38 |
| 3.00 | Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 11.65 | cum | 5,333.9 ₹62,139.94 Lowest | 5,453.97 ₹63,538.75 |
| 4.00 | Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete | 266.78 | Sqm | 547.23 ₹1,45,990.02 Lowest | 559.55 ₹1,49,276.75 |
| 5.00 | Cement concrete in 1:3:6 mix using 20mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 55.24 | cum | 6,303.61 ₹3,48,211.42 Lowest | 6,445.51 ₹3,56,049.97 |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 37.1 | cum | 6,914.73 ₹2,56,536.48 Lowest | 7,070.39 ₹2,62,311.47 |
| 7.00 | Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 4.5 | Sqm | 592.66 ₹2,666.97 Lowest | 606.01 ₹2,727.05 |
| 8.00 | Providing Bitumen Pad charges for the work etc | 1 | no | 999.5 ₹999.5 Lowest | 1,022 ₹1,022 |
| 9.00 | Provision of Name board Charges | 1 | no | 499.75 ₹499.75 Lowest | 511 ₹511 |
| 10.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Each | 1,47,160.95 ₹1,47,160.95 Lowest | 1,50,473.77 ₹1,50,473.77 |
Tender Value
Refer Docs
EMD Value
₹19,480
Closing Date
17 Sept 2025, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER
THE BLOCK DEVELOPMENT OFFICER, ANAICUT
VELLORE DISTRICT RAISING OF CEMENT CONCRETE DRIANAGE MAARIYAMMAN KOIL TO ANGANWADI AND PROVDING CC PAVEMENT NEAR SATHIYAMNAGALAM KALVAI CULVERT AT AD COLONY IN VIRINCHIPURAM PANCHAYAT ANAICUT BLOCK GENERAL FUND 2025-26 PACKAGE NO 02
2025_RDTN_601914_1
A3/2589/2024 ACT SEP 45-25
Open Tender
Civil Works
Item Rate
180 days
THE BLOCK DEVELOPMENT OFFICE, ANAICUT
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹19,480
9 Oct 2025
9 Sept 2025
17 Sept 2025
9 Sept 2025
17 Sept 2025
9 Sept 2025
Amount
VELLORE DISTRICT RAISING OF CEMENT CONCRETE DRIANAGE MAARIYAMMAN KOIL TO ANGANWADI & PROVDING CC PAVEMENT NEAR SATHIYAMNAGALAM KALVAI CULVERT AT AD COLONY IN VIRINCHIPURAM PANCHAYAT ANAICUT BLOCK GENERAL FUND 2025-26 PACKAGE NO 02
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete
Cement concrete in 1:3:6 mix using 20mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Providing Bitumen Pad charges for the work etc
Provision of Name board Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.Ravi shankar (BID ID -1457537)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_719568.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .