Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
27 Jul 2026, 3:00 pm2d left
BDO VP SRIMUSHNAM
Block Development office Srimushanm
Construction of Mini CSC at Near PUPS Perur Panchayat at Srimushnam Block
2026_RDTN_684932_4
A3/558/2025 GF VP 2026-27
Open Tender
Civil Works - Buildings
Item Rate
SRIMUSHNAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹6,000
Yes
Panchayat union srimushnam
10 Jul 2026
10 Jul 2026
27 Jul 2026
10 Jul 2026
27 Jul 2026
10 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | - | mt | 263.78 | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 5.58 | Cum | 2,445.47 | ₹13,645.72 |
| 3 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Upto Basement | 2.27 | Cum | 6,309.66 | ₹14,322.93 |
| 4 | Filling with river M-Sand including cost and coveyance of all materials to work site and all labour charges etc. | 2.83 | Cum | 6,341.13 | ₹17,945.4 |
| 5 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 2.84 | Cum | 6,434 | ₹18,272.56 |
| 6 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Below Basement. | 15.05 | sqm | 2,445.47 | ₹36,804.32 |
| 7 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete Upto basement | 3.76 | Cum | 6,309.66 | ₹23,724.32 |
| 8 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 10.57 | Cum | 6,341.13 | ₹67,025.74 |
| 9 | ReFilling with including cost and coveyance of all materials to work site and all labour charges etc. | 2.24 | Cum | 2,445.47 | ₹5,477.85 |
| 10 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. Above Basement. | 34.8 | sqm | 6,309.66 | ₹2,19,576.17 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_823385.xls
BOQ • 0.27 MB
TechnicalBid.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].