Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-Finance | ₹7.2 L | L1 | Accepted-Finance SELECTED IN TRANSPARENT LOTTERY |
| 2 | L1₹7.8 LAccepted-Finance AT P O TOPE P S ATTABIRA DIST BARGARH | BARGARH | ODISHA | 768027 | ₹7.8 L | L1 | Accepted-Finance NOT SELECTED IN TRANSPARENT LOTTERY |
| 3 | L2₹7.2 LAccepted-Finance | ₹7.2 L | L2 | Accepted-Finance NOT SELECTED |
Tender Value
₹9.4 L
EMD Value
₹9,448
Closing Date
15 May 2026, 5:00 pmClosed
SE, BID, BURLA
O/O THE SE, BID, BURLA
Construction of both side Guard wall with bed lining in between RD 331m to 380m, RD 718m to 770m and bed lining from RD 770m to 930m of Bhalupali Distributary for the year 2026-27
2026_CEBBU_128859_1
BID-02(8 OF 14)/26-27
Open Tender
Civil Works - Canal
45 days
BURLA
REFER DTCN
2 documents required · 2 mandatory
₹4,000
₹9,448
Yes
19 Jun 2026
8 May 2026
18 May 2026
8 May 2026
15 May 2026
8 May 2026
8 May 2026 - 15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil including dressing and levelling the bed and depositing the excavated materials within 50m of ititial lead and initial lift of 1.5m and as directed by the Engineer-in-charge | - | Cum | 276.9 | - |
| 2 | Filling in foundation and plinth with excavated materials including watering, ramming etc. complete as per the direction of the Engineer-in-chagre. | 24.07 | Cum | 153.8 | ₹3,701.97 |
| 3 | Spreading watering & ramming sand ( for filling) of approved quality on finished approved surface in canal bed / structrual bed portion including cost, carriage, royalty & taxes with all leads, lifts, delifts, construction & removal of coffer dam & dewatering if required with all other incidental charges etc. complete as per drawing specification and direction of the Engineer-in-charge. | 79.62 | Cum | 609.4 | ₹48,520.43 |
| 4 | CC M15 grade with 20 mm & down grade size hard granite crusher broken chips free from weathered skin including cost, conveyance, royalty and taxes of all materials to the work site, machine mixing, hoisting and laying of concrete in position & compacted properly with all leads, lifts, sundries, T & P required for the work with curing etc. complete as per direction of Engineer in charge. | 128.74 | Cum | 5,818.9 | ₹7,49,125.19 |
| 5 | Rigid and smooth centering and shuttering for C.C wall including false works and dismentaling them after casting including cost of all materials with all leads, lifts & delifts & all other incidental charges etc. complete as per the direction of Engineer in charge. | 367.64 | Sqm | 248.7 | ₹91,432.07 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_589863.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.25 MB
DTCN8.pdf
Tender Documents • 2.47 MB
BOQ_589863.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid