| 1.00Vellore District Strengthening of the Two Roads in Vellore Block under MGSMT 2025-26 CGF Component under SFC Grants 2026-27 | |||||
| 2.00Strengthening the Road From Aruljothi nagar to Venkatapuram BG Road in Venkatapuram Panchayat Km 0/0 - 0/920, R-165 | |||||
| 3.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete | 220.8 | sqm | 6.36 ₹1,404.29 | 6.44 ₹1,421.95 |
| 4.00 | Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 1,150 | sqm | 23.36 ₹26,864 | 23.66 ₹27,209 |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 82.8 | cum | 341.03 ₹28,237.28 | 345.53 ₹28,609.88 |
| 6.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 165.6 | cum | 140.42 ₹23,253.55 | 142.28 ₹23,561.57 |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete | 517.5 | cum | 2,605.11 ₹13.5 L | 2,639.5 ₹13.7 L |
| 8.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete | 3,450 | sqm | 86.47 ₹3.0 L | 87.61 ₹3.0 L |
| 9.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete | 3,450 | sqm | 20.23 ₹69,793.50 | 20.49 ₹70,690.50 |
| 10.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 86.25 | cum | 11,654.97 ₹10.1 L | 11,808.84 ₹10.2 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
2 Mar 2026, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA VELLORE
THE PROJECT DIRECTOR DRDA VELLORE
Vellore District Strengthening of the Two Roads in Vellore Block under MGSMT 2025-26 CGF Component under SFC Grants 2026-27
2026_RDTN_662363_1
A7/6191/2024
Open Tender
Civil Works
180 days
DRDA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹50,000
VELLORE DRDA
23 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
23 Feb 2026
Vellore District Strengthening of the Two Roads in Vellore Block under MGSMT 2025-26 CGF Component under SFC Grants 2026-27
Strengthening the Road From Aruljothi nagar to Venkatapuram BG Road in Venkatapuram Panchayat Km 0/0 - 0/920, R-165
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM. stone
60 cm Equilateral triangle cautionary signboard
Strengthening the Road From Pulimedu Rangankottai Road in Pulimedu Panchayat Km 0/0 - 0/520, R-111
Clearing the scrub jungles including cutting the scrubs and removing away from site etc Complete
Picking and Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it for all including all cost and Convenyance for etc Complete
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc all including all cost and Convenyance for etc Complete
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM. stone
60 cm Equilateral triangle cautionary signboard
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tendernotice_2.pdf
PDF • 0.74 MB
Tendernotice_3.pdf
PDF • 0.37 MB
BOQ_795163.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid