Loading…
Loading…
Tender Value
₹7.5 L
EMD Value
₹15,030
Closing Date
12 Aug 2026, 12:00 pm
Executive officer
Jhumri Telaiya Nagar Parisha
Construction of RCC Drain from Ashok Sinha house via Dheerendra Jaiswal to Santosh Keshri House at Ward No-14
2026_UDD_116551_1
jmc/04/26-27(grp-26)
Open Tender
Civil Works
Percentage
90 days
jhumri talaiya nagar parishad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹15,030
29 Jul 2026
29 Jul 2026
13 Aug 2026
29 Jul 2026
12 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | 26.1 | M3 | 151.82 | ₹3,962.5 |
| 2 | Dismantling pucca brick or lime concrete work includind stacking serveable materials in countablr stacks with in 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 17.63 | M3 | 541.67 | ₹9,549.64 |
| 3 | Dismantling plain cement or lime concrete work includind stacking serveable materials in countablr stacks with in 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 13.05 | M3 | 955.89 | ₹12,474.36 |
| 4 | Providing clean coarse sand in filling foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm think with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per specification and direction of E/I. (Mode of measurement compacted volume) | 6.53 | M3 | 589.51 | ₹3,849.5 |
| 5 | Providing designation 75B one brick flat soiling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I. | 87 | M2 | 330.34 | ₹28,739.58 |
| 6 | Reinforced cement concrete work in wall (any thickness),Including attached pilaster ,buttresses,plinth and string course,fillets,columns,pillers ,piers etc all complete as per specification and direction of E/I. | 19.57 | M3 | 6,082.45 | ₹1,19,033.55 |
| 7 | Reinforcement cement concrete work in beams, suspended floors,roof having slope upto 15 landing, balcony ,shelves,chajja,lintel,bands etc all complete as per specification and direction of E/I. | 26.1 | M3 | 6,308.87 | ₹1,64,661.51 |
| 8 | Providing Tor steel reinforcement of 8mm dia bars cutting bending and binding with annealed wire with cost of wire, removal of roots, placing the rods in position as per approved disign and drawing all complete as per specification and direction of E/I. | - | MT | 83,314.02 | - |
| 9 | Providing Tor steel reinforcement of 10mm dia bars cutting bending and binding with annealed wire with cost of wire, removal of roots, placing the rods in position as per approved disign and drawing all complete as per specification and direction of E/I. | 1 | MT | 82,096.54 | ₹82,014.44 |
| 10 | Providing centring and shuttering including strutting, propping etc. and removal of formwork for foundations, footings, bases of column etc all complete as per specification and direction of E/I. | 478.5 | M2 | 194.5 | ₹93,068.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.26 MB
terms.pdf
Tender Documents • 3.22 MB
BOQ_157535.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].