| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75,145Accepted-Finance | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹80,200+₹5,055 (6.73%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹89,225+₹14,080 (18.7%)Accepted-Finance | L3 | Accepted-Finance FOUND OK |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
23 Dec 2021, 12:00 pmClosed
SE EDC-I ALIGARH
LAL DIGGI ALIGARH
Laying of LT ABC line in place of 11 KV line and installation of new 100 KVA T/F and other related work under EDD-I, Aligarh
2021_DVVNL_659164_1
EDCA-43/2021-22
Open Tender
Electrical Works
Item Rate
60 days
EDD-I ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
DVVNL AGRA
₹2,000
24 Dec 2021
18 Dec 2021
23 Dec 2021
18 Dec 2021
23 Dec 2021
18 Dec 2021
Amount
Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
PCC poles 8.5 Mtr.
Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC poles 8.5 Mtr./ST Pole 11 Mtr.
Erection of 11 KV line double pole on PCC/ST pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC poles 8.5 Mtr/ST Pole 11 Mtr.
Installation & fixing of 11 KV TPMO
Laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Conductor/Raccon Conductor
LT 3X50+1X35+1X16 bunch conductor
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
Grouting of PCC/ST poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size as per RESPO norms. This qty also includes the additional work of old & existing LT line which has to be converted into HT line. Presently the supports of old line do not have grouting.
PCC poles 8.5 Mtr
Dismantling and removal of existing conductor from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Conductor/GI Wire
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work
Providing and fixing of stay insulator.
Safe carriage of transformer from Store Center or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging etc. and also including the cost of labour, T&P and carrier etc. required for proper completion of work. (Distance 0 to 50 Km..
100 KVA T/F
Safe carriage of LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
Demounting & carriage of following capacity transformer due to damage of PCC poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
10/16 KVA T/F
SANJAY ELECTRICALS
RINBHA ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .