Mr.Puneet Khanna (Dir-Supply Chain Management)
Worley India Private Limited, New Energy House,RamakrishnaMandir Road, Kondivita, Andheri (East), Mumbai- 400 059, India
MODIFICATION AND EXTENSION OF MV SWITCHGEAR
2020_REFHQ_129188_1
44AC7500-00-ER-65-0006
Single
Electrical - Cables, Switchgear and Other Control Equipment
Supply
150 days
IOCL PANIPAT HARIYANA
3 documents required · 3 mandatory
Exempted
18 Mar 2021
28 Dec 2020
27 Jan 2021
28 Dec 2020
25 Jan 2021
11 Jan 2021
Modification & Extension of MV Switchgear of Substation-53
Extension of PCC Panel of Substaion-53 I. 53-PC-302 Switchgear panel (6 Nos. extension panels 3 nos. on each side of Main Bus bar) 4000A,415V, 50Hz, 50kA for 1 sec., 3 phase, 4wire, Single Front, Compartmentalized, Drawout Type, form 4B type separation, Existing PCC with 2 incomers & 1 bus coupler, Metal enclosed switchboard with Aluminum main busbar material, Internal Arc tested as per TR-61641:2014, full short circuit current i.e. 50kA for duration of 0.5 sec. along with PRESSURE FLAP releasing Arc gases, Meters, Relays with IEC 61850 protocol, Auxiliary relays, Protection, indication, alarms, Redundant Ethernet Switch & other components required for communication including looping FO cable , New Marshalling cabinet arrangement same as existing, etc., as applicable with all necessary accessories. Protection relay parametrization its associated software / hardware for each type of relay shall be considered. For Details of extension panel refer Single line diagram No. 44AC750000/E.01/0223/A0 for outgoing feeder details. + Required Hardware / Software for Hook-up with existing ECS / SCADA / DCS / Third Party equipment and necessary site support + Third Party inspection as per QAP, Supply of Start-up & Commissioning spares, Special tools & tackles for above items shall be in scope of manufacturer.
Extension of MCC Panel of Substaion-53 I. 53-MC-305 Switchgear panel (2 Nos. extension panels 1 no. on each side of Main Bus bar) II. 53-MC-306 Switchgear panel (2 Nos. extension panels 1 no. on each side of Main Bus bar) III. 53-MC-307 Switchgear panel (2 Nos. extension panels 1 no. on each side of Main Bus bar) IV. 53-MC-308 Switchgear panel (2 Nos. extension panels 1 no. on each side of Main Bus bar) V. 53-MC-309 Switchgear panel (2 Nos. extension panels 1 no. on each side of Main Bus bar) VI. 53-MC-311 Switchgear panel (2 No. extension panels 1 no. on each side of Main Bus bar) 800A,415V, 50Hz, 50kA for 1 sec., 3 phase, 4wire, Single Front, Compartmentalized, Drawout Type, form 4B type separation, Existing MCC with 2 incomers & 1 bus coupler, Metal enclosed switchboard with Aluminum main busbar material, Internal Arc tested as per TR-61641:2014, full short circuit current i.e. 50kA for duration of 0.5 sec. along with PRESSURE FLAP releasing Arc gases, Meters, Relays, Auxiliary relays, Protection, indication, alarms, New marshalling cabinet arrangement same as existing etc. as applicable with all necessary accessories. Protection relay parametrization its associated software / hardware for each type of relay shall be considered. For Details of extension panel refer Single line diagram No. 44AC750000/E.01/0224/A0 for outgoing feeder details. + Required Hardware / Software for Hook-up with existing ECS / SCADA / DCS / Third Party equipment and necessary site support + Third Party inspection as per QAP, Supply of Start-up & Commissioning spares, Special tools & tackles for above items shall be in scope of manufacturer.
Modification of PCC Panel of Substation-53 I. 53-PC-302 Switchgear PCC panel (4 Nos. modifications for details refer Single line diagram 44AC750000/E.01/0223/A0) II. 53-PC-304 Switchgear PCC panel (2 Nos. modifications for details refer Single line diagram 44AC750000/E.01/0223/A0) 4000/3000A (or same as existing PCC panel),415V, 50Hz, 50kA for 1 sec., 3 phase, 4wire, Single Front, Compartmentalized, Drawout Type, Existing PCC with 2 incomers & 1 bus coupler, Metal enclosed switchboard with Aluminum main busbar material, Meters, Relays with IEC 61850 protocol, Auxiliary relays, Protection, indication, alarms, Redundant Ethernet Switch & other components required for communication including looping FO cable, New Marshalling cabinet arrangement as per existing panel etc., as applicable with all necessary accessories. Protection relay parametrization with its associated software / hardware for each type of relay shall be considered. For Details of modification panel refer Single line diagram No. 44AC750000/E.01/0223/ A0 for outgoing feeder details. + Required Hardware / Software for Hook-up with existing ECS / SCADA / DCS / Third Party equipment and necessary site support + Third Party inspection as per QAP, Supply of Start-up & Commissioning spares, Special tools & tackles for above items shall be in scope of manufacturer.
Modification of MCC Panel of Substation-53 I. 53-MC-306 Switchgear MCC panel (6 Nos. modifications for details refer Single line diagram 44AC750000/E.01/0224/A0) II. 53-MC-308 Switchgear MCC panel (1 No. modifications for details refer Single line diagram 44AC750000/E.01/0224/A0) III. 53-MC-311 Switchgear MCC panel (6 Nos. modifications for details refer Single line diagram 44AC750000/E.01/0224/A0) 800A,415V, 50Hz, 50kA for 1 sec., 3 phase, 4wire, Single Front, Compartmentalized, Drawout Type, form 4B type separation, Existing MCC with 2 incomers & 1 bus coupler, Metal enclosed switchboard with Aluminum main busbar material, Meters, Relays, Auxiliary relays, Protection, indication, alarms, New marshalling cabinet arrangement same as existing etc., as applicable with all necessary accessories. Protection relay parametrization with its associated software / hardware for each type of relay shall be considered. Please refer drawing No. 44AC750000/E.01/0224/A0 for outgoing feeder details. + Required Hardware / Software for Hook-up with existing ECS / SCADA / DCS / Third Party equipment and necessary site support + Third Party inspection as per QAP, Supply of Start-up & Commissioning spares, Special tools & tackles for above items shall be in scope of manufacturer.
Extension of ASB Panel of Substation-53 I. 53-AS-320 ASB panel (1 No. extension panel on left side of Main Bus bar) 630A,415V, 50Hz, 50kA for 1 sec., 3 phase, 4wire, Single Front, Compartmentalized, Drawout Type, form 4B type separation, ASB with 2 incomers & 1 bus coupler, Metal enclosed switchboard with Aluminum main busbar material, Meters, Relays, Auxiliary relays , Protection, indication, alarms, New marshalling cabinet arrangement as per existing panel, etc., as applicable with all necessary accessories. Protection relay parametrization & testing kits with its associated software / hardware for each type of relay shall be considered. Please refer drawing No. 44AC7500-00/E.01/0226/A0 for outgoing feeders. + Required Hardware / Software for Hook-up with existing ECS / SCADA / DCS / Third Party equipment and necessary site support + Third Party inspection as per QAP, Supply of Start-up & Commissioning spares, Special tools & tackles for above items shall be in scope of manufacturer.
Required number of breakers lifting trollies suitable for each rating. + Third Party inspection as per QAP, Supply of Start-up & Commissioning spares, Special tools & tackles for above items shall be in scope of manufacturer.
Description of Work / Item(s)
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.1 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.2 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.3 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.4 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.5 OF BOQ1
RECOMMENDED SPARES FOR TWO YEARS O&M – FOR SR NO 1.6 OF BOQ1
Description of Work / Item(s)
CHARGES FOR SITE SUPERVISION OF ERECTION,PRE-COMMISSIONING / COMMISSIONING & TRAINING OF ALL SUPPLIES AS PER MR. Refer Annexure-F of ITB for Terms & conditions for Site Supervision Services and Training for Indian bidders.
Modification & Extension of MV Switchgear of Substation-53: Total 25 Mandays estimated for site Supervision of installation/ erection, testing and commissioning as listed at site as per instructions to bidder. FOR BOQ Sl.No.1.1 to 1.5 For Extension of PCC Panel of Substaion-53 Supervision of installation - 4 Man-days Supervision of testing and commissioning – 2 Man-days For Extension of MCC Panel of Substaion-53 Supervision of installation: 4 Man-Days Supervision of testing and commissioning – 2 Man-days For Modification of PCC Panel of Substation-53 Supervision of installation: 2 Man-Days Supervision of testing and commissioning – 2 Man-days For Modification of MCC Panel of Substation-53 Supervision of installation - 3 Man-days Supervision of testing and commissioning – 2 Man-days for Extension of ASB Panel of Substation-53 Supervision of installation: 2 Man-Days Supervision of testing and commissioning – 2 Man-days Total : 25 Man-Days
Per diem charges (per person) for 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days/ holidays (as applicable to Refinery site).
Modification & Extension of MV Switchgear of Substation-53 : Total 5 Mandays estimated for Training as listed at site as per instructions to bidder. FOR BOQ Sl.No.1.1 to 1.5 Total : 5 Man-Days
Charges of training for 5 man days at IOCL site for BOQ Sl.No.1.1 to 1.5 of BOQ1
Description of Work / Item(s)
Schedule of rates for Addition / Deletion of accessories
Unit rate for each type of feeder (power / motor) including vacant module & dummy panel
Power feeder - 800A
Motor feeders Outgoing ACB feeder 800A
Power / Motor feeders Outgoing SFU Power feeder 63A, 125A, 250A, 400A
Unit rates for future additions / deletions of Power / Motor feeders: a) Outgoing SFU Power feeder - 63A, b) Outgoing SFU Power feeder - 125A, c) Outgoing SFU Power feeder - 250A, d) Outgoing SFU Power feeder - 400A e) Outgoing conventional DOL Starter feeder with SFU, Overload relay, Contactor as per Type II co-ordination chart for Motor rating less than 5.5 kW f) Outgoing conventional DOL Starter feeder with SFU, Overload relay, Contactor as per Type II co-ordination chart for Motor rating ≥5.5kW to ≤11kW g) Outgoing conventional DOL Starter feeder with SFU, Overload relay, Contactor as per Type II co-ordination chart for Motor rating ≥15kW to ≤22kW h) Outgoing conventional DOL Starter feeder with SFU, Overload relay, Contactor as per Type II co-ordination chart for Motor rating ≥30kW to ≤45kW & 55kW
Dummy Panel
16 port Ethernet switch
Vacant module
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .