| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹17.7 L+₹2.1 L (13.2%)Rejected-AOC MADHEPURA 07 MADHEPURA | MADHEPURA | BIHAR | 852101 | L2 | Rejected-AOC L2 | |
| 3 | L3₹18.3 L+₹2.6 L (16.6%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹18.8 L
EMD Value
₹37,600
Closing Date
24 Aug 2023, 5:00 pmClosed
EE ICD KARWI
OFFICE OF THE EE ICD KARWI
Construction of Drainage Syphon at Km 20.500 of Kabrai Main Canal.
2023_UPIDC_829639_2
01/EE/2023-24
Open Tender
Civil Works
Item Wise
60 days
Distt Mahoba
As per NIT
2 documents required · 2 mandatory
₹1,154
₹37,600
31 Oct 2023
18 Aug 2023
25 Aug 2023
18 Aug 2023
24 Aug 2023
18 Aug 2023
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. But excluding GST.
Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc . All complete. But excluding GST.
Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST.
R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work.But excluding GST.
Laying C.C. work 1:2:4 with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work.But excluding GST.
Grouted Stone Pitching in 1:4 CM including all cost of material, labour, T&P and proper completion of work.But excluding GST.
Supply & Laying 1000 mm dia R C C hume pipe including all cost of loading, unloading, carriage, all material ,collor joint with cement ,jute ,labour ,etc But excluding GST.
Centering and Shuttering of C.C. Work including all material, labour T&P etc. all complete. But excluding GST.
Raised Struck Cement pointing in 1:2 cement mortor with coarse sand including all material, labour, T&P etc. complete.But excluding GST.
Earth Work in Back Filling with all cost of labour T&P etc all complete But excluding GST.
RAMESH KUMAR
NARGIS BEGAM
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .