| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.1 LAccepted-Finance | ₹6.1 L | 1 | Accepted-Finance Admitted |
| 2 | 2₹6.3 LAccepted-Finance | ₹6.3 L | 2 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M.B. Enterprises L2 | A.S.ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.01 | Disconnection of HT main HT supply form main HT panel after proper switching of 11KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservative tank all protection relays cable and boxes vent pipes and other items as required. | 2 | Jobs | 24,000 ₹28,320 | 22,990 ₹27,128.2 |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precautions to prevent the winding damage as required cutting of old overheated insulation of winding Andre insulation of weak point with the help of HT insulation material and proper taping etc. | 2 | Jobs | 96,000 ₹1,13,280 | 95,590 ₹1,12,796.2 |
| 1.03 | Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage. | 2 | Jobs | 35,500 ₹41,890 | 35,090 ₹41,406.2 |
| 1.04 | Replacement of tape changer. | 1 | Jobs | 19,300 ₹22,774 | 18,400 ₹21,712 |
| 1.05 | Replacement of Silica Gel. | 2 | Jobs | 5,000 ₹5,900 | 4,840 ₹5,711.2 |
| 1.06 | Complete assembling of transformer cleaning of complete transformer tightening of all connections of incoming and outgoing side and testing and checking of IR test with megger of winding and cable of both sides with HI port machine. | 2 | Jobs | 45,000 ₹53,100 | 44,770 ₹52,828.6 |
| 1.07 | Filling of transformer oil to up to top up level as required to make power | 527 | Ltr. | 78,523 ₹92,657.14 | 78,259.5 ₹92,346.21 |
| 1.08 | P/fixing of winding protection pad. | 2 | Set | 16,000 ₹18,880 | 15,730 ₹18,561.4 |
| 1.09 | Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays and testing the same | 2 | Jobs | 25,000 ₹29,500 | 24,200 ₹28,556 |
| 1.10 | Repairing of LT Copper bolt, remettaling and finishing the same as per original shap and size | 8 | Jobs | 33,200 ₹39,176 | 32,000 ₹37,760 |
Tender Value
Refer Docs
EMD Value
₹12,300
Closing Date
16 Mar 2026, 3:30 pmClosed
EE(EnM)M-12
D-Block Saket
Servicing Dehydration of 2 Nos. 630 KVA KEC Make Transformer No. 1 and 2 installed at Nehru Place BPS under Kalkaji Constituency AC-51. (Re-Invite)
2026_DJB_288208_1
NIT No. 36/EE(EnM)M-12/2025-26
Open Tender
Miscellaneous Works
30 days
EE(EnM)M-12
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
EE(EnM)WSS-II
₹12,300
25 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
Disconnection of HT main HT supply form main HT panel after proper switching of 11KV VCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservative tank all protection relays cable and boxes vent pipes and other items as required.
Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precautions to prevent the winding damage as required cutting of old overheated insulation of winding Andre insulation of weak point with the help of HT insulation material and proper taping etc.
Replacement of top cover gasket vertical vent gasket & missing hardware to stop the oil leakage.
Replacement of tape changer.
Replacement of Silica Gel.
Complete assembling of transformer cleaning of complete transformer tightening of all connections of incoming and outgoing side and testing and checking of IR test with megger of winding and cable of both sides with HI port machine.
Filling of transformer oil to up to top up level as required to make power
P/fixing of winding protection pad.
Checking & matching of control wiring of all protection relays and calibration of bucchlaz relay and protection relays and testing the same
Repairing of LT Copper bolt, remettaling and finishing the same as per original shap and size
Repair of cooling fins, replacement of cooling fins gasket and oil seal for stopping the leakage.
Dehydration and filtration of complete transformer oil and checking the die ectric strength up to 50 KV at side as required.
Complete cleaning and chemically washing of oily and muddy transformer body and painting of transformer with enamel paint.
Insulating the LT Cable and tightening of thimble as per site requirement.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_382143.xls
BOQ • 0.25 MB
2.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid